Scott,
We have completed an audit of the Professional Fees for the
Ashland Police Facility Remodel and Addition with the following
comments:
1. Straus & Seibert Architects, LLP standard for fee submittals
Is to list Basic Services (Architectural, Structural, Mechanical
and Electrical) separate from Other Consultant Fees (such
as, Civil engineering, communications, cost estimating,
Interiors, landscaping, lighting design, security design, value
engineering, LEED design, etc., because each project will
require a different set of consultant services. Our Proposal
for service was submitted using the above standard, please
see our Cost Budget Summary dated April 21, 2011 in our
original proposal.
Up to our current completion including Change in Service#1
"Other Consultant Fees" were not included in the
Development Budget. "Other Consultants" retained to-date
and included in Change in Service #2 are: Cost Estimating
and Landscape Design. It has been determined working
with the Police department that all other consultants besides
Cost Estimating and Landscape Design will not be required
or their services have been absorbed by the existing
contract. The Landscape fee has been carried through as
originally stated at $3,893. Scope Changes to review two
buildings, HVAC changes and floor changes have Increased
the Cost Estimating fee by approximately$3,000 to a total of
$8,271.
2. As a result of the findings in the Geotechnical Report a
change in the foundation and floor system has been made to
reduce the construction cost. The original assumption for
the foundation and floor were to continue with a concrete
arm
r�
1175 E.Main St.,S"ita 7F
MEDFORD,OREGON 975"
E:MI-7794747 F.SW79,=
rrereouaarch ilec U.cnm
slab on grade and has been changed to a wood floor system
allowing for less excavation and structural fill for project
construction cost saving. The fee for the Structural Scope
Change is $2,500, also included in Change in Service#2.
Attached Please find the Change In Service Agreement#2 in the
amount of$14,664,for your review and approval.
Please contact our office if you have additional questions.
F gard s,S AIA, NCARB
Partner
Page 1 / 1
�. CITY OF lTY RECORDER
1 V D DATE' PO NUMBER
AS H LA
20 E MAIN ST. 7/1/2011 10196
ASHLAND, OR 97520
(541)488-5300
VENDOR: 016096 SHIP TO: Ashland Public Works
STRAUS & SEIBERT ARCHITECTS (541)488-5587
1175 E. MAIN STREET SUITE 2E 51 WINBURN WAY
MEDFORD, OR 97504 ASHLAND, OR 97520
FOB Point: Req.No.:
Terms: Net Dept.:
Req.Del.Date: Contact: Terry Holderness
Special Inst: Confirming? No
.z_„Quanta ,'Unit 'it - � .Description - '` z :'Unit Price __ .'Ezt:Pnce ;
THIS IS A REVISED PURCHASE ORDER
PHASE 1 -Architectural Design Services 26,210.00
Police Department Grove Remodel
Contract for Personal Services
Beginning date: 05/25/2011
Completion date: 11/2512011
Insurance required/On file
PHASE 2-Architectural Design Services 20,959.00
Police Department Grove Remodel
PHASE 3 -Architectural Design Services 46,851.00
Police Department Grove Remodel
Processed change order 08/16/2011 10,200.00
Change Order#1 -Additional study
effort within project scope for Phase 1
Processed change order 02/08/2012 6,551.00
Change Order#1 -Additional Study
Effort-Architectural for Phase 3
Processed change order 05/07/2012 14,664.00
Change Order#3-Additional Study
Effort-Architectural. Approved by
Council 05/01/2012.
SUBTOTAL 125 435.00
BILL TO:Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2028 TOTAL 125,435.00
ASHLAND, OR 97520
;,Account Numbeq ,1;,_ _':.Project Numtier ,Amount, Account Number '. ;,;,:Project Number ,:. Amount
E 110.06.09.00.704200 E 201020.100 125 435.00
Authorize,ig'S nature VENDORCOPY
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM ASHLAND
Request for a Change Order
Name of Supplier 1 Contractor I Consultant:Straus$Seibert Total amount of this
contract amendment:
Purchase Order Number:10196
Title I Description:Architectural Services Police Department $14;664.00
M Per attached contract amendment
Contract Amendment
Original contract amount $94,020.00 100 %of original contract
Total amount of previous contract amendments $16.751.00 17.8 %of original contract
Amount of this contract amendment $14.664.00 15.6 %of original contract
TOTAL AMOUNT OF CONTRACT $125,435.00 33.4 %of original contract
In accordance with OAR 137-047-0800:1)The amendment is within the scope of procurement as described in the solicitation documents,Sole Source notice or approval of Special
Procurement 2)The amendment is necessary to comply with a change in law that affects performance of the contract.3)The amendment results from renegotiation of the terms and
conditions,including the contract price,of a contract and the amendment is advantageous to the City of Ashland,subject to all of the following conditions:a)goods and services to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract,b)The City determines that,with all things considered,the
amended contract is at least as favorable to the City as the unamended contract c)The amended contract does not have a total term greater than allowed in the solicitation document
contract or approval of a Special Procurement An amendment is not within the scope of the procurement ff the City determines that if it had described the changes to be made by the
amendment in the procurement documents,it would likely have increased competition or affected award of contract
Contract amendment is within the scope of procurement: YES X NO' (If"NO",requires Council approval I Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT-Less than$5.000 INVITATION TO BID or COOPERATIVE PROCUREMENT,ORF or
El'YES',the total amount of contract and REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
cumulative amendments<$6,000. ❑ 'YES',the total amount of cumulative El'YES',the total amount of original contract and
❑If'NO',amount exceeding authority requires amendments<-25%of original contract amount or cumulative amendments:5$100K for Goods&
Council approval.Attach copy of Council $250,000 whichever is less. Services,s$75K for Personal Services,<$50K for
Communication. ®If'NO',amount exceeding authority requires Attorney Fees.
