HomeMy WebLinkAbout2012-290 Contract - Cut N Break Construction
C I T Y OF CITY OF ASHLAND
-ASHLAND
!M PUBLIC. IMPROVEMENT CONTRACT
N. MAIN SIDEWALK REPAIR PROJECT
Project No. 2012-02
This Contract is between the CITY OF A F)LAND, a municipal corporation of the State of
Oregon (hereinafter "City") and L$li W M . (Hereinafter "Contractor"). The City's
Project Manager for this Contract is Morgan Wayman,-CiU of Ashland Public Works
Department.
WHEREAS, City caused to be prepared a certain bound Project Manual or Bid Package
(including but not limited to Invitation to Bid, Bid Schedule, Bid forms, Bid, Performance and
Payment Bonds, as applicable, Public Improvement Contract, Contract Standard Terns and
Conditions, Conditions, General Provisions, Technical Specifications, Drawings, and Addenda
No.411A through No.N4, more particularly described in Standard Condition 5, (hereinafter
referred to as "Contract Documents") for its project entitled i `N. Main Sidewalk Repair " and
WHEREAS, Contractor did on the 'rk 7✓ 2012, file with City a bid to furnish
equipment, labor, material, and appurtenances for construction of said project as set forth in the
Contract Documents and agreed to accept as payment therefore the sums fully stated and set forth
in the bid; and
WHEREAS, the Contract Documents and bid fully and accurately set forth and describe the terms
and conditions upon which the Contractor proposes to furnish said equipment, labor, material and
appurtenances and perform said work, together with the manner and time of furnishing same; and
NOW THEREFORE, for good and valuable consideration the parties mutually covenant and
agree as follows:
1. Recitals.
This recitals set forth above are true and correct and are incorporated herein by this reference.
2. Effective Date and Duration
This contract is effective on [ID 2d12 or on the date at which every party has signed this
contract, whichever is later. The work under this contract shall, unless otherwise terminated or
extended, be completed on or before X1215 - or before calendar days following
Contractor's receipt of the Notice to Proceed, whichever is earlier.
3. Statement of Work
The work under this contract is for The N. Main Sidewalk Repair Project as is more fully
described in the Contract Documents, incorporated herein and made a part. hereof by this
reference. The statement of work, including the delivery schedule for the work, is contained in is
G:Ipub-wrks1eng112-02 N Main St Sidewalk RepaiAA_AdminlConstruction AdminlCons Pre ContmctlContract formslConstruction Contract 9-7-
2012.doc
contained in the Contract Documents. Contractor acknowledges receipt of all Contract Documents
in existence at the date the Contract is signed and further acknowledges Contractor has read and
fully understands the Contract Documents, and understands that in signing this Agreement
contractor waives all rights to plead misunderstandings regarding the same.
Contractor shall, at its own risk and expense, perform the work described in the Contract
Documents and famish all permits, labor, tools, machinery, materials, transportation, equipment
and services of all kinds required for, necessary for, or reasonable incidental to, performance of
the work, that is, the construction of this N. Main Sidewalk Repair Project for the City of
Ashland, Oregon, as shown in the Contract Documents. Contractor shall secure all Municipal,
County, State, or Federal Permits or licenses including payment of permit fees, license fees and
royalties necessary or incident to performance of the work on this contract. The risk of loss for
such work shall not shift to the City until written acceptance of the work by the City.
4. Consideration
a. City agrees to pay Contractor, at the times and in the manner provided in the Contract
Documents, a sum of ' Orv0 ;'DD for accomplishing the work required by this contract,
including allowable expenses. This sum cannot be modified except by Change Order approved
in writing by City. Any progress payments to Contractor shall be made only in accordance
with the schedule and requirements in Section 21, Standard Terms and Conditions.
b. City certifies that sufficient funds have been appropriated to make payments required by this
contract during.the current fiscal year. Contractor understands and agrees that City's payment
of amounts under this contract attributable to work performed after the last day of the current
fiscal year is contingent on City appropriations, or other expenditure authority sufficient to
allow City in the exercise of its reasonable administrative discretion, to continue to make
payments under this contract. In the event City has insufficient appropriations, limitations or
other expenditure authority, City may terminate this contract without penalty or liability to
City, effective upon the delivery of written notice to Contractor, with no further liability to
Contractor.
CONTRACTOR DATA, CERTIFICATION, AND SIGNATURE
Business Name (please print: Cu + W -6i2c--4 IL ctw-.-1. Ti ,
Contact Name: ;ln1~4&&j Phone:50 771-1 yP~ax:.1-5~ 1 17.E I 13
Address: P, C, 3 a,( 1 Ll S5 Al E7~r~zi~ ~&iz c')S U
Do Not Write Federal and State Tax ID Numbers on this Agreement: One copy of W-9 is to be
submitted with the signed contract to be kept on file in the City of Ashland Finance Department.
Ashland Business License # 131- 00 77 3 O Construction Contractors Board # 740 L
Citizenship: Nonresident alien Yes X No
Business Designation (check one): Individual Sole Proprietorship
Partnership __y _ Corporation GovernmentfNonprofit
The above information must be provided prior to contract approval. Payment information will be
reported to the Internal Revenue Service (IRS) under the name and taxpayer I.D. number provided
above. (See IRS 1099 for additional instructions regarding taxpayer ID numbers.) Information
not matching IRS records could subject you to 31 percent backup withholding.
G:Ipub-wrksleng112-02 N Main St Sidewalk RepairI4 AdminlConstruction AdminlCons Pre ContractlContract formslConstruction Contract 9-7-
2012.doc
I, the undersigned, understand that the Standard Terms and Conditions For Public Improvement
Contracts (Exhibit A) together with Exhibits B through J together with all other Contract
Documents as described in Standard Terms and Conditions Section 5 below, and the separately
bound Oregon 2008 Standard Specifications for Construction, as amended by the City of
Ashland's most recent Addenda to the 2008 Standard Specifications are an integral part of this
contract and agree to perform the work described in the Contract Documents, including Exhibit
A, in accordance with the terms and conditions of this contract. I further understand the City is
prohibited from entering into a contract when the contractor has neglected or refused to file any
return, pay any tax, or properly contest a tax, pursuant to ORS 305.385; I hereby certify, under
penalty of perjury and false swearing, that I/my business am/is not in violation of any Oregon tax
laws; I further certify that the certification and representations in Standard Term and Condition #
16 [CCB Registration Requirements] are true and correct, and further I certify that I am an
independent contractor as defined in ORS 670.600.
Signed bYZ aD.Gt~J
0//C,// Z
Sign e/Title Date
Printed Name:,~10//lt/ -4264)-l"'I
NOTICE TO CONTRACTOR: This contract does not bind the City of Ashland unless and until it
has been executed by the Public Contracting Officer or designee as well as City Finance and
Legal Department representatives.
CITY OF ASHLAND SIGNATURE
Approved:
1~~ o~z sI z1i2
City of Ashland Date
- Authorized by Ordinance 3013 and Delegation Order dated June 22. 2010
Coding:
Reviewed
1/1 Ila
City Attorn (approved as to legal form) Date
I
G:Ipu&wrks1eng112-02 N Main St Sidewalk RepairlA_AdminlConstruction AdminlCons Pre ContractlContract formslConstruction Contract 9-7-
2012.doc
CERTIFICATIONS OF REPRESENTATION
Contractor, under penalty of perjury, certifies that:
(a) The number shown on this form is its correct taxpayer ID (or is waiting for the number to be
issued to it; and
(b) Contractor is not subject to backup withholding because (i) it is exempt from backup
withholding or (ii) it has not been notified by the Internal Revenue Service (IRS) that it is subject
to backup withholding as a result of a failure to report all interest or dividends, or (iii) the IRS has
notified it that it is no longer subject to backup withholding. Couhaclor further represents and
warrants to City that (a) it has the power and authority to enter into and perform the work, (b) the
Contract, when executed and delivered, shall be a valid and binding obligation of Contractor
enforceable in accordance with its terms, and
(c) The work under the Contract shall be perfumed in accordance with the highest professional
standards, and
(d) Contractor is qualified, professionally competent and duly licensed to perform the work.
Contractor also certifies under penalty of perjury that its business is not in violation of any
Oregon tax laws, and it is a corporation authorized to act oil behalf of the entity designated above
and authorized to do business in Oregon or is an independent contractor as defined in the contract
documents, and has checked four or more of the following criteria:
(1) I carry out the labor or services at a location separate from my residence or is in a
specific potion of my residence, set aside as the location of the business.
(2) Commercial advertising or business cards or a trade association membership are
purchased for the business.
(3) Telephone listing is used for the business separate fi orm the personal residence listing.
(4) Labor or services are performed only pursuant to written contracts.
X (5) Labor or services are petformued for two or more different persons within a period of
one year.
(6) I assume fnancial ponsibilily for defective workmanship or for service not
provided as evide crSd by t ill' ofperformancebonds, warranties, errors and omission
insur c or 11 11 y in ice re • g to the labor or services to be provided.
Ce rector Si nature Date G l)
G:ton6-wAslanaF12-02,Y Mnln SI Sldervalk Repn4tA_ArfrnlrAG01vraG10n AdrnfnlCons Pie ConfracrjcvMjr cf fwMSIV01 IM11011 conlrocl 9-7.
2012rfoc
Clly of Ashland
North Main Sidewalk Repair
131D SCHEDULE
No. Item Unit E Ouantll Unit Price Total Price
10 Mobilization Lump Sum Ail kLuupp m Sum $ v O
20 Temporary Prulection and Direction of Traffic Lum Sum All m S unt $ C
U
30 Tem ora 5 ns Lump Sum All Lump Sum $ L (D
40 Muggers Lump Sum AA Lump Sum $
50 Pollution Control Plan Lump Sum AA Lump Sum $
60 Work Containment Plan and System nA Lump Sum $
70 Fioabng Absorhent Boom All Lump Sum $ 2..5( ~
00 Bridge Demolition Work All Lump Sum $ i U
00 Reinforcement Lump All Lump Sum $ vOC~
AMOOLump
100 General SlNCtural Concrete. ClasAll Lump Sum $ f:~ G'
110 Re air and Float Finish on EAsting Arch Bdd a Fact Lump Sum AA Lump Sum $ L t/
i
120 Float Finish on New Concrete Cover Wall Lump Sum AA Lump Sum
C
130 4 Inch Ch1U Well Lump Sum All Lump Sum $
140 Float Finish on New CIAU Wall Lump Sum All Lump Sum $
150 Coat New CMU Wail and Adjacent Concrete Surfa Lump Sum All Lum Sum $ _5 O 0
ov
160 Structural Steel Posts and Beams Lump Sum All Lum Sum $ .
170 Re lace Timber ftall In Kind Lump Sum AA Lum Sum $
TOTAL BID' $
I
EXHIBIT A
CITY OF ASHLAND STANDARD TERMS AND CONDITIONS
FOR PUBLIC IMPROVEMENT CONTRACTS
1. Contractor is Independent Contractor
a. Contractor shall perform the work required by this contract as an independent contractor. Although the City
reserves the right (i) to specify the desired results; (ii) to determine (and modify) the delivery schedule for the work
to be performed; and (iii) to evaluate the quality of the completed performance, the City cannot and will not control
the means or manner of the Contractor's performance. The Contractor is responsible for determining the appropriate
means and manner of performing the work.
b. The Contractor represents and warrants that Contractor (i) is not currently an employee of the federal
government or the State of Oregon, and (ii) meets the specific independent contractor standards of ORS 670.600, as
certified on the Independent Contractor Certification Statement attached as Exhibit D.
