HomeMy WebLinkAbout1994-19 Revised Electric RatesR SOLeTZO 4-/9
A RESOLUTION REVISING RATES FOR ELECTRIC SERVICE
CONNECTIONS PURSUANT TO ASHLAND MUNICIPAL CODE SECTION
14.16.030 AND OTHER MISCELLANEOUS FEES AND AMENDING
SCHEDULE 90 OF RESOLUTION NO. 93-23.
THE CITY OF ASHLAND RESOLVES AS FOLLOWS:
SECTION 1. The attached Schedule 90 is adopted as the schedule
of fees for electric service connections and miscellaneous fees
within the City of Ashland effective April 6, 1994.
SECTION 2. Three copies of this resolution shall be maintained
in the Office of the City Recorder.
SECTION 3. Classification of the fee. The fee specified in
Section 1 of this resolution is classified as not subject to the
limits of Section llb of Article XI of the Oregon Constitution
(Ballot Measure 5).
The foregoing resolution was READ BY TITLE ONLY and DULY ADOPTED
at a regular meeting of the City Council of the City of Ashland
on the 5th day of April, 1994.
Nan E. Franklin, City Recorder
SIGNED and APPROVED this ~' day of April, 1994.
Reviewed as to form:
aul Nolte, City Attorney
ScheduleiNo. 90-2
CITY OF ASHLAND, OREGON
SCHEDULE 90
CHARGES AS DEFINED BY CUSTOMER ACCOUNTING
POLICIES AND ELECTRIC SYSTEM REGULATIONS
PURPOSE: The purpose of this schedule is to list the charges
referred to in the utility Customer Accounting Policies and the
Electric System Regulations, These charges are applicable to all
customers utilizing services of the City as defined in said
policies and regulations,
BILLING AND CHARGES
A, Temporary Service Drop:
Service Drop and Meter Only - Single Phase ,
Three Phase
$ 95,00
$195,00
Meter Charqes
Meter Test for Accuracy Once in twelve months ,
Second or more times in twelve months ,
Meter Repairs/Replacement
(Damage by Customer)
· No charge
$ 5O,OO
Actual Cost
C, Returned Check Charqe
..... $ 20. oo
Reconnection Charge
Normal Working Hours
Other Hours or on Holidays ,
$ 16,00
$ 55,00
Service calls (Customer Request)
Normal Working Hours ,
Other Hours or on Holidays ,
16,00
55.00
Service Connection for Applicant
Norma~.Working Hours ........
Other Hours or on Holidays ,
$ 16,00
..... $ 55,00
G, Unauthorized Reconnection (by Customer)
$150,00
Effective April 6, 1994
SchedUle No. 90-3
CITY OF ASHLAND, OREGON
SCHEDULE 90
CHARGES AS DEFINED BY CUSTOMER ACCOUNTING
POLICIES AND ELECTRIC SYSTEM REGULATIONS
Line Extension Charges
The electric line extension charges for new or increased
services within the City shall be as follows for 200 amps or
less:
Single-family Residential Service: The electrical
service connection charges for new service within the
city limits shall be as follows:
Overhead service in existing
developed areas from distribution
line to and including meter
$300.00
Overhead service extension or
increased service for 200 amps
or less
$200.00
Partial Underground service
installation, extension, increased
service for 200 amps or less, or
replacement of service from
overhead to underground. Customer
provides all trenching, backfilling
and compaction as directed by the City .
$350.00
Underqround service of 200 amps or
less that have not been previously
paid under subsection I. Customer
provides all trenching, backfilling
and compaction as directed by the City .
$300.00
Nothing herein shall be construed as requiring the City to
furnish underground service in existing residential
subdivisions or areas, or to require the conversion of
overhead to underground service.
Any service over 200 amps shall be installed at the
City's actual cost with the deposit to be made to the
City before installation and the City's estimate of its
actual cost.
Effective April 6, 1994
schedule No. 90-4
CITY OF ASHLAND. OREGON
SCHEDULE 90
CHARGES AS DEFINED BY CUSTOMER ACCOUNTING
POLICIES AND ELECTRIC SYSTEM REGULATIONS
Line
3.
Extension Charges (Continued)
Commercial. Institutional and Industrial Service: The
electric service connection charges for new service for
commercial, institutional and industrial developments
within the City limits shall be deposited with the City
prior to service installation, and may include: three
cutouts for primary lines, conduit and wire from lines
to transformer pad, transformer pad, transformer,
connectors for primary and secondary wireS, conduit and
wire from transformer to current transformer cans,
current transformer can, current transformers for
metering purposes, meter can, meter, and all estimated
labor and equipment rental costs associated with the
installation of the foregoing. The trenching and
backfilling for conduit shall be the responsibility of
the owner or developer. Upon completion of the service
connection, the City will render a statement of actual
costs incurred and shall refund any excess of the
deposit over actual costs.
Underground Distribution Installation Charqes
The charge for installation of underground
distribution facilities for residential use,
which includes transformers, conduit, wire
for distribution, and labor and equipment
charges, but not including the service
connections outlined in #1d above. Customer
provides all trenching, backfilling, and
compaction as directed by City $650.00 per lot
[Note: For any subdivision for which electric fees were paid
prior to the adoption of this Resolution, a separate line
extension charge as outlined in #1d above shall not be
required.]
Effective April 6, 1994