HomeMy WebLinkAbout2000-141 Contract & CONT Chg Orders - Versatile ConcreteCITY OF ASHLAND CONTRACT FOR PUBLIC WORKS CONSTRUCTION Contract made this I ~ day of I~.~ . ~ between the City of Ashland, ("City") and I/~,,r~t4;I.~ '" " ' . _ . C~c,-.~4~, C~,,t~ ,.c~,Contractor'). City and Contractor agree: 1. Contract Documents: This contract is made as a result of an Advertisement for Bid issued by City for the Miscellaneous Concrete Construction Project, No. 99- 19. Contractor was awarded the bid as the lowest responsible bidder. In the event of any inconsistencies in the terms of this contract, the contract documents defined in the Advertisement for Bid and Contractor's bid, this contract shall take precedence over the contract documents which shall take precedence over the bid. 2. Scope: Contractor shall begin and complete the project described in the contract documents within the time prescribed in the contract documents. The following exceptions, alterations, or modifications to the contract documents are incorporated into this contract: 3. Price & Payment: City shall pay Contractor amounts earned under the contract. All payments will be made at the times and in the manner provided in the contract documents. 4. Bond: Contractor shall, within five days after execution of the contract and prior to doing any work under the contract, furnish bond to the City of Ashland in a form and with a surety satisfactory to City in the penal sum of ~ conditioned upon the faithful performance of this contract upon the part of the Contractor. 5. Default: A default shall occur under any of the following circumstances: 5.1 If the Contractor fails to begin the work under contract within the time specified, or fails to perform the work with sufficient workers or equipment or with sufficient materials to insure the prompt completion of the project, or shall neglect or refuse to remove materials or perform anew such work as shall be rejected as defective or unsuitable, or shall discontinue the prosecution of the work. 5.2 If the Contractor shall bbcome insolvent or declared bankrupt, or commit any act of bankruptcy or insolvency, or allow any final judgment to stand against the Contractor unsatisfied for a period of forty-eight (48) hours, or shall make an assignment for the benefit of creditors. 5.3From any other cause whatsoever, shall not carry on the work in an acceptable manner. 6. Remedies: In addition to the rights and remedies to which the City may be entitled by law for the enforcement of its rights under this contract, City shall have full power and authority, without violating this contract, to take prosecution of the work from G:Dawn\Engineer\Project\99-19 Bid Award Ltr & Contract Documents.doc the Contractor, and appropriate or use any or all of the materials and equipment on the ground that may be suitable and acceptable and may cause a contract for the completion of this contract according to its terms and provisions, or use such methods as required for the completion of the contract, in any acceptable manner. All costs and charges incurred by the City together with the costs of completing the work under the contract, shall be deducted from any money due or which shall become due the Contractor. In case the expense so incurred by the City shall be less than the sum which would have been payable under the contract if it had been completed by the Contractor, then the Contractor shall be entitled to received the difference less any damages for delay to which the City may be entitled. In case such expense shall exceed the sum which would have been payable under the contract, the Contractor and the surety shall be liable and agree to and shall pay the City the amount of the excess with damages for delay of performance, if any. Prevailing Wage Rates: The Contractor shall pay a fee equal to one- tenth of one percent (0.1 percent) of price of this Contract. The fee shall be paid on or before the first progress payment or 60 days from the date work first begins on the Contract, whichever comes first. The fee is payable to the Bureau of Labor & Industries and shall be mailed or otherwise delivered to the Bureau at the following address: Bureau of Labor & Industries Wage & Hour Division Prevailing Wage Unit 800 N.E. Oregon Street #32 Por~land OR 97232 The Contractor shall fully comply with the provisions of ORS 279.348 through 279.365 pertaining to prevailing wage rates. CONTRACTOR By: ,ts: By:. CITY OF ASHLAND By: ~ Mike Freeman City Administrator Its: REVIEWED AS TO FORM: By: ~ City Attorney Date: '~'- II-o° REVIE,,,~_~.,A,S TO CONTENT: By: /'~',,,~/~7,~ Dep~rt~nent Head Date: Coding: (For City use only) G:Dawn~Engineer\Project\99-19 Bid Award Ltr & Contract Documents.doc CITY OF ASHLAND 20 E MAIN ST. .