C. Contractor will be responsible for any federal or state taxes applicable to any compensation or payment paid
to Contractor under this contract.
d. Contractor is not eligible for any federal Social Security, unemployment insurance, state Public Employees'
Retirement System, or workers' compensation benefits from compensation or payments to Contractor under this
contract.
2. Subcontracts and Assignment .
Contractor shall not subcontract any of the work required by this contract, or assign, sell, dispose of, or transfer any
of its interest in this contract, nor delegate duties under the contract, either in whole or in part, without the prior
written consent of the City. Such consent if provided shall not relieve the Contractor of any of the obligations under
the contract. Any assignee or transferee shall be considered the agent of the contractor and be bound to abide by all
provisions of the contract. If the City consents in writing to an assignment, sale, disposal or transfer of the
Contractor's rights or delegation of Contractor's duties, the Contractor and its Surety, if any, shall remain liable to the
City for complete performance of the Contract as if no such assignment, sale, disposal, transfer or delegation had
occurred unless the City otherwise agrees in writing. [OAR 137-049-0200(2)]
Use of Subcontractors, material suppliers or equipment suppliers shall in no way release Contractor from any
obligations of contract with City. Contractor will provide in all subcontract agreements that the Subcontractor,
material supplier and equipment supplier will be bound by the terms and conditions of this Contract to the extent that
they relate to the Subcontractor's work, material or equipment. All Subcontracts are assignable to the City at City's
option, in the event this agreement is terminated for default of Contractor.
Contractor covenants and agrees to bind any and all subcontractors for performance of work under this Contract in
the same manner Contractor is bound to City. Contractor further agrees that if subcontractors are employed in the
performance of this contract, the Contractor and its subcontractors are subject to the requirements and sanction of
ORS Chapter 656, Workers' Compensation.
3. No Third Party Beneficiaries -
City and Contractor are the only parties to this contract and are the only parties entitled to enforce its terms. Nothing
in this contract gives or provides any benefit or right, whether directly, indirectly, or otherwise, to third persons
unless such third persons are individually identified by name herein and expressly described as intended beneficiaries
of the terms of this contract.
4. Successors in Interest
GApub-wrksleng112-02 N Main St Sidewalk RepairWAdminlConstruction AdminlCons Pre ContmcilContract formslConstmction Contract 9-7-
2012.doc
The provisions of this contract shall be binding upon and shall inure to the benefit of the parties hereto, and their
respective successors and approved assigns, if any.
5. Contract Documents
The Contract Documents, which comprise the entire Contract between the City and Contractor, include all sections or
parts of the bid package however denominated, including all documents and plans attached or referenced therein, the
Notice to Contractors - Invitation to Bid, Offer, First-Tier Subcontractors Disclosure Form, Surety Bond, Public
Improvement Contract, Contract Standard Terms and onditions and Exhibits thereto, Performance Bond, Payment
Bond, Special Provisions, Plans entitled "L1.(R.SIr Construction Drawings, Standard Drawings, and
Contract Addendums, all attached hereto, and incorporated herein by this reference, together with the Prevailing
Wage /BOLD if applicable AND any other separately bound reference, Oregon 2008 Standard Specifications for
Construction, and City of Ashland Addenda, incorporated herein by this reference. All exhibits, schedules and lists
attached to the Contract Documents, or delivered pursuant to the Contract Documents, shall be deemed a part of the
Contract Documents and incorporated herein, where applicable, as if fully set forth herein.
6. Contractor's Representations
By executing this contract, the Contractor hereby certifies that the representations made by the Contractor in the
Contract Documents, including specifically the Offer, are true and correct and are incorporated herein by this
reference. Contractor further certifies that Contractor has given the City written notice of conflicts, errors,
ambiguities, or discrepancies that it has discovered in the Contract Documents, and the written resolution thereof by
the City is acceptable to the Contractor, and the Contract Documents are generally sufficient to indicate and convey
understanding of terms and conditions for performing and furnishing the project work.
7. Drug Testing [ORS 279C.505(2)]
a. Contractor shall certify to the City that it has a drug-testing program in place for all its employees that
includes, at a minimum, the following:
i. A written employee drug-testing policy,
ii. Required drug testing for all new Subject Employees or alternatively, required testing of
all Subject Employees every 12 months on a random selection basis, and
iii. Required testing of a Subject Employee when the Contractor has reasonable cause to
believe the Subject Employee is under the influence of drugs.
b. A drug-testing program that meets the above requirements will be deemed a "Qualifying Employee Drug-
testing Program." For the purposes of this section, an employee is a "Subject Employee" only if that employee will be
working on the Public Improvement project job site.
C. By executing and returning this contract the Contractor certifies, represents and warrants to the City that a
Qualifying Employee Drug-testing Program is in place at the time of execution, will continue in full force and effect
for the duration of this contract, and that Contractor will comply with the provisions of subsection d below. Further,
the City's performance obligation (which includes, without limitation, the City's obligation to make payment) is
contingent on Contractors compliance with this representation and warranty.
it. Contractor will require each subcontractor providing labor for the project, to:
i. Demonstrate to the Contractor that it has a Qualifying Employee Drug-testing Program for the
subcontractors Subject Employees, and represent and warrant to the Contractor that the Qualifying
Employee Drug-testing Program is in place at the time of subcontract execution and will continue
in full force and effect for the duration of the subcontract; or
ii. Require that the subcontractor's Subject Employees participate in the Contractors Qualifying
Employee Drug-testing Program for the duration of the subcontract.
G:Ipub-wrks1eng112-02 N Main St Sidewalk RepaiMAdminlConstruction AdminlCons Pre ContractlContract /ormslConstruciion Contract 9-7-
2012.doc
8. Notice to Proceed
Written Notice to Proceed will be given by the City after the contract has been executed and the performance bond,
payment bond, and all required insurance documents approved. Notice to proceed shall not be unreasonably delayed
and shall generally occur within thirty (30) days of the contract date. Reasonable delay may be occasioned by the
need to obtain necessary permits or easements or utility relocation. The Contractor shall commence the project work
within fifteen (15) days of the date of the written Notice to Proceed. Contractor is not to commence work under the
Contract prior to such written notice. -
9. Suspension of the Work
The City, and its authorized representatives, may suspend portions or all of the project work due to causes including,
but not limited to:
a. Failure of the Contractor to correct unsafe conditions;
b. Failure of the Contractor to carry out any provision of the Contract;
C. Failure of the Contractor to cant' out orders;
d. Conditions, in the opinion of the City, which are unsuitable for performing the project work;
C. Allowance of time required to investigate differing site conditions;
f Any reason considered to be in the public interest.
The contract time will not be extended, nor will the Contractor be entitled to any additional compensation if the work
is suspended pursuant to subsections (a), (b) or (c). If the project work is suspended pursuant to subsection (f), the
Contractor is entitled to a reasonable extension of the contract time and reasonable compensation for all verified costs
resulting from the suspension plus a reasonable allowance for overhead with respect to such costs. Contractor shall
not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from
such termination. The foregoing provision concerning compensation in the event of a suspension of Work of this
contract shall not apply if such suspension occurs as a result of the Contractor's violation of any Federal, State, or
Local statutes, ordinances, rules or regulations, or as a result of any violation by the Contractor of the terms of this
contract, including a determination by the City that the Contractor has not progressed satisfactorily with the Work in
accordance with specifications.
10. Early Termination
a. The City and the Contractor, by mutual written agreement, may terminate this Contract at any time.
b. The City, on 30 days written notice to -the Contractor, may terminate this Contract for any reason deemed
appropriate in its sole discretion.
C. The City may terminate this contract, in whole or in part, at any time for any reason considered by the City,
in the exercise of its sole discretion, to be in the public interest. The City will provide the Contractor, and the
Contractor's surety, seven (7) days prior written notice of a termination for public convenience.
d. Either the City or the Contractor may terminate this Contract in the event of a breach of the Contract by the
other. Prior to such termination, however, the party seeking the termination shall give to the other party written
notice of the breach and of the party's intent to terminate. If the Party has not entirely cured the breach within 15
days of the notice, then the party giving the notice may terminate the Contract at any time thereafter by giving a
written notice of termination.
U. Payment on Early Termination
G:ipub-wrks1eng112-02 N Main St Sidewalk RepairlA_AdminlConstruction AdminlCons Pre ContractlContract formslConstruction Contract 9-7-
2012.doc
a. If this contract is terminated under 10(a)(b) or (c), the City shall pay the Contractor for work performed in
accordance with the Contract prior to the termination date.
i
b. If this contract is terminated under 10(d), by the Contractor due to a breach by the City, then the City shall
pay the Contractor as provided in subsection (a) of this section.
C. If this contract is terminated under 10(d), by the City due to a breach by the Contractor, then the City shall
pay the Contractor as provided in subsection (a) of this section, subject to set off of excess costs, as provided for in
section 12, Remedies.
12. Remedies
In the event of termination under 10 (d), by the City due to a breach by the Contractor, then the City may complete
the work either itself, by agreement with another contractor, or by a combination thereof. In the event the cost of
completing the work exceeds the remaining unpaid balance of the total compensation provided under this contract,
then the Contractor shall pay to the City the amount of the reasonable excess. After notice of termination under
paragraph 10(c), the Contractor and the Contractor's surety shall provide the City with immediate and peaceful
possession of the Project site and premises, and materials located on and off the Project site and premises for which
the Contractor received progress payment. In no circumstances shall Contractor be entitled to lost profits due to
termination.
The remedies provided to the City under section 10 through 12 for a breach by the Contractor shall not be exclusive.
The City also shall be entitled to any other equitable and legal remedies that are available.
In the event of breach of this Contract by the City, then the Contractor's remedy shall be limited to termination of the
Contract and receipt of payment as provided in section I I (b).
13. Access to Records
Contractor shall maintain and the City and its authorized representatives shall have access to all books, documents,
papers and records of Contractor which relate to this contract for the purpose of making audit, examination, excerpts,
and transcripts for a period of three years after final payment. Copies of applicable records shall be made available
upon request. Payment for cost of copies is reimbursable by the City.
14. Ownership of Work
All work products of the Contractor that result from this contract, including but not limited to background data,
documentation and staff work that is preliminary to final reports, are the property of City. Draft documents and
preliminary work submitted to the City for review and comment shall not be considered as owned, used or retained by
the City until the final document is submitted.
The City shall own all proprietary rights, including but not limited to copyrights, trade secrets, patents and all other
intellectual or other property rights in and to such work products. Preexisting trade secrets of the Contractor shall be
noted as such and shall not be considered as a work product of this contract. All such work products shall be
considered "works made for hive" under the provisions of the United States Copyright Act and all other equivalent
laws.
Use of any work product of the Contractor by the City for any purpose other than the use intended by this contract is
at the risk of the City. Use of any work product by Contractor is prohibited without the written consent of the City.