❑ Exempt-Reason: - Council approval.Attach copy of Council - ❑ If'NO',amount exceeding authority requires
Communication. sIr(Z ;1L Council approval.Attach copy of Council
❑ Exempt-Reason: Communication.
❑ Exempt-Reason:
INTERMEDIATE PROCUREMENT SOLE SOURCE EMERGENCY PROCUREMENT
Goods&Services-$5,000 to$100,000 ❑ 'YES',the total amount of cumulative ❑ Written Findings:Document the nature of the
Personal Services -$5.000 to$75.000 amendments<-25%of original contract amount or emergency,including necessity and circumstances
❑ 'YES',the total amount of cumulative $250,000 whichever is less. requiring the contract amendment
amendments:c 25%of original contract amount. ❑If'NO',amount exceeding authority requires ❑ Obtain direction and written approval from City
❑ If"NO",amount exceeding authority requires Council approval.Attach copy of Council Administrator
Council approval.Attach copy of Council Communication. ❑ If applicable,attach copy of Council
Communication. ❑ Exempt-Reason: Communication
❑ Exempt-Reason: ❑ Exempt-Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
E3'YES',the total amount of original contract and cumulative E-1'YES',the orioinal contract was approved by City Council.
amendments are within the amount and terms initially approved by Provide date approved by City Council: (Date)
Council as a Special Procurement. If'NO',Council approval is required.Attach copy of Council Communication.
❑ If'NO",amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach cogy of Council Communication.
Project Number 7-0-k 0- - t0 AccountNumber lIO-06-MR-00-- aC4ZOO Account Number----------
'Expenditure must he charged to the appropriate account numbers for the financials to reflect the actual expenditures accurately. Attach extra pages if needed.
Employee Signat 4 ure• l Department Head Signature: ti
ual to or greater thaq$5, 0)
Funds appropriate forcui fiscaly r. Ell NO Cho �L/�--
Finance Director(Equal to org rthan$5,000) Date
Comments:
Form#10-Contract Amendment Approval Request Form, Request for a Change Order,Page 1 of 1,4/17/2012
CITY OF
ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE ORDER NO. 3
PROJECT: 'Architectural Services-Police Station DATE: 04/09/12
LOCATION: Ashland OR. PROJECT NO.: 2010-20
CONTRACTOR: Straus&Seibert
You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the
Engineer:
Item No. Descri tion Quantity Unit Price Amount
Item#I Additional Study Effort-Architectural 1 $14,664 `+$Ttk�� Y`9F664 b
Item#2 $ � '
Item#3 ;'$
Item#4
Item#5 $
Total this Change Order $ 14,66'-4:00
Previous Change Order $ 16;75x1.00 -
Original Contract Total $ 9402000r
Revised Contract Total $ 125,435.00
PERCENT CHANGE OF ORIGINAL CONTRACT 33%
The time provided for completion of this contract is increased by no calendar days. This document shall become an amendment to the
contract and all provisions of the contract will apply.
Recommended By: �` �` «,�zeO&
QPro Date
Approved By: T 3• Z
P 7r711c_etf' D ate
Accepted By: Z
s&§ei*' Da e
1 75 E. Main St.
Medford OR. 97501
ENGINEERING Tel:541488-5347
20 E.Mi.Street Fax:541488-6006
Ashland Oregon 97520 TTY: 800.735-2900 ,=
w .ashl d.or.us
CAE)m mints end Settings\dianne.SSSARCmTECTSUu 1 Settings\Temporary Intemet Files\Cmtent.Outlwk\T6SAG49N\Change Orda 10.20#3.xlsx
,I
OWNER ❑
CHANGE IN SERVICE MANAGER ❑
Between Owner and Architect ARCHITECT ❑
PROJECT: Ashland Police Relocation CHANGE IN SERVICE NO: 02
20 E.Main Street DATE: 4/4/2012
I Ashland, OR 97520
TO PROJECT MANAGER:
Scott Fleury/Terry Holderness ARCHITECTS PROJECT NO: 354
20 E.Main Street AGREEMENT DATE: 6/08/11
Ashland,OR 97520 AGREEMENT FOR: The Grove Police Relocation
The Agreement Is amended as follows: Code DD-13
1. Cost Estimating Services provided by Architectural Cost Consultants ......$8,271.00
2. Landscape Architectural Design provided by Kerry Kencaim $3,893.00
3. Structural additional to detail wood floor(per Geotech information) $2,500.00
TOTAL INCREASE.............$14,664.00
Not valid until signed by the Owner and Architect.