~ ASHLAND, OR 97520 ~ (541) 488-5300 VENDOR: 001079 VERSATILE CONCRETE, INC COUNTER 9/8/00 SHIP TO: Ashland Public Works (541) 488-5587 27-1/2 N MAIN STREET ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Data: Special Inst: Req. No.: Dept.: FINANCE Contact: Paula Brown - Public Works Confirming? Yes THIS IS A REVISED PURCHASE ORDER Elk's parking lot~ $12,090.60~ Handicap ramp construction $6,891.93 Repair 15 SF Sidewalk $90.00~ Repair island at Oak & Hersey $50.00 SUBTOTAL 40,347.81 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 40,347.81 E 260.08.35.00.909000 50.00 E 410.03.41.00.704200 40,047.81 E 710.08.24.00.602320 250.00 '2/"~Y~ ~~nature VENDOR COPY CITY OF ASHLAND CITY HALL ASHLAND, OREGON 97520 NOTICE OF TRANSMITTAL TO: SHERI BRUCE DATE: FINANCE PROJECT: JOB NO.: SUBJECT: MAY 16, 2000 MISC CONCRETE CONSTRUCTION 99-19 CONTRACT DOCUMENTS THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Sheri, Attached is the original contract to the Miscellaneous Concrete Project No. 99-19. Could you please file this for me. ENCLOSED UNDER SEPARATE COVER REMARKS: Thank You! COPIES TO: Department of Public Works Engineering Department By: Dawn Curt-i~_~ Title: Administ~tive Secretary O:Dawn\Engine er\l'roj e ct\NOT.doc CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER No. 2 Project: 1999 MISCELLANEOUS CONCRETE Date: August 31, 2000 Location: ELK'S PARKING LOT Project: 99-19 Contractor: VERSATILE CONCRETE You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Q, antity Unit Price Amount No. 1 SIDEWALK & HANDICAP ACCESS 1440 SF $12,090.60 INSTALLATION 2 I SITTING WALL CONSTRUCTION I 603 LF I $20,975.28 3 I HANDICAP RAMP CONSTRUCTION ILS $6,891.93 I Total this Change Order $39,957.81 Previous Change Orders $10,667.70 Revised Contract Total $163.625.50 This document shall become an amendment to the Contract and all provisions of the contract will apply. Recommended by: Approved by: Accepted by: Consultant Date G:Dawn~Engineer~Projecfi99-19 Ch Od 2 Versatile.doc PAGE 1 / 1 VENDOR: 001079 VERSATILE CONCRETE, INC, CIO COUNTER CITY OF ASHLAND 20 E MAiN ST. ASHLAND, OR 97520 (541) 488-5300 SHIP TO: Ashland Public Works (541) 488-5587 27-1/2 N MAIN STREET ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Special Inst: Req. No.: Dept.: Paula Brown - PW Contact: Paula Brown - PW Confirming? Yes Change Order No. 2 . 39,957.81 Sidewalk & handicap access installation- Sitting wall construction $20,975.28 SUBTOTAL 39,957.81 ~ILL TO: A~¢ount Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 39,957.81 ASHLAND, OR 97520 E 410.03.41.00.704200 39,957.81 VENDOR COPY CITY OF ASHLAND CITY HALL ASHLAND, OREGON 97520 NOTICE OF TRANSMITTAL TO: KARl OLSON DATE: PURCHASiNG PROJECT: JOB NO.: SUBJECT: OCTOBER 23, 2000 MISC CONCRETE PROJECT 99-19 CHANGE ORDER 3 THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Kari, Please process a PO for the amount shown on the attached change order to the 1999 Miscellaneous Concrete Project. ENCLOSED / UNDER SEPARATE COVER REMARKS: COPIES TO: Deparm~ent of Public Works Engineering Department By: Dawn Curtis Title: Administrative Secretary G:\pub-wrks~eng\dept-admin~%lGINEER\PROlECT~ 1999\99-19 Chg Od 3 NOT.doc CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER No. 3 Project: 1999 MISCELLANEOUS CONCRETE Location: ADDITIONAL WORK Contractor: VERSATILE CONCRETE Date: SEPTEMBER 28, 2000 Project: 99-19 You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Item Description Quantity Unit Amount No. Price 1 REPLACE SIDEWALK AT 850 SISKIYOU BLVD. 15SF 2 REPLACE CURB AT SERVICE CENTER 90 N. 25 LF MOUNTAIN ~ REPAIR ISLAND AT OAK & HERSEY LS INTERSECTION Total this Change Order Previous Change Orders $50,625.51 Revised Contract Total This document shall become~n amendment to/the Comract and all provisions of the contract will apply. Recommended by: ~'~,~ ,~1~/~ ~ /~b/~4~/ /7 '~ - [ ~ Date Approved by : '~l~/],ff, a,-.~ ~, q' /~ Ow'ner~ ~ f D~t~ Accepted by: Consultant Date G:Dawn\Engineer\Project\99-19 Ch Od 3Versatile.doc CITY OF ASHLAND REQUISITION Department: PUBLIC WORKS NO.: PW 272-D Vendor: VERSATILE CONCRETE C/O PAT HARNEY PO BOX 507 TALENT OR 97570-0507 Date: October 24, 2000 Requested Delivery Date: ASAP Deliver To: Via: Account No.: SEE BELOW *(Note: Please allow approximately iwo (2) weeks for delive~ on items not generally carried or stored, and approximately two (2) months on printed jobs.) Item No. Quantity Unit Description Use of Purchasing Office Only Unit Price Total Price PO No. Change Order No. 3 _ ~ Additional Work: /.5~5, Replace 15 SF of sidewalk $90.00 (410.03.41.00.704200) Replace 25 LF of curb $250.00 (710.08.24.00.602320) Repair island at Oak & Hersey $50.00 (260.08.35.00.909000) Total $390.00 Job No. 99-19 Unit No. I hereby certi~ that the above items are necessary for the operation of this department and are budgeted. ........ ' ' - Del~affmentlt[~6d or Authorized Person /-- Issued By Date Received By \\PIXEL\DATA\GOV~pub-wrks\eng~dept-admin~ENGINEER\PROJECT~1999~99-19 Ch Od 3 Req.doc