All documents or other materials submitted to City by Contractor shall become the sole and exclusive property of
City. Such materials are subject to Oregon Public Records laws./
Is. Compliance with Applicable Law
Contractor certifies and shall comply and require all Subcontractors to comply with all federal, state, and local laws
and ordinances, including specifically City of Ashland and State of Oregon Public contracting laws and rules
applicable to the work under this contract, including without limitation ORS Chapter 279A-C, 279C.500 through
G:Ipub-wrkslengI12-02 N Main St Sidewalk Repair%A_AdminlConstrucGOn AdminlCons Pre ContmctlContract /ormslConstruction Contract 9-7-
2012.doc
279C.670, and specifically ORS 279A.120(3), 279C.515, 279C.520, 279C.530, 279C.830 and 279C.580 as set forth
on Exhibit B, attached hereto and made a part hereof by this reference In addition, the provisions of ORS
279C.360, 279C.365(4), and 279C.370 (Bid Documents and Disclosure); ORS 279A.010(p), 279A.120, 279C.375,
and 279C.380(4), (Award of Contract and Bond); ORS 279A.110 (Prohibition on Discrimination in Subcontracting);
ORS 279C.585 (Substitution first-tier Subcontractor); ORS 279C.650 to 279C.670 (Termination); ORS 279C.520,
279C.540, 279C.545 (Hours); ORS 279C.800 to 279C.870 (Oregon Prevailing Wage Law), if applicable; ORS
279C.550 to 279C.565 (Retainage); ORS 279C.4570 (Payments); and ORS 279C.600 to 279C.625 (Bonds) ORS
279A.125 (Recyclable Products) are all incorporated into this contract by this reference as though set forth in full.
Without limiting the foregoing, Contractor expressly agrees to comply with: (i) any requirements of the DAVIS
BACON ACT (40 U.S.C. 3142 and applicable Davis Bacon Related Acts; (ii) Title VI of the Civil Rights Act of
1964; (iii) Section V of the Rehabilitation Act of 1973; (iv) the Americans with Disabilities Act of 1990, (v) ORS
659A.142, (vi) all regulations and administrative rules established pursuant to those laws; and (vii) all other
applicable requirements of federal and state civil rights and rehabilitation statues, rules and regulations. In addition,
Contractor expressly agrees to comply with all federal and state tax laws. A condition or clause required by law to be
in this contract shall be considered included and incorporated into the Contract and made a part hereof by these
references.
16. Registration with Construction Contractor's Board
The Contractor, hereby certifies that the Contractor is licensed with the Construction Contractors Board or licensed
by the State Landscape Contractor's Board in accordance with ORS 701.035 to 701.055 and, further, that all
subcontractors performing work as described in ORS 701.005(2) (i.e., construction work) will be licensed with the
Construction Contractors Board or licensed by the State Landscape Contractor's Board in accordance with ORS
701.035 to 701.055 before the subcontractors commence work under the contract.
17. Prevailing Wages/ BOLI Fee
a. Contractor shall certify in the Contract and it shall be a condition of the bond, as provided in ORS 279C.800
through 279C.870, that in performing this Contract, Contractor will pay and cause to be paid not less than the.
prevailing rate of wages as of the date of the Public Notice, per hour, per day, and per week for and to each and every
worker who may be employed in and about the performance of the Contract. In accordance with ORS 279C.838,
each worker in each trade or occupation employed in the performance of the Contract either by Contractor ,
subcontractor or other person doing or contracting to do or contracting for the whole or any part of the work on the
Contract shall be paid not less than the applicable state or federal prevailing rate of wage, whichever is higher.
Copies of the current BOLI prevailing wage schedule and federal wage rate schedule, if applicable, are attached to
these Contract Documents as Or can be found at the following websites:
www.ore--on.uov/boli. When both federal and state prevailing wages are required to be included in the contract
specifications, the City shall also include in the specifications information showing which prevailing rate of wage is
higher for workers in each trade of occupation in each locality, as determined by the Commissioner of the Bureau of
Labor and Industries under ORS 279C.815 (2)(c). (see attached rate schedules)
b. Contractor shall be bound by and shall fully comply with ORS 279C.800 to 279C.870, Oregon's Prevailing
Wage Law. CONTRACTOR AGREES TO BE BOUND BY AND WILL COMPLY WITH PROVISIONS OF ORS
279C.840. Pursuant to ORS 279C.830(l), the existing prevailing rate of wage that may be paid to workers in each
trade or occupation required, in the form of a BOLI document, is included in the contract and bid documents and
made a part hereof by this reference. For public works for which the contract price is $50,000 or more, all workers
shall be paid not less than such specified minimum hourly rate of wage. [ORS 279C.830(1)]
C. . The City of Ashland shall pay the fee to the Commissioner of the Bureau of Labor and Industries pursuant to
the administrative rule of the commissioner and as provided in ORS 279C.825(1). The fee shall be paid on or before
the first progress payment or 60 days from the date work rust begins on the Contract, or as otherwise provided by
administrative rule, whichever is the earliest date. The fee is payable to the Bureau of Labor and Industries Wage and
Hour Division Prevailing Wage Unit 800 N.E. Oregon Street #32 Portland Oregon 97232.
d. Contractor and some subcontractors shall also file with the Construction Contractors Board a public works
bond with a corporate surety authorized to do business in this state in the amount of $30,000 as required by ORS
279C.836 and shall cause all subcontractors to do the same prior to starting work on the project. [ORS 279C.830(2)]
G.Ipub-wrks1en9112-02 N Main St Sidewalk RepairW_AdminlConstruction AdminlCons Pre ContractlContract formslConstruction Contract 9-7-
1012.doc
t
The bond must provide that the contractor or subcontractor will pay claims ordered by the Bureau of Labor and
Industries to workers performing labor upon public works projects. The bond must be a continuing obligation, and the
surety's liability for the aggregate of claims that may be payable from the bond may not exceed the penal sum of the
bond. The bond must remain in effect continuously until depleted by claims paid under this section, unless the surety
sooner cancels the bond. Contractor shall verify that subcontractors have complied with this requirement prior to
permitting the subcontractor to start work on the project.
e. If the Contract is for a public work and the Contract price is $50,000 or more, Contractor shall supply and
file, and require every Subcontractor to supply and file, with the City and with the Wage and Hour Division, Bureau
of Labor and Industries (BOLI), 800 NE Oregon 432, Portland, Oregon 97232 a certified statement in writing that
conforms to the requirements of ORS 279C.845.
18. Hours of Labor /Overtime limitation [ORS 279C.520] [ORS 279C.5401 [ORS 279C.545]
Pursuant to ORS 279C.520, no person may be employed for more than 10 hours in any one day, or 40 hours in any
one week, except in cases of necessity, emergency or when the public policy absolutely requires it, and in such cases,
except in cases of contracts for personal services, the employee shall be paid at least time and a half pay:
(a) (1) For all overtime in excess of eight hours in any one day or 40 hours in any one week when the work week is
five consecutive days, Monday through Friday; or
(2) For all overtime in excess of 10 hours in any one day or 40 hours in any one week when the work week is
four consecutive days, Monday through Friday; and
(b) For all work performed on Saturday and on any legal holiday specified in ORS 279C.540.
(c) Collective bargaining and negotiated labor agreements may provide exceptions to the requirements of this section
and from ORS 279C.520 and ORS 279C.540.
(d) When labor is employed by the City through another as a contractor, any worker employed by the contractor
shall be foreclosed from the right to collect for any overtime provided in ORS 279C.540 unless a claim for payment is
filed with the contractor within 90 days from the completion of the contract, providing the contractor has:
(1) Caused a circular clearly printed in boldfaced 12-point type and containing a copy of this section to be posted
in a prominent place' alongside the door of the timekeeper's office or in a similar place that is readily available and
freely visible to workers employed on the work.
(2) Maintained the circular continuously posted from the inception to the completion of the contract on which
workers are or have been employed.
(e) At or before the commencement of work, the Contractor shall give notice in writing to employees or by posting,
of the number of hours and days per week the employees may be required to work. [279C.520(2)(5)]
19. Medical Care and Workers Compensation [ORS 279C.530]
(1) Pursuant to ORS 279C.530(1), Contractor shall promptly, as due, make payment to any person, co-
partnership, association or corporation furnishing medical, surgical and hospital care services or other needed care
and attention, incident to sickness or injury, to the employees of the contractor, of all sums that the contractor agrees
to pay for the services and all moneys and sums that the contractor collected or deducted from the wages of
employees under any law, contract or agreement for the purpose of providing or paying for the services.
(2) Pursuant to ORS 279C.530(2), All employers, including Contractor, that employ subject workers who work
under this contract in the State of Oregon shall comply with ORS 656.017 and provide the required Workers
Compensation coverage unless such employers are exempt under ORS 656.126. Contractor shall ensure that each of
its subcontractors complies with these requirements..
20. Retainage
The withholding of retainage by a contractor or subcontractor on public improvement contracts shall be in accordance
with ORS 701.420 and 701.430. [279C.555] "Retainage" means the difference between the amount earned by a
contractor on a public improvement contract and the amount paid on the contract by the City. [279C.550] Moneys
retained by a contracting agency under ORS 279C.570 (7) shall either be: (a) retained in a fund by the City and paid
G9pub-wrks1engl12-02 N Main St Sidemik RepairlA_AdminlConstruction AdminlCons Pre ContractlContract /ormslConstruction Contract 9-7-
2012.doc
to the contractor in accordance with ORS 279C.570; or (b) At the election of the contractor, paid to the contractor in
accordance with the two options below:
• The contractor may deposit bonds, securities, or other instruments with the City or in any bank or trust
company to be held in lieu of the cash retainage for the benefit of the contracting agency. In such event the
City shall reduce the retainage in an amount equal to the value of the bonds, securities or instruments. and
pay the amount of the reduction to the contractor in accordance with ORS 279C.570. Interest on the bonds
or securities shall accrue to the contractor. {or}
• if the contractor elects, the City shall deposit the retainage, as accumulated, in an interest-bearing account in
a bank, savings bank, trust company or savings association for the benefit of the City. Earnings on the
account shall accrue to the contractor.
If the contracting agency incurs additional costs as a result of the exercise of the options in ORS 279C.560(1) or (5),
the City may recover such costs from the contractor by reduction of the final payment. As work on the contract
progresses, the contracting agency shall, upon demand, inform the contractor of all accrued costs. Bonds and
securities deposited or acquired in lieu of retainage, as permitted above, shall be of a character approved by the City ,
Attorney and City Finance Director, including but not limited to:
(a) Bills, certificates, notes or bonds of the United States.
(b) Other obligations of the United States or its agencies.
(c) Obligations of any corporation wholly owned by the federal government.
(d) Indebtedness of the Federal National Mortgage Association.
(e) General obligation Bond of the State of Oregon or a political subdivision thereof.
Unless the City finds that accepting a bond or instrument poses an extraordinary risk that is not typically associated
with such bond or instrument, the contractor may deposit a surety bond for all or any portion of the amount of funds
retained, or to be retained, by the City in a form acceptable to the City. The bond and any proceeds therefrom shall be
made subject to all claims and liens and in the same manner and priority as set forth for retainage under ORS
279C.550 to 279C.570 and 279C.600 to 279C.625. The City shall reduce the retainage in an amount equal to the
value of the bond and pay the amount of the reduction to the contractor in accordance with ORS 279C.570. Whenever
a City accepts a surety bond from a contractor in lieu of retainage, the contractor shall accept like bonds from any
subcontractor or supplier from which the contractor has retainage. The contractor shall then reduce the retainage in an
amount equal to the value of the bond and pay the amount of the reduction to the subcontractor or supplier.