The original Agreement Amount was...................................................................................................$26.210.00
Net change by previously authorized Change In Service....................................................................$10,200.00
The Agreement Amount prior to this Change In Service was..............................................................$36,410.00
The Agreement Amount Wlil be Increased by this Change in Service in the amount of.......................$14,664.00
The new Agreement Amount including this Change in Service Will be................................................$51,074.00
The Agreement Time Will be(iBereaseA)(unchanged)by.........................................................(0)days.
The date of Project Completion as of the date of this Change in Service therefore is unchanged.
ARCHITECT: PROJECT MANAGER OWNER:
Straus&Seibert Architects,LLP Scott Fleury City of Ashland
Address: Address: Address:
1175 E.M uite 2E 20 E.Main Street 20 E.Main Street
Medford, 97504 Ashland,OR 97520 Ashland,OR 97520
By By. By.
Dale: Date: Date:
CHANGE IN SERVICE
CODE(Phase of Work-Change In Service)(XX-X)
Phases of Work
PO-Pre Design 7. Changes In the Initial 1.ft..SUM
SD-Schematic Design e. Services provided beyond the limits of.
DD—Design Development a Up to one(1)review of each Shop Drawing,Product Data
CD—Construction Documents Item,sample and similar submittal of the Contractor.
B -Bidding b.Up to one(1)visit per week to the site by the Architect over
CA—Construction Admtrtlstration the duration of the Project during ccrrswction.
CO—Closeout Phase/Commissioning c.Up to one(1)Inspection for any portion of the Work to
Chance In Service determine whether such potion of the Work Is substantiagy
1. Changes In Instructions or approvals given by the Owner that necessitate complete In accordance with the requirements of the
revisions of Service. Contract Documents.
2. Enactment or revisions of codes,laws or regulations or official d.Up to one(1)Inspection for any portion of the Wok
InWpetatlons which necessitate changes to previously prepared to determine ftrW completion.
Instruments of Service. g.Change Orders and Construction Change Directives requiring evaluation
3. Decisions of the Owner not rendered In a timely manner. of proposals,Including tie preparation a revision of Instruments of Service.
4. Significant change In the Project Including,but not gorged to,size.quality. 10.Evaluation of substitutions proposed by the comets consultants a
compleAty,Owner's schedule or budget or procurement meUW. contractors and maldng subsequent revisions to Instruments of Service
5. Fatiure of performance on Uhe part of ft Owner a the Owner's resulting there from.
consultants or contractors. 11.Preparation of design and documentation for altemats bid a proposal
a Preparation for and attendance at a public hearing,a dispute resolution requests proposed by the Owner.
proceeding a a legal proceeding except where tie Architect is party&&raw. 12 Contract Administration Services provided 60 days after the date of
Substantial Completion of the Work.
13.other Change In Service Items.
JA0354 Ashland Police Dept.The GrovelAdmin\CHANGE IN SERVICE.02.docx
ASHLAND POLICE FEE BUDGET 4/4/2012
BASIC SERVICES
Phase Pre-Design DD CD B Sub/Total CA TOTAL
Original CO#1 Sub/Total CO#2 No Contract
Budget 26,210 10,200 L - 0 20,959 46,851 6,551 , . -_74;361 0'3074_09, 141,220
S&S 10,000 1,000 11,000 16,767 30,457 _ 3,656 50,880 Estimate Estimate
S&S Ret 484 484
DLR 15,000 4,200 19,200
DLR Remb 726 726
MAI 5,000 5,000 4,192 16,396 2,893 23,4811 1
MAI Remb 600 600
S 1,383 5,410 759 7,552
M 1,719 6,723 940 9,382
E 1,090 4,263 596 5,949
OTHER CONSULTANTS(Fromoridnal Proposal,notincurrantcomnct)
Civil 2 596
Comm 6.499
Cost Est 5,191 4663 2608 1000 8,271
Interiors 6-084
Landscape 3,893 1,098 2,453 342 3,893
Security 31543
(Strikethroughs not required) :12;169 -
SCOPE CHANGE
Structural additional to detail wood floor(per6eotec Information) 2;500
PROJECT FEE TOTAL TO DATE '%36410 ,:,89?025 30,449 i55T884
Estimate Estimate
SEISMIC DESIGN(Fee's'part of slAB,605eisrnic Alloaiarioe;"rim of 4zoldo for mnstniiYlon) ..::
MAFFe�"e 117
10;000' ' 10,000
Items In red submitted for addition to existing contract II
The total fee Ls 12.6%of TOTAL PROBABLE CONSTRUCTION Budget(not Including se-14
0