Loading...
HomeMy WebLinkAbout1996-159 Co-op Agrmt - ODOT July 25, 1996 Misc. Contracts & Agreements No. 14638 AMENDMENT NO.1 COOPERATIVE IMPROVEMENT AGREEMENT The State of Oregon, acting by and through its Department of Transportation, hereinafter referred to as "ODOT", the CITY OF ASHLAND, by and through its Elected Officials, hereinafter referred to as "CITY"; and STATE OF OREGON, acting by and through its State Board of Higher Education on behalf of Southern Oregon College, hereinafter referred to as "COLLEGE" entered into an agreement on June 13, 1996. Said agreement covers the realignment oflndiana and Wightman Streets intersection with Siskiyou Boulevard. It has now been determined by ODOT, CITY, and COLLEGE that the agreement referenced above, shall be amended by this agreement and replaced in its entirety. WITNESSETH RECITALS I. Rogue Valley Highway (Siskiyou Boulevard) is a part of the state highway system under the jurisdiction and control of the Oregon Transportation Commission, and Indiana and Wightman Streets are a part of the City Street System, under the jurisdiction and control of City. 2. By authority granted in ORS 366.770 and 366.775, ODOT may enter into cooperative agreements with the counties and cities for the performance of work on certain types of improvement projects with the allocation of costs on terms and conditions mutually agreeable to the contracting parties. 3. By the authority granted in ORS 190.110 and 283.110, state agencies may enter into agreements with units of local government or other state agencies for the performance of any or all functions and activities that a party to the agreement, its officers, or agents have the authority to perform. 4. College intends to develop the Center for the Visual Arts complex that is to be located astride Indiana Street on the south side of Rogue Valley Highway (Siskiyou Boulevard). This development, as well as ongoing concerns about pedestrian safety for students crossing Siskiyou Boulevard in this vicinity, will require a realignment ofIndiana Street Agreement No. 14638 Ashland/Southern Oregon State College with Wightman Street at their intersection with Siskiyou Boulevard. The location of the project is approximately as shown on the sketch map attached hereto, marked Exhibit A, and by this reference made a part hereof. 5. "Siskiyou Construction Costs" are defined to be the actual cost of construction of the work within Rogue Valley Highway (Siskiyou Boulevard) right~of~way such as signal relocation or construction, island removal or replacement, pavement, sidewalk and curb costs for engineering, surveying, inspection, and construction. 6. Preliminary engineering, construction engineering, and construction costs of the project shall be financed with $50,000 of ODOT funds for the "Siskiyou Construction Costs" of the project and $50,000 of College funds. City shall be responsible for any and all costs of the project which exceed ODOT and College combined deposit of$100,000. 7. By the authority granted in ORS 810.210, ODOT is authorized to determine the character or type of traffic control devices to be used, and to place or erect them upon State of Oregon highways at places where ODOT deems necessary for the safe and expeditious control of traffic. No traffic control signals or devices shall be erected or maintained upon any State of Oregon highway by any authority other than ODOT, except with its written authorization. Traffic signal work on the project will conform to the current ODOT standards and specifications. ODOT OBLIGATIONS 1. 0 DOT shall review City plans and provide actual design of the required directional and traffic control devices and actual design of changes necessary within the right-of-way of the Rogue Valley Highway (Siskiyou Boulevard). ODOT shall also provide, to the full extent possible, the services ofODOT's Traffic Signal Team to assist the City's Electric Department in the actual relocation and reconstruction of the existing traffic signal facilities at the WightmanlRogue Valley Highway (Siskiyou Boulevard) intersection. 2. ODOT shall, upon satisfactory signal turn-on and at its own expense, perform all required traffic signal maintenance and retain complete jurisdiction and control of the timing established for operation of the traffic signal. 3. ODOT shall be responsible for the conduit and trenching portion of the traffic signal for this project, not to exceed ODors initial deposit of$50,000. 