[279C.560j
21. Progress Payments
a. Payment for all work under the Contract will be made promptly by the City at the price or prices bid, and
those prices shall include full compensation for all approved incidental work.
b. Contractor shall make progress estimates of work performed in any calendar month and submit to the City
for approval, before the fifth of the following month, or as mutually agreed between the Contractor and City. These
estimates shall include value of labor performed and materials incorporated in the work since commencing work
under the Contract. Such estimates need not be made by strict measurements and may be approximate only, and shall
be based upon the whole amount of money that will become due according to terms of the Contract when Project has
been completed. The City may include in payments eighty five percent (85%) of the cost to Contractor of materials
or equipment not yet incorporated in the Work but delivered and suitably stored at the site, or at some other location
agreed upon in writing. Such a payment shall be conditioned upon submission by the Contractor of bills of sale or
such other documentation satisfactory to the City Attorney to establish the City's title to such materials or equipment
or otherwise protect the City's interest including applicable insurance and transportation to the site, and a statement
from Contractor explaining why it is necessary to procure said equipment and/or materials. When such payments are
made, the Contractor warrants and guarantees that the title to all materials and equipment covered by a progress
payment, whether incorporated in the project or not, will pass to the City upon receipt of such payment by the -
Contractor, free and clear of all liens, claims, security interests or encumbrances. Notwithstanding the above, when
the progress estimate indicates that the progress payment would be less than one thousand dollars ($1,000), no
progress payment will be made for that estimate period, unless approved by the City.
G:Ipub-wrksien9112-02 N Main St Sidewalk RepairlA_AdminlConstruction AdminlCons Pre ContractlContract lormslConstruction Contract 9-7.
2012.doc
C. If the Contract price is determined, in whole or in part, on a Lump Sum basis, Contractor shall prepare an
itemized cost breakdown relating thereto and have the City approve same before commencing work; progress
estimates based on said itemized cost breakdown may be the basis for progress payments. Upon direction by the
City, Contractor shall provide for revision of the costs breakdown to reflect the true costs of the work as it progresses.
d. If the Contract price is determined wholly on a unit basis, City may use unit prices bid in making progress
estimates on the work. In case said unit prices do not, in the opinion of the City, truly represent actual relative costs
of different parts of work, a percentage of the Unit Price may be used in making progress estimate adjustments.
e. If the City receives written notice of any unsettled claims for damage or other costs due to Contractor's
operations including, without limitation, claims from any City Department or other governmental agency, an amount
equal to the claim may be withheld from the progress payments, final payments or retainage until such claim has been
resolved to the satisfaction of City.
f Progress payments will be made by City on a monthly basis within thirty (30) days from sign off by the
Contractor of the progress payment or fifteen (15) days after the payment is approved by City of work performed,
whichever is the earlier date. Failure to pay progress payments within the timeframe set forth above will result in the
imposition of interest as required by ORS 279C.570(2)(3). Defective or, improper invoices will be addressed as set
forth in ORS 279C.570(4)(5)(6).
g. Payment will be issued by City for the amount of the approved estimate, less five percent (5%) retainage.
Except as provided in paragraph 19 above and the applicable ORS Sections noted herein, such amount of retainage
shall be withheld and retained by City until it is included in and paid to Contractor as part of the final payment of the
Contract amount. Upon Substantial Completion of the work under the Contract which shall be understood to be not
less than ninety-seven and one-half percent (97.5%) of the work, the City may, at its discretion, reduce the retained
amount equivalent to not less than one hundred percent (100%) of the contract value or estimated value or estimated
cost, whichever is greater, of the work remaining to be done. [279C.570(7)]
It. The City may decline to approve an application for payment and may withhold such approval if, in the City's
opinion, and in good faith, the work has not progressed to the point indicated by.the Contractor's submittal. The City
may also decline to approve an application for payment or may reduce said payment or, because of subsequently
discovered evidence or subsequent inspections, City may nullify the whole or any part of any payment previously
made to such extent as may be necessary in their opinion to protect the City from loss because of: (1) defective work
not remedied, (2) third party claims filed or failure of the Contractor to make payments properly to Subcontractors for
labor, materials or equipment, unless Surety consents to such payment, (3) reasonable doubt that the work can be
completed for the unpaid balance' of the Contract sum, (4) damage to another contractor's work, (5) reasonable
indication that the work will not be completed within the Contract time, (6) unsatisfactory prosecution of the work by
the Contractor, (7) claims against the Contractor by the City, (8) failure to submit a construction schedule or failure to
keep said construction schedule updated, or (9) exceeding work limits. When any or all of the criteria set forth above
have been remedied satisfactorily to the City, payment shall be made for amounts withheld because of them.
Withholding of progress payments or partial payments under the criteria set forth above shall not entitle the
Contractor to interest on such withheld payments or partial payments, except as provided in ORS 279C.570(9).
i. If Contractor fails to complete the Project within the time limit fixed in the Contract or any extension, no
further estimate may be accepted or progress or other payments allowed until the Project is completed, unless
approved otherwise by City. Progress estimates are for the sole purpose of determining progress payments and are
not to be relied on for any other purpose. A progress payment is not considered acceptance or approval of any work
or materials or waiver of any defects therein. [ORS 279.570(2)].
22. Final Estimate and Final Payment
a. SUBSTANTIAL COMPLETION. Contractor shall notify the City in writing when all or a portion of the
work is considered substantially complete. If it appears to the City that the work is not substantially complete, the
City shall not make an inspection. The City may make a general list of major work components remaining. If it
appears that the work is substantially complete, the City shall, within fifteen (15) days after receiving notice, make an
inspection and either accept the work or notify Contractor of work yet to be performed. If accepted, City shall
G:Ipub-wrks1eng112-02 N Main St Sidewalk RepairlA_AdminlConstruction AdminlCons Pre Contracilcontract /orms1construction Contract 9-7-
2012.doc
h. If City declares a default of the Contract, and Surety completes said Contract, all payments made after
declaration of default and all retainage held by City shall be paid to Surety and not to Contractor in accordance with
the terms of the Contract.
L Acceptance by Contractor of final payment shall release City from any and all claims by Contractor whether
known or unknown, arising out of and relating to the work. No payment, however, final or otherwise, shall operate to
release Contractor or its Sureties from warranties or other obligations required in the performance of the Contract.
j. Disputes as to compensation resolved in favor of the contractor implicate the interest provisions of ORS
279.570(9).
23. Change Orders / Extra Work
The Contractor agrees to complete this Contract in accordance with the attached specifications and requirements,
including any change orders. A change order submitted by the City must be agreed upon by the Contractor and the
City, and in the event of failure to so agree, the City may then proceed with any additional work in any manner the
City may choose. A decision by the City to proceed to have work done by another party shall in no way relieve either
the Contractor or City of this Contract and neither will such action be cause for collection of damages by either party
to the contract, one from the other. Only the City designated Contracting Officer or individual with delegated
contracting authority can authorize extra (and/or changed) work and compensation. Such authorization must be in
writing. The parties expressly recognize that, except when such order is in writing by an individual with delegated
authority, City personnel are not authorized to order extra (and/or) changed work or to waive contract requirements or
authorize additional compensation. Failure of the Contractor to secure City authorization' for extra work shall
constitute a waiver of any and all claims or rights to adjustment in the contract price or contract time due to such
unauthorized extra work and thereafter Contractor shall be entitled to no compensation whatsoever for the
performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and
quantum meruft for any and all extra work performed by Contractor without express and prior authorization of the
City.
24. Contractor/Subcontractor Payment Obligations
a. The Contractor is required to include in each subcontract for property or services entered into by the
Contractor and a first-tier subcontractor, including a material supplier, for the purpose of performing this contract:
i. A payment clause that obligates the Contractor to pay the first-tier subcontractor for satisfactory
performance under its subcontract within 10 days out of such amounts as are paid to the Contractor by the City under
such contract; [279C.580(3)(a)] and
ii. _ An interest penalty clause that obligates the Contractor, if payment is not made within 30 days after
receipt of payment from the City, to pay to the fist-tier subcontractor an interest penalty on amounts due in the case
of each payment not made in accordance with the payment clause included in the subcontract pursuant to paragraph
(a)(i) above. A contractor or first-tier subcontractor shall not be obligated to pay an interest penalty if the only reason
that the contractor or first-tier subcontractor did not make payment when payment was due is that the contractor or
first-tier subcontractor did not receive payment from the City or contractor when payment was due. The interest
penalty shall be:
A. For the period beginning on the day after the required payment date and ending on the date on
which payment of the amount is due made; and
B. Computed at the rate specified in ORS 279C.515(2). [279C.580(3)(b)]
b. The Contractor is further required to include in each of its subcontracts, for the purpose of performance of
such contract condition, a provision requiring the first-tier subcontractor to include a payment clause and an interest
penalty clause conforming to the standards of section a. above in each of its subcontracts and to require each of its
subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or supplier.
[279C.580(4)]
GApub-wrks1eng112-01 N Main St Sidewalk RepairlA_AdminlConstruction Admin;Cons Pre ContmcnConfmct formslConstruction Contract 9-7-
2012.doc
prepare a Certificate of Substantial Completion, Exhibit F. Upon acceptance of the Certificate of Substantial
Completion by both parties, the City shall be responsible for operation and maintenance of that part of the work
described in the Certificate of Substantial Completion, subject to the warranty requirements and protection of the
work and all other applicable terms of the contract documents. The date of substantial completion of all the work
shall stop the accrual of liquidated damages, if applicable.
b. FINAL COMPLETION. Contractor shall notify the City in writing when work is 100% complete. If it
appears to the City that the work is not 100% complete, the City shall not make a final inspection. The City may
make a general list of major work components remaining. If it appears that the work is 100% complete, the City
shall, within fifteen (15) days after receiving notice, make a final inspection and either accept the work or notify
Contractor of work yet to be performed on the Contract. A Certificate of Final Completion shall not be prepared until
all provisions of the Contract have been met, including but not limited to, the submission by the Contractor of a
signed Certificate of Compliance, Exhibit G and executed "Release of Liens and Claims."(Exhibit H).
b. When the work is 100% complete, the City shall prepare a final pay estimate and Certificate of Final
Completion accepting the work as of a certain date. The Contractor shall execute and return the final pay estimate and
Certificate of Final Completion within five (5) working days of receipt. Unless otherwise provided as a Special
Provision, when City accepts the Certificate of Final Completion, the date the Contractor signs the Certificate of Final
Completion shall be the date the City accepts Ownership of the work and the start date of the warranty period. The
contractor may substitute a Warranty Bond in replacement of the Performance and Payment Bonds in accordance
with Section 29. The City shall include in the final pay estimate an addition to the contract amount for any contract
deduction from the contract amount for any liquidated damages and a deduction from the contract price in a fair and
equitable amount for any damages to the City or for any costs incurred or likely to be incurred by the City due to
Contractor's failure to meet any contract provision or specification other than timely completion.
