Loading...
HomeMy WebLinkAbout1994-19 Revised Electric RatesR SOLeTZO 4-/9 A RESOLUTION REVISING RATES FOR ELECTRIC SERVICE CONNECTIONS PURSUANT TO ASHLAND MUNICIPAL CODE SECTION 14.16.030 AND OTHER MISCELLANEOUS FEES AND AMENDING SCHEDULE 90 OF RESOLUTION NO. 93-23. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. The attached Schedule 90 is adopted as the schedule of fees for electric service connections and miscellaneous fees within the City of Ashland effective April 6, 1994. SECTION 2. Three copies of this resolution shall be maintained in the Office of the City Recorder. SECTION 3. Classification of the fee. The fee specified in Section 1 of this resolution is classified as not subject to the limits of Section llb of Article XI of the Oregon Constitution (Ballot Measure 5). The foregoing resolution was READ BY TITLE ONLY and DULY ADOPTED at a regular meeting of the City Council of the City of Ashland on the 5th day of April, 1994. Nan E. Franklin, City Recorder SIGNED and APPROVED this ~' day of April, 1994. Reviewed as to form: aul Nolte, City Attorney ScheduleiNo. 90-2 CITY OF ASHLAND, OREGON SCHEDULE 90 CHARGES AS DEFINED BY CUSTOMER ACCOUNTING POLICIES AND ELECTRIC SYSTEM REGULATIONS PURPOSE: The purpose of this schedule is to list the charges referred to in the utility Customer Accounting Policies and the Electric System Regulations, These charges are applicable to all customers utilizing services of the City as defined in said policies and regulations, BILLING AND CHARGES A, Temporary Service Drop: Service Drop and Meter Only - Single Phase , Three Phase $ 95,00 $195,00 Meter Charqes Meter Test for Accuracy Once in twelve months , Second or more times in twelve months , Meter Repairs/Replacement (Damage by Customer) · No charge $ 5O,OO Actual Cost C, Returned Check Charqe ..... $ 20. oo Reconnection Charge Normal Working Hours Other Hours or on Holidays , $ 16,00 $ 55,00 Service calls (Customer Request) Normal Working Hours , Other Hours or on Holidays , 16,00 55.00 Service Connection for Applicant Norma~.Working Hours ........ Other Hours or on Holidays , $ 16,00 ..... $ 55,00 G, Unauthorized Reconnection (by Customer) $150,00 Effective April 6, 1994 SchedUle No. 90-3 CITY OF ASHLAND, OREGON SCHEDULE 90 CHARGES AS DEFINED BY CUSTOMER ACCOUNTING POLICIES AND ELECTRIC SYSTEM REGULATIONS Line Extension Charges The electric line extension charges for new or increased services within the City shall be as follows for 200 amps or less: Single-family Residential Service: The electrical service connection charges for new service within the city limits shall be as follows: Overhead service in existing developed areas from distribution line to and including meter $300.00 Overhead service extension or increased service for 200 amps or less $200.00 Partial Underground service installation, extension, increased service for 200 amps or less, or replacement of service from overhead to underground. Customer provides all trenching, backfilling and compaction as directed by the City . $350.00 Underqround service of 200 amps or less that have not been previously paid under subsection I. Customer provides all trenching, backfilling and compaction as directed by the City . $300.00 Nothing herein shall be construed as requiring the City to furnish underground service in existing residential subdivisions or areas, or to require the conversion of overhead to underground service. Any service over 200 amps shall be installed at the City's actual cost with the deposit to be made to the City before installation and the City's estimate of its actual cost. Effective April 6, 1994 schedule No. 90-4 CITY OF ASHLAND. OREGON SCHEDULE 90 CHARGES AS DEFINED BY CUSTOMER ACCOUNTING POLICIES AND ELECTRIC SYSTEM REGULATIONS Line 3. Extension Charges (Continued) Commercial. Institutional and Industrial Service: The electric service connection charges for new service for commercial, institutional and industrial developments within the City limits shall be deposited with the City prior to service installation, and may include: three cutouts for primary lines, conduit and wire from lines to transformer pad, transformer pad, transformer, connectors for primary and secondary wireS, conduit and wire from transformer to current transformer cans, current transformer can, current transformers for metering purposes, meter can, meter, and all estimated labor and equipment rental costs associated with the installation of the foregoing. The trenching and backfilling for conduit shall be the responsibility of the owner or developer. Upon completion of the service connection, the City will render a statement of actual costs incurred and shall refund any excess of the deposit over actual costs. Underground Distribution Installation Charqes The charge for installation of underground distribution facilities for residential use, which includes transformers, conduit, wire for distribution, and labor and equipment charges, but not including the service connections outlined in #1d above. Customer provides all trenching, backfilling, and compaction as directed by City $650.00 per lot [Note: For any subdivision for which electric fees were paid prior to the adoption of this Resolution, a separate line extension charge as outlined in #1d above shall not be required.] Effective April 6, 1994