Loading...
HomeMy WebLinkAbout1999-41 Water FeesRESOLUTION NO. 99- tlt'/ A RESOLUTION ADOPTING WATER CONNECTION FEES AND WATER USE FEES PURSUANT TO SECTION 14.04.030 OF THE ASHLAND MUNICIPAL CODE AND REPEALING RESOLUTIONS 97-23. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. The "Water Rate Schedule" marked Exhibit "A" and attached to this Resolution is adopted as the water rates for use and sale of water inside and outside the City limits from the municipal water system. SECTION 2. The "Water Connection Fee Schedule" marked Exhibit "B" and attached to this Resolution is adopted as the rates for water service and connection fees from the municipal water system. SECTION 3. The Water Rate Schedule adopted on Exhibit "A" shall be increased to account for inflation annually on January 1 st, based on the Consumers Price Index - All Urban Consumer Portland Index (CPI-U) July to July, provided that no other increases were implemented within the last twelve months. The City Administrator will provide the City Council with a review of the rate structure every four years. SECTION 4. The Water Connection Fee Schedule adopted on Exhibit "B" shall be increased to account for inflation annually on July 1 st, based on the Engineering News Record Construction Cost Index (ENR Index) for Seattle, Washington. The current index is established at 6006 (May 99), provided that no other increases were implemented within the last twelve months. SECTION 5. Fifty percent of the water connections fees established herein for the development of qualified affordable housing under the City's affordable housing laws, shall be deferred until the transfer of ownership to an ineligible buyer occurs. The deferred fees shall be secured by a second mortgage acceptable to the City bearing interest at not less than five percent per annum. Accrued interest and principal shall be due on the sale to an ineligible buyer. SECTION 6. One copy of this Resolution and Exhibit "A" and "B" shall be maintained in the office of the City Recorder and shall be available for public inspection during regular business hours. SECTION 7. This resolution is effective August 1, 1999. SECTION 8. Resolution 97-23 is repealed on the effective date of this Resolution. \\FS i\SYS\USER\PAULA\COUNCILXAugust 99 reso and memo.doc 4 SECTION 9. The fees and charges listed on the attached exhibits are classified as not subject to the limits of Section 11 b of Article XI of the Oregon Constitution (Ballot Measure No. 5). This resolution was read by title only in accordance with Ashland Municipal Code §2.04.090 duly PASSED and ADOPTED this ~' day of Barbara Christensen, City Recorder SIGNED and APPROVED this 7 day of Paul Nolte, City Attorney ,1999. 1999. ~Ca~e~r~Shaw, Mayor \\FS I\SYS\USER\PAULA\COUNCILXAugust 99 reso and memo.doc 5 CITY OF ASHLAND, OREGON EXHIBIT "A" WATER RATE SCHEDULE RESOLUTION NO. 99- ADOPTED JULY 6, 1999 EFFECTIVE DATE AUGUST 1, 1999 ANNOTATED TO SHOW CHANGES. DELETION8 ARE LINED TMROUGN AND ADDITIONS ARE SHADED, METERED SERVICE All water service provided by the City of Ashland will be in accordance with Chapter 14.04 of the Ashland Municipal Code. 1. WATER RATES WITHIN THE CITY LIMITS A. MONTHLY SERVICE CHARGE: The basic service charge applies to all metered water services and does not include any water consumption. 0.75 Inch Meter $ 8.30/month $ :8.63/month 1 Inch Meter $ 16.60/month $17.26/month 1.5 Inch Meter $ 23.65/month $24.60/m0nth 2 Inch Meter $ 31.15/month $32.40/month 3 Inch Meter $ 62.25/month $67.74/month 4 Inch Meter $ 99.60/month $103.58/month 6 Inch Meter $186.75/month $194,22/month 8 Inch Meter $ 311.25/month $323.70/month B. WATER QUANTITY CHARGE: All customers will be charged the following rates per cubic feet of water used. Single Family Residential Consumption 0 to 300 cfper month 300 tol000 cfper month 1000 to 2500 cfper month Over 2500 cfper month $0.96/ccf $1200/ccf $1.17/ccf $1.22/ccf $1.53/ccf $1i.59/ccf $1.9]/ccf $2.02/cef Multi-Family Residential Consumption 0 to 300 cfper month 300 to 1000 cfper month 1000 to 2500 cfper month Over 2500 cfper month $0.96/ccf $ 1.00/ccf $1.17/ccf $1.22/ccf $1.53/ccf $1.59/ccf $1.9]/ccf $2.02/ccf Non-Residential Consumption 0 to 50,000 cfper month Over 50,000 cfper month $1.32/ccf $1.37/ccf $1.37/ccf $1.42/ccf Exhibit A - Page 1 effective August 1, 1999 EXHIBIT A-2 C. TID IRRIGATION WATER RATES: Unmetered Service $52.59 .$55.64/acre or portion of an acre. Metered Service Base Service Charge Same as A, above Water Consumption $ .21/ccf $0.22/ccf D. BULK WATER RATE: For water provided on a temporary basis through a bulk meter on a fire hydrant the following charges apply: Deposit* e,~ < nn $744 00 Basic Fee $90.00/installation $94.00/installation Cost of Water Same as Commercial * Deposit is refundable less basic fee, cost of water, and any damage to the City meter, valve, wrench and/or hydrant. E. FIRE PROTECTION SERVICE WATER RATE: This rate shall apply to all fire protection services or fire guards. The basic service charge will be equal to the minimum basic service charge. Water will be billed at commercial rates. RATES OUTSIDE THE CITY LIMITS All rates and charges for water service provided outside the City limits will be 1.5 times the rates for water service provided within the City limits. Exhibit A - Page 2 effective August 1, 1999 B. C. D E. F. G. CITY OF ASHLAND, OREGON EXHIBIT "B" WATER RATE SCHEDULE RESOLUTION NO. 99- ADOPTED JULY 6, 1999 EFFECTIVE DATE AUGUST 1, 1999 ANNOTATED TO SHOW CHANGES, DELETION8 ARE LINED THROUGH AND ADDITIONS Effective July 1999 $1,075.00 ""')l::;fl rlrl 1,226.00 1,688.00 1,846.00 Actual Cost Rrl rlr~lt,4- ~.~,,, No Chargo 3/4 inch service connection from main line including meter 1. If owner/builder/contractor provides trench and backfill I inch service connection from main line including meter 1. If owner/builder/contractor provides trench and backfill 1-1/2 inch service connection from main line including meter 1. If owner/builder/contractor provides trench and backfill 2 inch service connection from main line including meter 1. If owner/builder/contractor provide trench and backfill 3 inch or larger service connection from main line 8 inch and one Fire Hydrant per 335 feet First utility locate at an address Additional locates at same address Other water related fees Water meter re-read Once in 12 months Each additional re-read in 12 months Water Meter Field Test Water Meter Bench Test: 3/4" or 1" Water Meter 1.5" or 2" Water Meter Larger meters billed No Chargo 33.90 Actual Cost Water line pressure check once in 12 months Each additional pressure check in 12 months Install Customer 3/4" hand valve Install Customer 1" hand valve No Chargo · 37 t~t~ ~ ~t~ (3~ t~t~ ARE SHADED, Effective August 1, 1999 $1,095.00 255.00 1,250.00 343.00 1719.00 722.00 1880.00 940.00 Actual Cost 51.00/ft No Charge 46.00 No Charge 22.00 33.00 70.00 126.00 Actual Cost No Charge 27.00 86.00 98.00 Exhibit B- Page 1 effective August 1, 1999