C. If the Contractor believes the quantities and amounts specified in the final pay estimate prepared by the City
to be incorrect, Contractor shall submit to the City within five (5) working days of receipt of the City's final pay
estimate, an itemized statement of any and all claims for additional compensation under the Contract which are based
on differences in measurements or errors of computation. Any such claim not so submitted and supported by an
itemized statement within said period is expressly waived and the City shall not be obligated to pay the same.
d. The Contractor shall commence any suit or action to collect or enforce the claim or claims for any additional
compensation arising from errors of computation in the final estimate within a period of one (1) year following the
original mailing of the City's final estimate and Certificate of Final Completion to the Contractor's last known address
as shown in the records of City. The City's issuance of a revised final estimate pursuant to this subsection does not
alter the original final estimate date. If said suit, action or proceeding is not commenced in said one (1) year period,
the final estimate and Certificate of Final Completion or revised final estimate and Certificate of Final Completion, if
revisions are made, shall be conclusive with respect to the amount earned by the Contractor, and the Contractor
expressly waives any and all claims for compensation and any and all causes of suit or action for the enforcement
thereof that Contractor might have had.
e. Upon return of the fully executed Certificate of Final Completion from the Contractor, the City will submit
the Certificate of Final Completion and final estimate to the City for approval. Upon approval and acceptance by the
City, Contractor will be paid a total payment equal to the amount due under the Contract including retainage within
thirty (30) days in accordance with ORS 279C.570. Failure to pay within 30 days shall implicate the interest on final
payment/ retainage requirements of ORS 279C.570(8).
f. Monies earned by the Contractor are not due and payable until the procedures set forth in the contract
documents for inspection, approval and acceptance of the work; for determination of the work done and the amount
due therefore; for the preparation of the final estimate and Certificate of Final Completion and processing the same
for payment; for consideration of the Contractors claim, or claims, if any; and for the preparing of a revised final
estimate and Certificate of Final Completion and processing same for payment all have been carried out.
g. As a prerequisite to final payment,-if Contractor is not domiciled in or registered to do business in the State
of Oregon, the Contractor will provide City with evidence that the requirement of ORS 279A.120(3) has been
satisfied.
G:lpub-wrksleng112-02 N Main St Sidowaik RepaielA_AdminlConstruction AdminlCons Pre ContractlContracl formslConstruction Contract 9-7-
2012.doc
C. The Contractor shall not request payment of any amount withheld or retained in accordance with ORS
279C.580(5) until such time as the Contractor has determined and certified to the City that the subcontractor is
entitled to the payment of such amount. [279C.570(1)].
d. A dispute between the Contractor and a subcontractor relating to the amount or entitlement of a
subcontractor to a payment or a late payment interest penalty under a clause included in the subcontract pursuant to
subsections (3) and (4) of ORS 279C.580 does not constitute a dispute to which the City is a party. The City shall not
be included as a party in any administrative or judicial proceeding involving such a dispute. [279C.580(2)]
C. The Contractor shall make payment promptly, as due, to all persons supplying to the Contractor labor or
material for the performance of the work provided for in the contract. [ORS 279C.505(1)(a)] The Contractor shall
pay all contributions or amounts due the Industrial Accident Fund and the State Unemployment Compensation Fund
from the Contractor or Subcontractor incurred in the performance of the contract. [ORS 279C.505(1)(b)] The
Contractor shall not permit any claim or lien to be filed or prosecuted against the City and shall be fully responsible
for any lien or claim filed against the City on account of any labor or material famished. [ORS 279C.505(1)(c)]
The Contractor shall pay to the Department of Revenue all sums withheld from employees pursuant to ORS 316.167.
[ORS 279C.505(I)(d)]
f Pursuant to ORS 279C.515(1), if Contractor fails, neglects or refuses to make prompt payment of any claim
for labor or services furnished to the Contractor or a subcontractor by any person in connection with the Contract as
such claim becomes due, the proper officer(s) representing the City may pay the claim and charge the amount of the
payment against funds due or to become due Contractor under this Contract.
g. Pursuant to ORS 279C.515(2), if the Contractor or a first-tier subcontractor fails, neglects or refuses to make
payment to a person furnishing labor or materials in connection with the public improvement contract within 30 days
after receipt of payment from the contracting agency or a contractor, the contractor or first-tier subcontractor shall
owe the person the amount due plus interest charges commencing at the end of the l0-day period that payment is due
under ORS 279C.580 (4) and ending upon final payment, unless payment is subject to a good faith dispute as defined
in ORS 279C.580. The rate of interest charged to the contractor or first-tier subcontractor on the amount due shall
equal three times the discount rate on 90-day commercial paper in effect at the Federal Reserve Bank in the Federal
Reserve district that includes Oregon on the date that is 30 days after the date when payment was received from the
contracting agency or from the contractor, but the rate of interest may not exceed 30 percent. The amount of interest
may not be waived.
h. Pursuant to ORS 279C.515(3), if the Contractor or a subcontractor fails, neglects or refuses to make payment to
a person furnishing labor or materials in connection with the public improvement contract, the person may file a
complaint with the Construction Contractors Board, unless payment is subject to a good faith dispute as defined in
ORS 279C.580.
i. Pursuant to ORS 279C.515(4), the payment of a claim in the manner authorized in this section does not relieve
the contractor or the contractor's surety from obligation with respect to any unpaid claims.
j. Living Wage Rates: If the amount of this contract is $18,703 or more, and Contractor is not paying prevailing
wage for the work, Contractor must comply with Chapter 3.12 of the Ashland Municipal Code by paying a living
wage, as defined in this chapter, to all employees performing work under this contract and to any subcontractor who
performs 50% or more of the work undathis contract. Contractor must post the attached Living Wage notice
predominantly in areas where it will be seen by all employees.
25. Inspection and Acceptance
Inspection and acceptance of all work required under this contract shall be performed by the City. The Contractor
shall be advised of the acceptance or of any deficiencies in the deliverable items.
26. Liquidated Damages
City and Contractor recognize that time is of the essence of this Contract and that City will suffer substantial financial
loss if the project work is not completed within the timeframe specified in Section (1) of the Public Improvement
G:Iputrwrks1eng112-02 N Main St Sidewalk RepairL9_Adminiconstruction AdminlCons Pre Contmcticontract formsiconstruction Contract 9-7-
2012.doc
I
Contract. City and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or
other dispute resolution preceding the actual loss suffered by City if the project work is not completed on time.
Accordingly, instead of requiring any such proof, City and Contractor agree that as liquidated damages for delay (but
not as a penalty) the Contractor shall pay the City Five Hundred Dollars per day ($500.00/day) for each and every
day that elapses in excess of the contract time or the final adjusted contract time. This amount is a genuine pre-
estimation of the damages expected because of a delay in the completion of this project.
Any sums due as liquidated damages shall be deducted from any money due or which may become due to the
Contractor under this Contract. Payment of liquidated damages shall not release the Contractor from obligations in
respect to the fulfillment of the entire contract, nor shall the payment of such liquidated damages constitute a waiver
of the City's right to collect any additional damages which may be sustained by failure of the Contractor to complete
the work on time. Permitting the Contractor to continue and finish the project work or any part thereof after the
contract time, or adjusted contract time, has expired shall in no way operate as a waiver on the part of the City or any
of its rights under this contract. The City may in its discretion grant the Contractor an extension of time upon a
showing made by the Contractor that the work has been unavoidably delayed by conditions beyond the control of the
parties.
27. Liability, Indemnity and Hold Harmless
Contractor warrants that all its work will be performed in accordance with generally accepted practices and standards
as well as the requirements of applicable federal, state, and local laws, it being understood that acceptance of
Contractor's work by City shall not operate as a waiver or release. The Contractor shall hold harmless, indemnify,
and defend City, its officers, agents, and employees from any and all liability, actions, claims, losses, damages or
other costs of whatsoever nature, including attorney's fees and witness costs (at both trial and appeal level, whether or
not a trial or appeal ever takes place) that may be asserted by any person or entity arising from, during or in
connection with the performance of the work, actions or failure to perform actions, and other activities of Contractor
or its officers, employees, subcontractors or agents, under this contract, including the professional negligent acts,
errors, or omissions of Contractor or its officers, employees, subcontractors, or agents except liability arising out of
the sole gross negligence of the City and its employees. The Contractor shall assume all responsibility for the work
and shall bear all losses and damages directly or indirectly resulting to the Contractor, to the City, and to their
officers, agents, and employees on account of (a) the character or performance of the work, (b) unforeseen
difficulties, (c) accidents, or (d) any other cause whatsoever. The Contractor shall assume this responsibility even if _
(a) fault is the basis of the claim, and (b) any act, omission or conduct of the City connected with the Contract is a
condition or contributory cause of the claim, loss, damage or injury. Contractor waives any and all statutory or
common law rights of defense and indemnification by the City. Such indemnification shall also cover claims brought
against City under state or federal workers compensation laws. Contractor shall also defend and indemnify City from
all loss or damage that may result from Contractor's wrongful or unauthorized use of any patented article or process.
If any aspect of this indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or
invalidity shall not affect the validity of the remainder of this indemnification. Any specific duty or liability imposed
or assumed by the Contractor as may be otherwise set forth in the Contract documents shall not be construed as a
limitation or restriction of the general liability or duty imposed upon the Contractor by this section. In the event any
such action or claim is brought against the City, the Contractor shall, if the City so elects and upon tender by the City,
defend the same at the Contractor's sole cost and expense, promptly satisfy any judgment adverse to the City or to the
City and the Contractor jointly, and reimburse the City for any loss, cost, damage, or expense, including attorney fees,
suffered or incurred by the City.
28. Insurance
The Contractor shall provide and maintain during the.life of this Contract the insurance coverage as described in
Exhibit C. All costs for such insurance shall be borne by the Contractor and shall be included in the contract price.
In case of the breach of any provision of this section, the City may elect to take out and maintain at the expense of the
Contractor such insurance as the City may deem proper. The City may deduct the cost of such insurance. from any.
monies that may be due or become due the Contractor under this Contract. Failure to maintain insurance as provided
is also cause for immediate termination of the Contract. Contractor shall furnish City certificates of insurance
acceptable to City prior to execution by the City and before Contractor or any subcontractor commences work under
this Contract. The certificate shall-show the name of the insurance carrier, coverage, type, amount (or limits), policy
numbers, effective and expiration dates and a description of operations covered. The certificate will include the
G:Ipub-wrksleng112-02 N Main St Sidewalk RepaMA-AdminlConstruclion AdminlCans Pre ContracnContract formslConstruction Contract 9-7-
2012.doc
deductible or retention level and required endorsements. Insuring companies or entities are subject to City's
acceptance. If requested, copies of insurance policies shall be provided to the City. Contractor shall be responsible
for all deductibles, self-insured retention's, and/or self-insurance. Approval of the insurance shall not relieve or
decrease the liability of the Contractor hereunder.
29. Performance, Payment and Warranty Bonds / Notice of Bond Claims
At the time of execution of the Contract, the Contractor shall furnish: (1) Performance Bond and (2) Payment Bond
written by a corporate surety or other financial assurance in an amount equal to the amount of the Contract based
upon the estimate of quantities or lump sum as set forth in the Contract and in accordance with ORS 279.380. The
bonds shall be continuous in effect and shall remain in full force and effect until compliance with and fulfillment of
all terms and provisions of the Contract, including the obligations of Sections 27 and 30, all applicable laws and the
prompt payment of all persons supplying labor and/or material for prosecution of the work. The bond(s) or other
financial assurance is subject to approval by the City.