4. ODOT shall, upon receipt of a fully executed copy of this agreement, forward to City an advance deposit in the amount of $50,000 to pay for its share of the design and construction of the "Siskiyou Construction Costs" of the' project. Any portion of 2 Agreement No. 14638 Ashland/Southern Oregon State College ODOT's advance deposit of $50,000 which is in excess of the "Siskiyou Construction Costs" will be refunded or released to ODOT. 5. ODOT grants authority to City to enter upon ODOT right-of-way for the construction of this project. CITY OBLIGATIONS I. City shall conduct, by city staff or consultant, the necessary field surveys, identify and obtain all required permits, perform all preliminary engineering and design work required to produce final plans, specifications, and estimates, advertise for bid proposals, award all contracts and furnish all construction engineering, material testing, technical inspection and project manager services for realigning Indiana Street to meet Wightman Street and making necessary improvements to Rogue Valley Highway (Siskiyou Boulevard) such as signal location, island removal or replacement, and sidewalk and curb modifications. City shall provide to ODOT permanent mylar "as constructed plans". 2. City shall maintain the asphaltic concrete pavement surrounding the vehicle detector loops installed in City street in such a manner as to provide adequate protection for said detector loops, and shall adequately maintain the pavement markings and signing installed on City streets in accordance with the plans and specifications. 3. City shall compile accurate cost accounting records. ODOT and College may request a statement of costs to date at any time by submitting a written request. When the actual total costs of the project have been computed, City shall furnish ODOT and College with an itemized statement of said final costs. 4. If College and ODOT approve City's plans, specifications, and estimates required for the project, City shall transfer to College the City's entire interest in all real property currently occupied by Indiana Street that will not be occupied by Indiana Street after the realignment. 5. City hereby grants ODOT the right to enter onto and occupy City street right-of-way for the performance of construction and necessary maintenance of the traffic signal equipment, including vehicle detector loops. 6. City shall, upon request by ODOT, relocate and reconstruct, or cause to be relocated or reconstructed, all privately or publicly-owned utility conduits, lines, poles, mains, pipes, and all other such facilities of every kind and nature, where such utilities or facilities are located within the right-of-way of any presently existing City street where such relocation or reconstruction is necessary in order to conform the utilities or facilities to 3 Agreement No. 14638 Ashland/Southern Oregon State College the plans for the project. City may request ODOT to arrange for such relocation, acting on behalf of City and at no additional cost to ODOT. 7. City, by execution of this agreement, consents, as required by ORS 373.030(2) to any and all changes of grade within the city limits, if any there be, in connection with or arising out ofthe project covered by this agreement. 8. City shall, upon completion of the project and at its own expense, provide all power required for operation of the traffic signal. 9. City shall enter into and execute this agreement during a duly authorized session of its City Council. 10. City shall set up an expense account for ODOT forces to charge all related expenses for and up to the maximum amount of $50,000. City shall be responsible for any expenses above ODOT's deposit of$50,000 and College's deposit of $50,000. II. Within 30 days following completion of the project, City shall provide College with an itemized statement of the actual total project costs other than "Siskiyou Construction Costs." If such project costs are less than $50,000, City shall pay such difference to College within 30 days. Any portion of College's advance deposit of $50,000 which is in excess of the project costs will be refunded or released to College within 30 days of receipt ofthe itemized statement of the actual total project costs. 12. City, or its consultant, shall obtain and keep in effect during the term of this agreement, Comprehensive or Commercial General Liability Insurance covering bodily injury and property damage. This insurance shall include personal injury coverage, contractual liability coverage for the indemnity provided under this agreement, and products/completed operations liability. Combined single limit per occurrence shall not be less than $1,000,000, or the equivalent. Each annual aggregate limit shall not be less than $1,000,000, when applicable. The liability coverages required for performance of the agreement shall include the State of Oregon, Department of Transportation and their divisions, officers and employees, as Additional Insureds but only with respect to City's, or its consultants', activities to be performed under this agreement. Before this agreement is executed, City, or its consultant, shall furnish to ODaT a Certificate of Insurance for the limits set out above, which is to be in force and applicable to the project. 