HomeMy WebLinkAbout2000-171 CONT AMND - Berry ArchitectsApril 19, 2001
City of Ashland, Oregon
Architectural Services for Hillah Building
Renovations and Additions
AMENDMENT g2 TO THE AIA-B 141 CONTRACT
Between the Owner:
The City of Ashland, Oregon
20 East Main Street
Ashland, OR 97520
For:
Civic Center and City Hall Facilities
Modify Amendment (gl) dated October 3, 2000 as follows:
And the Architect:
BERRY ARCHITECTS, PC
460 East Second Avenue
Eugene, OR 97401
Delay from December 30, 2000 to April 30, 2001; a period of 5 months.
Change in Consumer Price Index: 2.9% for latest 1 year period.
Adjustment of Lump Sum Fee for Basic Services:
Fee from Amendment (gl)
Increase for delay:
2.9% X 5 months X $166,868.00
12 months
Adjusted Fee:
$166,868.00
2,016.00
$168,884.00
Fee Breakdown:
Schematic Design Phase
Design Development Phase
Construction Documents Phase
Bidding Phase
Construction Administration Phase
Total Not To Exceed Lump Fee
15%~35%X$168,884 $59,109.00
20%-J
40% 67,554.00
5% 8,444.00
20% 33,777.00
$168,884.00
The parties agree to this amendment.
Owner
City of Ashland
20 East Main Street
Ashland, OR 97520
Date
Architect
BERRY ARCHITECTS, PC
460 East Second Avenue
Eugene, OR 97401
Date
11.2.1 and 11.2.2 of Amendment (gl)
Adjust Total Lump Sum Fee for Basic Services and Fee Breakdown for delay in notice to proceed in
accordance with 11.2.2 of Amendment (gl).
October 3, 2000
City of Ashland, Oregon
Architectural Services for Hillah Building
Renovations and Additions
AM'ENDMENT TO THE AIA.BI41 CONTRACT
Bctwccn the Owner:
The City of Ashland, Oregon
20 East Main Street
Ashland, OR 97520
And the Architect:
BERRY ARCHITECTS, PC
460 East Second Avenue
Eugene, OR 97401
For:
Civic' Center and City Hall Facilities
Note: The Contract is undated, however the signed copy in BERRY's file is stamped November
25, 1998 as date of receipt.
PROPOSAL
Scope of Architects Basic Services
Services shall be as described ia the AIA -B141 Contract, referenced above, Article 2. except as
follow~:
2.1.1
2.2.4
2.2.5
2.3.1
2.3.2
Add civil engineering services to the list of "normal" engineering services included.
Change to read: Based on the space needs assessment dated August 5, 1999 (cover
date) and revised on April 7, 2000, and the drawings, including site plan, floor plan,
and elevations dated July 14, 2000, the Architect shall continue to prepare for
approval by the Owner, Schematic Design Documents consisting of drawings and
other documents illustrating the scale and relationship of Project components.
Remaining documents include structural, mechanical, electrical, and civil.
Architectural documents axe complete.
Delete paragraph.
Add the following. Architectural documents are in progress; document.~ remaining to
be started include structural, mechanical, clcctrical, and civil.
Change to read:
The Axchltect shall submit to the Owner a preliminary estimate of Construction Cost
based on current area, volume or other unit costs.
Basis of Compensation
11.2.1 Part2
Add the following:
For the Hillah Building Renovations and Additions, the fcc for Basic Services will be
the lump sum amount as determined by using a percentage of the estimated
x ~4/2000 WED 08:32 FAX ~ GRE6 $COLES ~003/004
construction cost,ct forth below. Thc percentage is based on contract Exhibit "E"
guidelines. ~
Estimated Construction Cost
The project was originally estimated in the presentation of 6/28/99. Scheme "B"
using $115/s.f. for new construction; $70/s.f. for remodel, and $3.25/s.f. for site work. A
demolition cost of $6.00/s.f. was included in Scheme "A", but inadvertently omitted from
Scheme "B'. Applying these costs to the areas of the plans dated July 14, 2000 results in
the following revised estimate:
New Construction Addition - 7,983 s.f. @ 115 -- $918,045
Demolition Existing Interior - 6,500 s.f. @ 6 -- $ 39,030
Renovation - 6,500 s.f. @ 70 = $455,000
Site Improvements Allowance - 9,000 s.f. @ 3.25 -- $ 29~250
Total Revised Estimated Cost for 6/28/99
$1,414,295
Adjustment for Inflation
Axsume restart of design occurs before November 15, 2000. Time from original date of
estimate 6/28/99 to 11115/00 is approximately 16 V2 months, or 1.375 years.
Adjust cost for inflation:
Estimated construction cost at restart of design (11/15100) $1,414,295.00 X 1.375 years @ 3 %
compounded = $59,485.00. Estimate adjusted for inflation $1,414,295.00 + $59,485.00 --
$1,473,780.