Contractor shall furnish a separate warranty bond written by a corporate surety or other financial assurance, in an
amount equal to 10%,of the final amount of the contract. The City may permit the warranty amount to be included in
the initial performance and payment bonds. The warranty bond or other financial assurance shall be in effect for a
period of one year from the date of Final Completion. The City may require a separate warranty bond or financial
assurance for any repairs done pursuant to the warranty obligation. Such separate warranty bond or financial
assurance shall be for a period of one year from the date of completion of such repairs.
The notice of claim on a bond required by ORS 279C.600 must be sent by registered or certified mail or hand
delivered no later than 120 days after the day the person last provided labor or furnished materials or 120 days after
the worker listed in the notice of claim by the Commissioner of the Bureau of Labor and Industries last provided
labor. The notice may be sent or delivered to the contractor at any place the contractor maintains an office or conducts
business or at the residence of the contractor. Notwithstanding the above, if the claim is for a required contribution
to a fund of any employee benefit plan, the notice required by ORS 279C.600 must be sent or delivered within 150
days after the employee last provided labor or materials.
The notice of claim must be in writing substantially as set forth in ORS 279C.605(3)-(5).
30. One-Year Warranty
a. In addition to and not in lieu of any other warranties required under the Contract, Contractor shall make all
necessary repairs and replacements to remedy, in a manner satisfactory to the City and at no cost to the City, any and
all defects, breaks, or failures of the work occurring within one year following the date of completion due to faulty or
inadequate materials or workmanship. Repair damage or disturbances to other improvements under, within, or
adjacent to the work, whether or not caused by settling, washing, or slipping, when such damage or disturbance is
caused, in whole or in part, from activities of the Contractor in performing its duties and obligations under this
Contract when such defects or damage occur within the warranty period. The one-year warranty period shall, with
relation to such required repair, be extended one year from the date of completion of such repair.
If Contractor, after written notice, fails within ten days to proceed to comply with the terms of this section, City may
have the defects corrected, and the Contractor and Contractor's surety shall be liable for all expense incurred. In case
of an emergency where, in the opinion of the City, delay would cause sefious loss or damage, repairs may be made
without notice being given to Contractor and Contractor or Surety shall pay the cost of repairs. Failure of the City to
act in case of an emergency shall not relieve Contractor or Surety from liability and payment of all such costs.
31. Nondiscrimination in Labor
No person shall be subject to discrimination in the receipt of the benefits of any services or activities made possible
by or resulting from this Agreement on the grounds of sex, race, color, creed, marital status, age, sexual orientation or
national origin. Contractor shall comply with provisions of Owner's Equal Opportunity Policy and comply with ORS
Chapter 659 and ORS Chapter 659A relating to unlawful employment, practices and discrimination by employers
against any employee or applicant for employment because of race, religion, color, sex, national origin, marital status
GApub-wrkslenguM2 N Main St Sidewalk RepairWAdminlConstruction AdminlCons Pre ContmctlContract formslConstruction Contact 9-7-
2012.doc
or age if the individual is 18 years of age or older. Particular reference is made to ORS 659A.030, which states that it
is unlawful employment practice for any employer, because of the race, religion, color, sex, national origin, marital
status or age if the individual is 18 years or older or because of the race, religion, color, sex, national origin or age of
any other person with whom the individual associates, or because of a juvenile record that has been expunged
pursuant to ORS 419A.260 and ORS 419A.262 of any individual, or to refuse to hire or employ or to bar or discharge
from employment such individual or to discriminate against such individual in compensation or in terms, conditions
or privileges of employment. Any violation of this provision shall be considered a material violation of the
Agreement and shall be grounds for cancellation, termination, or suspension in whole or in part.q
32. Construction Debris and Yard Waste
Contractor shall salvage or recycle construction and demolition debris, if feasible and cost effective. If the contract
includes lawn and landscaping maintenance, Contractor shall compost or mulch yard waste material at an approved
site, if feasible and cost effective. [ORS 279C.510(1)&(2)]
33. Environmental Regulations
Pursuant to ORS 279C.525(l), the following is a list of federal, state and local agencies which have enacted
ordinances or regulations dealing with the prevention of environmental pollution and the preservation of natural
resources that may affect the.performance of the contract.
Federal Agencies:
Agriculture, Department of
Forest Service
Soil Conservation Service
Commerce Department of
National Oceanic and Atmospheric Administration (NOAA)
National Marine Fisheries Service (NMFS)
Defense, Department of
Army Corps of Engineers
Energy, Department of
Federal Energy Regulatory Commission
Environmental Protection Agency
Health and Human Services Department of
Housing and Urban Development,
Solar Energy and Energy Conservation Bank
Interior, Department of
Bureau of Land Management
Bureau of Indian Affairs
Bureau of Mines
Bureau of Reclamation
Geological Survey
Minerals Management Service -
U.S. Fish and Wildlife Service
Labor, Department of
Mine Safety and Health Administration
Occupational Safety and Health Administration
Transportation, Department of
Coast Guard
Federal Highway Administration
Water Resources Council
State Agencies:
Administrative Services, Department of
Agriculture, Department of
G:Wubwrksleng112-02 N Main St Sidewalk RepairlA_AdminlConstruc0on AdminlCons Pre ContractlContract rormslConstrucGOn Contract 9-7-
2012.doc
(e) Solicit bids for a new contractor to provide the necessary services; or
(f) Issue the contractor a change order setting forth the additional work that must be undertaken.
If the City chooses to terminate the contract under either subsection(a) of this section, the Contractor shall be entitled
to all costs and expenses incurred to the date of termination, including overhead and reasonable profits, on the
percentage of the work completed. The City shall have access to the contractor's bid documents when making the
contracting agency's determination of the additional compensation due to the contractor. If the contracting agency
causes work to be done by another contractor under either subsection (c) or (e) above, the initial contractor may not
be held liable for actions or omissions of the other contractor. The change order under either subsection (f) of this
section shall include the appropriate extension of contract time and compensate the contractor for all additional costs,
including overhead and reasonable profits, reasonably incurred as a result of complying with the applicable statutes,
ordinances, rules or regulations. The City shall have access to the contractor's bid documents when making the
contracting agency's determination of the additional compensation due to the contractor.
Notwithstanding the above, the City has allocated all or a portion of the known environmental and natural resource
risks to a Contractor by listing such environmental and natural resource risks in the solicitation documents; and
34. Waiver
The failure of the City to enforce any provision of this contract shall not constitute a waiver by the City of that or any
other provision. City shall not be precluded or estopped by any measurement, estimate or certificate made either
before or after completion and acceptance of work or payment therefore, from showing the true amount and character
of work performed and materials furnished by the Contractor, or from showing that any such measurement, estimate
or certificate is untrue or incorrectly made, or that work or materials do not conform in fact to the Contract. City shall
not be precluded or estopped, notwithstanding any such measurement, estimate or certificate, or payment in
accordance therewith, from recovering from the Contractor and their Sureties such damages as it may sustain by
reason of their failure to comply with terms of the Contract, or from enforcing compliance with the Contract. Neither
acceptance by City, or by any representative or agent of the City, of the whole or any part of the work, nor any
extension of time, nor any possession taken by City, nor any payment for all or any part of the project, shall operate
as a waiver of any portion of the Contract or of any power herein reserved, or any right to damages herein provided.
A waiver of any breach of the Contract shall not be held to be a waiver of any other breach.
35. Errors.
The Contractor shall perform such additional work as may be necessary to correct errors in the work required under
this contract without undue delays and without additional cost.
36. Governing Law
The provisions of this contract shall be construed in accordance with the laws of the State of Oregon and ordinances
of the City of Ashland, Oregon. Any action or suits involving any question arising under this contract must be
brought in the appropriate court in Jackson County, Oregon. If the claim must be brought in a federal forum, then it
shall be brought and conducted in the United States District Court for the District of Oregon. Contractor, by the
signature herein of its authorized representative, hereby consents to the in personam jurisdiction of said courts. In no
event shall this section be construed as a waiver of the City of any form of defense or immunity..
37. Severability
If any term or provision of this contract is declared by a court of competent jurisdiction to be illegal or in conflict
with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations
of the parties shall be construed and enforced as if the contract did not contain the particular term or provision held
invalid.
38. Attorney's Fees
GApu&wrkslen9l12-02 N Main St Sidewalk Repa!M AdminlConstruction AdminlCons Pre Contracticontract tormslconsiruction Contract 9-7-
2012.doc
Consumer & Business Services, Department of
Oregon Occupational Safety & Health`Division
Energy, Department of
Environmental Quality, Department of
Fish and Wildlife, Department of
Forestry, Department of
Geology and Mineral Industries, Department of
Human Resources, Department of
Land Conservation and Development Commission
Parks and Recreation, Department of
Soil and Water Conservation Commission
State Engineer
State Land Board (Lands, Division of State)
Water Resources Department
Local Agencies:
CITY of ASHLAND
City Council (Ashland Municipal Code)
County Courts
County Commissioners of Jackson County,
County Service Districts ,
Sanitary Districts
Water Districts
Fire Protection Districts
Historical Preservation Commissions
Planning Commission
If the Contractor awarded the project is delayed or must undertake additional work by reason of existing ordinances,
rules or regulations of agencies not cited above or due to the enactment of new or the amendment of existing statutes,
ordinances, rules or regulations relating to the prevention of environmental pollution and the preservation of natural
resources occurring after the submission of the successful bid, the City may:
(a) Terminate the contract;
(b) Complete the work itself,
(c) Use non-City forces already under contract with the City;
(d) Require that the underlying property owner be responsible for cleanup;
(e) Solicit bids for a new contractor to provide the necessary services; or
(f) Issue the contractor a change order setting forth the additional work that must be undertaken.
The solicitation documents make specific reference to known conditions at the construction site that may require the
successful bidder to comply with the ordinances, rules or regulations identified above. If Contractor encounters a
condition not referred to in the solicitation documents, not caused by the successful bidder and not discoverable by a
reasonable pre-bid visual site inspection, and the condition requires compliance with the ordinances, rules or
regulations enacted by the governmental entities identified above, the successful bidder shall immediately give notice
of the condition to the contracting agency. Except in the case of an emergency and except as may otherwise be
required by any environmental or natural resource ordinance, rule or regulation, the Contractor shall not commence
work nor incur any additional job site costs in regard to the condition encountered and described in subsection (3) of
this section without written diction from the contracting agency. Upon request by the City, the Contractor shall
estimate the emergency or regulatory compliance costs as well as the anticipated delay and costs resulting from the
encountered condition. This cost estimate shall be promptly delivered to the contracting agency for resolution. Within
a reasonable period of time following delivery of an estimate of this section, the City may:
(a) Terminate the contract;
(b) Complete the work itself;
(c) Use non-City forces already under contract with the City;
(d) Require that the underlying property owner be responsible for cleanup;
G:Wub-wrks1eng112-02 N Main St Sidewalk RepairlA_AdminlConstruction AdminlCons Pre ContractlContract formslConstruction Contract 9-7-
2012.doc
If a suit or action is filed to enforce any of the terms of this contract, the prevailing party shall be entitled to recover
from the other party, in addition to costs and disbursements provided by statute, any sum which a court, including any
appellate court, may adjudge reasonable as attorney's fees.
39. Business License
The Contractor shall obtain a City of Ashland business license as required by City Ordinance prior to beginning work
under this contract. The Contractor shall provide a business license number in the space provided in this contract.