4 Agreement No. 14638 Ashland/Southern Oregon State College The insurance coverage shall not be amended, altered, modified, or canceled insofar as the coverage contemplated herein is concerned without at least thirty (30) days prior written notice to ODOT. COLLEGE OBLIGATIONS I. If College and ODOT approve City's plans, specifications, and estimates required for the project, College shall transfer to City the College's entire interest in all real property to be occupied by the realigned Indiana Street. 2. College shall, upon receipt of a fully executed copy of this agreement, forward to City an advance deposit in the amount of $50,000 to pay for its share of the design and construction of the project, other than the "Siskiyou Construction Costs". College shall not pay any amount of the "Siskiyou Construction Costs." GENERAL PROVISIONS 1. ODOT, City, and College agree and understand that a mutual review of the plans, specifications, and estimates will be conducted prior to advertisement for construction bid proposals. City shall not advertise for construction bid proposals unless College and ODOT have approved such plans, specifications, and estimates. 2. To the extent permitted by applicable law including Article XI, Sec. 7, of the Oregon Constitution and the Oregon Tort Claims Act, City, ODOT, and College shall each be solely responsible for any loss or injury caused to third parties arising from City's ODOT's and College's own acts or omissions under this agreement and City, ODOT, or College shall defend, hold harmless and indemnifY the other parties to this agreement with respect to any claim, litigation, or liability arising from City's, ODOT's, or College's own acts or omissions under this agreement. 3. The Contractor, its subcontractors, if any, and all employers working under this agreement are subject employers under the Oregon Workers' Compensation Law and shall comply with ORS 656.017, which requires them to provide workers' compensation coverage for all their subject workers. 5 Agreement No. 14638 Ashland/Southern Oregon State College IT WIlNESS WHEREOF, the parties hereto have set their hands and affixed their seals as of the day and year hereinafter written. The Oregon Transportation Commission on March 7, 1996 adopted Delegation Order 2, which grants authority to branch and region managers to approve and execute agreements for work in the current Statewide Transportation Improvement Program or approved workplan budget. APPROVAL RECOMMENDED By 9/4(~ APPROVED AS TO LEGAL SUFFIC~CY / / By vi 1: ~~ Asst. Attorney General Date 1/ ~/?t STATE OF OREGON, by and through the Board of Higher Education on behalf of Southern Oregon State College By ~~^t-"A--\ , Dean of AdministrationlFinance Date '1po l1 ~ Region Manager Date 8/d-B }rrb I THE CITY OF ASHLAND, by and through its Elected Officials ~~~ 5/;'I/7v Mayor Date By /J~/L-' tiA-t( (~~ yji/t? City Recorder Date REVIEWED AS TO CONTENT By rLo;c;/r ~/r,~;li;WO~~Da11</q" REVIEWED AS TO FORM By ftVr6 City Attorney 3'/6/7(0 Date 6 r-----------=1 SHll3" O'i.. 00<; r-------~-:i _d..HJ Oo;l 0 OSl 1--------1 009l 009 r-,-,----,----, ,___,_~CL r~ c 006' 13]j OO~l V IJ8JHX3 l,.~" I '1':' NI<1\.l j, Jd!' ]W)'; 1l'H 'JU .. J\1I0.. lttflfil. . l(l()HJ'> .. JJ1,JU J'>Ud , Jln;Jtj ,]lrl"1l'1I1IlN-' : , \ ~.j [:7851 .Jeqw88eO NOll 'Val SIINW-JO'V ^ VMH~IH l'V(j Jcn J NOll V HJOdSIN'Val .::JO It\3V'HdVdO'ST NOIH~3dOOJ NI T:kOHl'tllN Jj ~j', \,m: ", ( \ .... '1 "-' ...1)lj'.......dJ! ::""l''''8 J'"'81""'.<.\ . ;!'lOtJ '~:Ij}g",r_N )1~lSU)INI ~ ON3~3l NOISI^IO A 'V MH:)IH 31 'V 1 S NO:)3tJO 3H1 A8 03~Vd3~d ( ) , ------- I I I I I I I I I II v .1 ",,)11 ., I I II~ i I ~: '.,J '~, / ' ... iv110l ~On""1---;!'5 ~v/~ " ~ 1:-<~1<\\ , / 'J I,,: ("----_if-/ \ 'L"----- / - ,I~;'-;-'J:~>T ~ 1 ~ ;.l C~~?~~JX:~ I ~ :' ,~ ,"'I ;c.=:,.;;:C- 'ill ';. ~ !~7i ~ I' ~}I"lN..~'l~ 1 ((-lit, _._~ j~ __ I / ~,- Il ~, I~'-'-"'HOJ t' 1 (IT""~" I: I I I Ti"M -3 t't:j 'S D~ '1 O~G'tl'1 NOl1'VlndOd NO~3~O ',INnOJ NOS~JVr .."1" ~ A.lINI~I^ ONV ON't'HS't ~, I ~ "':', " ~..... ~" .),"JII 1 S I I '" '~jJ::~ I . ' I 1 'JI~ 'tJ. i"'--. I ~:..... I '-Y1:J';:--, 0" i!1 'I . i~ J =< ''''~H '~Klr.J DEPARTMENT OF PUBLIC WORKS ADMINISTRATION: (541) 488-5587 ENGINEERING: (541) 488-5347 C I TV HAL L CITY OF ASHLAND 20 E. MAIN STREET ASHLAND, OREGON 97520-1814 FAX (541) 488-6006 liOTIt;E_ OF.. TR;tNSM{.1T.AL TO: Barbara Christensen City Recorder DATE PROJECT JOB NO. SUBJECT 09/23/96 Indiana/Wightman Realignment 96-15 Amendment No.1 to Intergovernmental Agreement THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Original Amendment No.1, Cooperative Improvement Agreement (No. 14638). ENCLOSED X UNDER SEPARATE COVER REMARKS: This is an amendment to the original intergovernmental agreement approved on June 13, 1996 and transmitted to you for filing on June 19, 1996. COPIES TO: Susan Wilson Broadus Pete Lovrovich Greg Scoles Department of Public wor,~ Engineering Division By: James H. Olson Title: Assistant City Engineer (c: \eogineer\nottcans. fnn