40. NoticesBills/Payments
All notices, bills, and payments shall be made in writing and may be given by personal delivery or by mail. Notices,
bills, and payments sent by mail should be addressed as follows:
City: Division of Engineering
City of Ashland
Public Works Department
20 East Main Street
Ashland, OR 97520
and when so addressed, shall be deemed given upon deposit in the United States Mail, postage prepaid. In all other
instances, notices, bills, and payments shall be deemed given at the time of actual delivery. Changes may be made in
the names and addresses of the person to whom notices, bills, and payments are to be given by giving notice pursuant
to this paragraph.
41. Conflict of Interest
Contractor covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which
would conflict in any manner or degree with the performance of its services. The Contractor further covenants that in
the performance of this contract no person having any such interest shall be employed. .
42. Merger Clause
THIS CONTRACT AND ATTACHED EXHIBITS CONSTITUTE THE ENTIRE AGREEMENT BETWEEN THE
PARTIES. NO WAIVER, CONSENT, MODIFICATION OR CHANGE OF TERMS OF THIS CONTRACT
SHALL BIND EITHER PARTY UNLESS IN WRITING AND SIGNED BY BOTH PARTIES. SUCH WAIVER,
CONSENT, MODIFICATION OR CHANGE, IF MADE, SHALL BE EFFECTIVE ONLY IN THE SPECIFIC
INSTANCE AND FOR THE SPECIFIC PURPOSE GIVEN. THERE ARE NO UNDERSTANDINGS,
AGREEMENTS, OR REPRESENTATIONS, ORAL OR WRITTEN, NOT SPECIFIED HEREIN REGARDING
THIS CONTRACT. BY ITS SIGNATURE, CONTRACTOR ACKNOWLEDGES IT HAS READ AND
UNDERSTANDS THIS CONTRACT, AND AGREES TO BE BOUND BY ITS TERMS AND CONDITIONS.
ATTACHMENTS: EXHIBITS A-J
EXHIBIT A STANDARD TERMS AND CONDITIONS FOR PUBLIC IMPROVEMENT CONTRACTS
EXHIBIT B COMPLIANCE WITH APPLICABLE PUBLIC CONTRACT LAW
EXHIBIT C INSURANCE REQUIREMENTS
EXHIBIT D INDEPENDENT CONTRACTOR CERTIFICATION
EXHIBIT E BONDS (BID, PAYMENT AND PERFORMANCE)
EXHIBIT F CERTIFICATE OF SUBSTANTIAL COMPLETION
EXHIBIT G CERTIFICATE OF COMPLIANCE
EXHIBIT H RELEASE OF LIENS AND CLAIMS
EXHIBIT I CERTIFICATE OF FINAL COMPLETION
EXHIBIT J STATUTORY PUBLIC WORKS BOND (SOLI REQUIREMENT)
BID SCHEDULE
G:Ipub-wrks1eng112-02 N Main St sidewalk Repai6A_AdminlConstruction AdminlCons Pre ContractiContract formslConstruction Contract 9-7-
2012.doc
EXHIBIT B
COMPLIANCE WITH APPLICABLE LAW
PUBLIC IMPROVEMENT CONTRACT
This exhibit contains the requirements for public contracting as set forth in ORS Chapter
279C.360 through and including 279C.800 and is available through the city Engineering Office at
51 Winburn Way, Ashland, Oregon or online at,.«iw.lee.state.or.us/ors
G:tpu6-wrkslen9112-02 N Main St Sidewalk RepairlA_AdminlConstruction AdminlCons Pre ContracAContract /ormslConstruction Contract 9-7-
2012.doc
PERFORMANCE BOND
The undersigned Cut N Break Construction Inc as
principal, further referred to in this bond as Contractor, and Western Surety Company
as surety further referred to in this bond as Surety, are jointly and severally bound unto
City of Ashland, as obligee, further referred to in this bond as City, in the sum of Sixty Thousand four hundred
six dollars and 00 cents.
Dollars 60,406.00
Contractor and City have entered into a written contract dated Z J t
j or the following project: N. MAIN SIDEWALK REPAIR. This contract is further
referred to in this bond as the Contract and is incorporated into this bond by this reference.
The conditions of this bond are:
L If Contractor faithfully Wrforms the Contract in accordance with the plans specifications and
conditions of the contract within the time prescribed by the Contract, as required by ORS 279C.
380 through 279C.385, then this obligation is null and void: otherwise it shall remain in full force
and effect_
2. If Contractor is declared by City to be in default under the Contract, the Surety shall promptly
remedy the default, perform all of Contractor's obligations under the contract in accordance with
its terms and conditions and pay to City all damages that are due under the Contract.
3. This bond is subject to claims under ORS 279C.380 through 279C.390.
4. This obligation jointly and severally binds Contractor and Surety and their respective heirs,
executors, administrators, successors.
5. Surety waives notice of modification of the Contract or extension of the Contract time.
6. Nonpayment of the bond premium shall not invalidate this bond.
7. The bond number and the name, address, and telephone number of the agent authorized to receive
notices concerning this bond are as follows.
71341492
Bond Number:
Bond Agent: Barbara Pinkham - Beecher Carlson Insurance Agency, LLC
Address: 707 Murphy Road
Medford, OR 97604
Telephone: 641-772-1111
SIGNED this 31 st day of October 2012,
PERFORMANCE BOND Pace 2
WITNESS: CONTRACTOR: P" N re 7 o ion Inc
(Corporate Seal) Title:
By
Legal Address: PO Box 1455
Medford, OR, 9/7501-0108
Attest: ~FI,~A~
Corporate Secretary
WITNESS: SURETY: Western Surety Company
(Corporate Seal) By'
Susan Wilson
Title: Attorney-in-fact
Legal Address: 12909 SW 68th Parkway, Suite 200
o7223
Atte
O)Attomey-in-
arbara P
inkham
m
PAYMENTBOND
The undersigned Cut N Break Construction Inc as
principal, further referred to in this bond as Contractor. and Western Surety Company
. as surety, further referred to in this bond as Surety, are jointly and severally bound unto
City of Ashland, as obligee, further referred to in this bond as City, in the sum of Sixty Thousand four hundred
six dollars and 00 cents.
Dollars 60,406.00 1.
Contractor and City have entered into a written contract dated O C4~b ti✓ 31. -7 D
for the followingproiect: N. MAIN SIDEWALK REPAIR. This contract is further
referred to in this bond as the Contract and is incorporated into this bond by this reference
The conditions of this bond are:
1. If Contractor faithfully performs the Contract within the time prescribed by the Contract, and prom
makes payment to all claimants, as defined in ORS 279C.600 through 279C.620, then this obli ation is
null and void: otherwise it shall remain in full force and effect.
2. If Contractor is declared by City to be in default under the Contract the Surety shall promptly remedy
the default, perform all of Contractor's obligations under the contract in accordance with its terns and
conditions and pay to City all damages that are due under the Contract.
3. This bond is subject to claims under ORS 279C.600 through 279C 620
4. This obligation and severally binds Contractor and Surety and their respective heirs executors
administrators, successors.
5. Surety waives notice of modification of the Contract or extension of the Contract time.
6. Nonpayment of the bond premium shall not invalidate this bond.
7. The bond number and the name, address. and telephone number of the agent authorized to receive
notices concerning this bond are as follows:
Bond Number: 71341492
Bond Agent: Barbara Pinkham - Beecher Carlson Insurance Agency, LLC
Address: 707 Murphy Road
Medford, OR 97504
Telephone: 541-772-1111
SIGNED this 31st day of October 2012.
PAYMENT BOND Pave 2
WITNESS:
CONTRACTOR: Cu B ak 'fist 'on
By: ~l
(Corporate Seal) Title:
Legal Address: PO Box 1455
Medford, OR 97501-0108
Attest: (~Qp NyS tom,
Corporate Sc6r6tary
WITNESS: SURETY: Western Surety Company
(Corporate Seal) By' - ~11 LUusan Wilson
Title: Attorney-in-fact
tLegal Address: 12909 SW 6 t Parkway, Suite 200
RI d, O 3
Art st:
Attorney-in-fact Barbara Pinkham
Western Surety Company
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT
Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation
having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and zeal herein affixed hereby
make, constitute and appoint
Barbara Pinkham, Pam Breazeale, Cathy Damstra-Lepley, Susan Wilson, Individually
of Medford, OR, its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said
Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof, duly adopted, as indicated, by
the shareholders of the corporation.
In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Senior Vice President and its corporate seal to
be hereto affixed on this I I th day of July, 2011.
WESTERN SURETY COMPANY
+,~Errc
. :°fsaogq~s
z
a3LJ`SCAy p
.01
Paul . Bmfiat, Senior Vice President
State of South Dakota
Courtly of M ss
innehaha
On this 1 Ith day of July, 2011, before me personally came Paul T. BruBat, to me known, who, being by me duly swom, did depose and say: that he
resides in the City of Sioux Falls, State of South Dakota; that he is the Senior Vice President of WESTERN SURETY COMPANY described in and which
executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so
affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and
acknowledges same to be the act and deed of said corporation.
My commission expires°~~•~~•~••++•~••.•••~r++♦
D. KRELL +
November 30, 2012 i SEAL ROTARY PUBLIC eAS
+ SOUTH DAKOTA +
~44h444iSh4h44h4h4\\\49~~
ALA
D. Krell, NO.Try Public
CERTIFICATE
I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in -
force, and further certify that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed
my name and affixed the seal of the said corporation this--Z(,5 day of
ytREry WESTERN SURETY COMPANY
'Wioo i^~i
z
°;if\SE Ate~ 1
Q N DnK
,%~a ~4 'q-Z
L. Nelson, Assistant Secretary
Form F4280-09-06
Authorizing By-Law
ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY
This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders
of the Company.
Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other
officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer
may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.
The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the
corporation. The signature of any such officer and the corporate seal may be printed by facsimile.
Y)
'NCO CERTIFICATE OF LIABILITY INSURANCE 1.0/29/ 20 MS203.1
2
~ 0/2
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the pollcy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder In lieu of such endorsement(s).
PRODUCER COCONTACT NE, Susan Wilson, AAI, AIC
Beecher Carlson Insurance Agency LLC PHOr~ 541)772-1111 A/C No: (541)772-3785
707 Murphy Rd .susan. wil son@beechercarl son. cm
INSURER(S)AFFORDING COVERAGE NAIC
Medford OR 97504 INSURERA American Hallmark ins Co of TX 3494
INSURED INSURER B :SAIF 2412
Cut N Break Construction Inc INSURERC:$featern Suret n
P O Box 1455 INSURERD:
NSURER E
Medford OR 97501-0108 INSA RF:
COVERAGES CERTIFICATE NUMBER:CL1241214470 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAYHAVE BEEN REDUCED BY PAID CLAIMS.
ILTRR TYPE OF INSURANCE POLICY NUMBER MMIINIYEFF MMIID NYY LIMITS imma GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
X COMMERCIAL GENERAL LIABILITY PREMISES (Es occurrence) E 100, 000
A CWMS-0MADE Ex-JOCCUR X 4CL44930205 /13/2012 /13/2013 MED EXP(My one person) It 5,000
PERSONAL B ADV INJURY $ 1,000,000
GENER AGGREGATE $ 2,000,000
GENL AGGREGATE LMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000
X POLICY PRO LOC $
AUTOMOBILE LIABILITY COMBINED SINGLE 1,000,000
A X ANY AUTO BODILY NJURY (Per person) $
ALL ONNED SCHEDULED 4CL44930205 /13/2012 /13/2013 BODILY NJURY(Per aaidert) $
AUTOS AUTOS
HIRED AUTOS NON-ONNED PROPERTY DAMAGE V15 AUTOS Per ecd dent
Metliral myrnents UMBRELLA LIAB OCCUR EA
CH OCCURRENCE EXCESSUAB CLAIM&MADE AGGREGATE DED b B WORKERSCOMPENSATON NC STATU- OTHAND EMPLOYERS' LVIBILITY
LMT
ANY PROPME$OR,PARTNERIEXEO.ITIIE N
Y/N ELEACH ACCIDENT OFFICERIMEMBER EXCLUDED? /A 89003 0/1/2012 0/1/2013
(Mandatory in NH) EL.DISEASE-EA EMPLOYE II yes, tlesuiDe uW r
DESCRIPTION OF OPERATIONS Debw E.L.DISEASE-POUCYLMIT $ 500,000
C BOLI Bond (Statutory) 0106243 /5/2012 /5/2013 Lime $30,000
DESCRIPTION OF OPERATIONS 1 LOCATIONS I VEHICLES (AWCh ACORD 101, Addttbnal Remsdos Scmeddo, If more apace la requlred)
Re: Project - N Main Sidewalk Repair. General Liability policy includes Blanket Additional Insured
coverage as required by written contract per endorsement MP9538 (03/05) attached.
CERTIFICATE HOLDER CANCELLATION
(S41)400-S320 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Ashland ACCORDANCE WITH THE POLICY PROVISIONS.
90 N Mountain Avenue
Ashland, OR 97520 ALMHOMZED REPRESENTATIVE
S Wilson, AAI, AIC/SU t, •
ACORD 25 (2010105) @ 1888.2010 ACORD CORPORATION. All rights reserved.
INS025 (201005).01 The ACORD name and logo are registered marks of ACORD
POLICY NUMBER: COMMERCIAL GENERAL LIABILITY
THIS,ENDORSEMENT CHANGES THE'POLICY. PLEASE READ IT CAREFULLY.
BLANKET'ADDITIONAL.INSURED ENDORSEMENT
This endorsement modifies the insurance provided under-the following:
COMMERCIAL GENERAL LIABILITY COVERAGE FORM
A. SECTION II - WHO IS AN INSURED is amended to include as an Insured any person or,organization
(referred to below. as Ad_ ditiunal)nsured) whom yuu are ieyuiied lu addas an additional Insured on this
policy under:
1. A written contract or agreement; and
WhereA certificate of,Insurance.showing.that person. or organization as an additional insured has
been.issued;and
3. When the written contract or agreement and the certificate of insurance are currently in effect or
becoming in effect during the term of the policy and executed prior to the "bodily injury," "properly
damage" •or"personal and advertising injury."
M The insurance.provided to,the Additional Insured(s) is limited asfollows:
1;; The Additiunallnsured(s)'is:unly an addirmfial.insured for:
a. "Bodily injury," "property damage" or "personal and advertising injury" caused in whole or in part
by negligent acts or omissions;of the, Narridd'Insured or anyone directly or indirectly employed
bythe Named Insured or for whose bets e.Named'Insured maybe:liable.,
b. Liability arising out of yotir ongoing operations for the>Additional Insured(s) by or for you.. A
person's or organization's status as an insured under this endorsement ends when your
nparations forthat insured are.cornpleted'.
2:, The Limits of'lnsurance applicable to the Additional Insured(s) are those specified in the written
contract or agreement but hot more than the Limits of insurance specified in the Declarations of this
policy. The Limits.of Insurance applicable to the.Additional insured(s) are inclusive of and not in
addition to the Limits of Insurance shown in'the Declarations for the'Named;lnsured.
C. In addition to the other exclusions applicableto'Coverages A, B; and C "the insurance provided to the
Additional nsured(s);does notapplyto:
1. "'Propertyi damage" to:
ai. Property owned; used poccupied:by; loaned or rented to the Additional Insured(s);
;h. Property in the care, custody.or control of the Additional insured(s) or over which the Additional
Insured(s) are for any purpose'exercising,physical,control; or
-c. "Your work" performed for the Additional lnsured(s).
X "Bodily injury," "proportyr&mogo"or "personal and advertising injury" -easing 'out of an architect's,
engineer's or surveyor's, rendering orfAlure to.render any professional services for"you,.for the
Additional'Insure'd(s) or for others; including, but not limited to:
a.. The prepanng, approving or failure to prepare or,approye maps; drawings, opinions, reports, 11 . surveys; change orders, designsor speoifications;;or
b Supervisory, inspection or'engineering services.
3. "Bodil
y.inf'u " ry";or"property"damage" occurring after:
a. All work, including''matedals,'paits or equipment furnished in connection with such work; on the
project (other than service, r aintenance•,or repairs) to be performed by or on behalf of the
additional insured(s) at:thesite 'of the covered:operations has haancompleted: or
b;.; 'That portion of your work' out of whichihe injuryor damage arises has been put to its intended
use by any person or, organization other than another-contractor or subcontractor engaged in
;performing operationsifor;a.principal'as a[partof.the same.prolect:.
MP 95 38:03.05 Includes copyrighted. material of Insurance Seryloes Ofti6e,'Inc, with Its, i riissiori. Page 1 of 1
'w CITY RGt„iORL✓`R Page 111
~ . C I T Y OF
ASHLAND DATE PO NUMBER
20 E MAIN ST. 11/28/2012 11311
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 004823 SHIP TO: Ashland Public Works
CUT N' BREAK CONSTRUCTION INC. (541) 488-5587
P O BOX 1455 51 WINBURN WAY
MEDFORD, OR 97501 ASHLAND, OR 97520
FOB Point: Req. No.:`
Terms: Net Dept.:
Req. Del. Date: Contact: Morgan Wayman
Special Inst: confirming? No
Quantity Unit Description Unit Price Ext. Price
This work is being performed to make 60,406.00
structural repairs needed to the public
sidewalk along the north side of the N.
Main Street Bridge at Blue Bird Park
near the intersection of N. Main and
Water Streets. (See attached proposal)
Public Improvement Contract
Effective date: 10/31/2012
Completion date: 12/15/2012
SUBTOTAL 60 406.00'
31LL TO: Account Payable TAX 0.00'
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 60,406.00
ASHLAND, OR 97520
Account Number Project Number Amount Account Number . Project Number - Amount
E 260.08.12.00.70420 E 201202.999 60,406.00
u~
r 2,, 12
Author' d Signat re VENDOR COPY
FORM 93 CITY OF
A request for a Purchase Order ASHLAND
REQUISITION Date of request: 11/16/2012
Required date for delivery: ASAP
Vendor Name ('nt N Rreak ('onctmction
Address, City, State, Zip 519-B North Front Street, Medford, OR 97501
Contact Name & Telephone Number John Lawton, 541-779-1482
Fax Number 541-772-1913
SOURCING METHOD
❑ Exempt from Competitive Bidding ❑ Ememency
❑ Reason for exemption: ❑ Invitation to Bid (Copies on file) ❑ Form #13, Written findings and Authorization
❑ AMC 2.50 Date approved by Council: ❑ Written quote or proposal attached
❑ Written quote or proposal attached
❑ Small Procurement Cooperative Procurement
Less than $5.000 ❑ Request for Proposal (Copies on file) ❑ State of Oregon
❑ Direct Award Dale approved by Council: Contract #
❑ VerbalMdRen quote(s) or proposal(s) ❑ State of Washington
Intermediate Procurement ❑ Sole Source Contract#
GOODS & SERVICES ❑ Applicable Form (#5,6, 7 or 8) ❑ Other government agency contract
$5,000 to $100.000. ❑ Written quote or proposal attached Agency
® (3) Written quotes attached "(5 quotes ❑ Form #4, Personal Services $51K to $75K Contract #
requested; only 1 received from Cut'N Break) ❑ Special Procurement Intergovernmental Agreement
PERSONAL SERVICES ❑ Form #9, Request for Approval ❑ Agency
$5,000 to $75,000 ❑ Written quote or proposal attached Date original contract approved by Council:
❑ Less than $35,000, by direct appointment Date approved by Council: (Dale)
❑ (3) Written proposals attached Valid until: (Date) -
❑ Form #4, Personal Services $51K to $75K
Description of SERVICES Total Cost
This work is being performed to make structural repairs needed to the public sidewalk along the
north side of the N. Main Street Bridge at Blue Bird Park near the intersection of N. Main and $60,406 00
Water Streets. See attached Proposal)
Item # Quantity Unit Description of MATERIALS Unit Price Total Cost
:TOTAL.COST
❑ Per attached quotelproposal ;$110;406 00
Project Number 2012.02 Account Number 260.08.12.00.704200
'Expenditure must be charged to the appropriate account numbers for the financials to accurately reflect the actual expenditures.
IT Director in collaboration with department to approve all hardware and software purchases:
ITDirector Date Support -Yes/No
7BByy si ning this requisflion f fn, I certify that the City's public contracting require a tsh ve been sah.sfi Ld~
Employee Sign
ature: "V' t Department Head Signature: $5,000)
Additional signatures (i app cable):
Funds appropriated for current fiscal year gE / NO N 11/2 y/jam/Z-
Finance Director- (Equal to orgreat ran $5,000) Date
Comments:
Form #3 - Requisition
_ CITY OF
FORM #12 ASHLAND
REQUEST FOR BUDGET REVIEW
To: Lee Tuneberg, Finance Director
From: Mike Faught, Public Works Director
Date: November 16, 2012
Re: Request for Budget Review to Verify Adequate Funds Available
In accordance with AMC 2.50.080(A) for Formal Processes, the Finance Director must sign off that there are appropriate funds
for the project before the project is put out for bids. (Note: The department is to request by memo a budget review to the
Finance Director to ensure adequate funds are available prior to releasing the Invitation to Bid (ITB) or Request for Proposal
(RFP). If the amount of the successful bid or proposal exceeds the initial amount approved as a result of the budget review, the
department is to request by memo another budget review to ensure adequate funds are available for the additional amount prior
to the department requesting approval from the City Council to award and execute the intended public contract.)
REQUEST FOR BUDGET REVIEW PRIOR TO RELEASE OF ITB OR RFP:
Project name and number: N. Main Street"Sidewalk Repair; PWE #2012-02
Description of project: Repair failing sidewalk structural supports on the northeast side of N. Main
Street from Water Street to the Thai Pepper restaurant.
Amount budgeted: $100,000.
Account Number: 260.08.12.00.704200
Timeline of intended project: Preliminary construction activities started November 12, 2012. Project to
be completed by January 1st , 2013
at
Funds appropriated for current fiscal year: 'E/ NO
Department Head ;
/J✓(
Finance Director Date
Date
REQUEST FOR BUDGET REVIEW UPON CONTRACT AWARD IF ACTUAL
BID/PROPOSAL EXCEEDS THE INITIAL AMOUNT APPROVED ABOVE PRIOR TO
RELEASING ITB OR RFP: ~ V
~ n SS
Actual amount of bidlproposal: btO $60,406.00
J
L9 int" ~~a(r- o, Funds appropriated for current fiscal year: YES / NO
Deparmtent Head'
p I ~fZ Finance Director Date
Date
Form #12 - Request for Budget Review to Verify Adequate Funds Available, Page 1 of 1, 11/16/2012