Fee % for services described in original contract:
10.8% x $1,473,780.00 =
Add for Civil Engineering Services
(not included in original services)
$159,168.03
$7,700.03
Lump Sum Fee for Basic Services
$166,868.00
11.2.2
Fee Breakdown:
Schematic Design Phase 15%~e
Design Development Phase 20%J
Construction Documents Phase 40%
Bidding Phase 5%
Construction Administration Phase 20%
Total Not To Exceed Lump Sum Fee
35% x 166,868 = 58,404
66,747
8,343
33,374
$166,868
The fee for Basic Services is otherwise fixed unless the scope of the project or the
Architect's services are modified and agreed upon previously in writing.
Given that the fee is based on the estimated construction value at the restart of design.
Owner and Architect agree that the Lump Sum Fee shall be renegotiated if Amtdtect is
not notified to proceed prior to December 30, 2000. The basis tbr the renegotiated fee
shall be an adjustment commensurate with any change in the Consumer Price I~dex
(CPI), All Urban Consumers (CP]J.J), West.
04/2000 W~D OS:3Z FA~ ww~ GF~G 5CUL~5 ~uuq, uu4
(The Schematic and Design Development Phases have been combined because the
architectural porUon of the Schematac Design has been completed, and the Design
Development portion was virtually completed when the project was delayed; whereas
other elements of the Schematic Design and Design Devalopment, including Structural,
Mechanical Electrical and Civil, have not been completed.)
11.3-2
Additiona/Services
Add:
The following Additional Services are a part of the contract as of October 2, 2000.
Item
Not to Exceed Fee
Revised Needs Assessment
Reduced Footprint
Employee "Breakroom"
. Landscape Design
Total
$ 322.98
$1,500,00
$ 402.00
$ 3,800.00
$ 6,024.98
Note: Although the Owner will coordinate the submittal of the required planning application,
Architect agrees that the above services include providing sufficient design drawings for
submittal of the required planning application for the project. These drawings have been
provided. Minor revisions to the drawings required during the planning process shall also be
provided. Major modifications to the plans (i.e., change in design intent or number of stories
in the structure) shall be billed on a time and materials basis. The above services also include
attendance at up to two (2) public hearings related to the planning process.
Total Basic and Additional Services $172,892.98 to date.
The parties agree to this Amendment.
Owner
City of Ashland
20 East Main Street
Ashland, OR 97520
Date/ /
Architect
BERRY ARCHITECTS, PC
460 East 2ad Avenue
Eugene, OR 97401
Date
t~-~'~resident
4/"
~I'E R R Y A R C H I T E C T S
460 EAST SECOND AVENUE EUGENE, OREGON 97401 TELEPHONE (541) 485-3970 EAX (541) 485 3402
April 19, 2001
City of Ashland
Greg Scoles, City Administrator
20 East Main Street
Ashland, OR 97520
Re: Hillah Building
Dear Greg:
Marshall Balfe informs me that you have indicated we should proceed with the completion of the
Hillah design. I would appreciate your sending us a notice to proceed.
Enclosed are two copies of a proposed amendment (4/2) to our contract to adjust the fee for re-
starting the work after December 30, 2000, as described in the first amendment of October 3,
2000. In making the adjustment I assumed we would restart by May 1, 2001.
If the amendment is satisfactory, please sign and return a copy.
We are looking forward to seeing this project get underway again.
Sincerely,
IA
JRB/sh
A PROFESSIONAL
CORPORATION
ARCHITECTURE
PLANNING
INTRR~ORS
VENDOR: 000934
BERRY ARCHITECTS
460 EAST SECOND AVE
EUGENE, OR 97401
CITY OF ASHLAND
2o E MA~N ST.
ASHLAND, OR 97520
(541) 488-5300
NUMBER
SHIP TO: City of Ashland
(541) 488-6002
20 E MAIN STREET
ASHLAND, OR 97520
FOB Point: Req, No.:
Terms: Net Dept.: FINANCE
Req. Del. Date: Contact: Oreg Scoles
Special Inst: Confirming? NO
THIS ISA REVISED PURCHASE ORDER
Civic Center and Ci~ Hall Facilites~
Letter dated 10/03/2000
Modi~ Amendment (¢1)~ Dated April 2001
SUBTOTAL 174,908.98
~ILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00~
541-552-2010 TOTAL 174,908.98~
E 410.03.42.00.702100 174,908.98
(.~13~norlzed ~51gnature
VENDOR COPY
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 000934
BERRY ARCHITECTS
460 EAST SECOND AVE
EUGENE, OR 97401
I 10/5/00 I/ 01491
shin TO= City of Ashland
(541) 488-6002
20 E MAIN STREET
ASHLAND, OR 97520
FOB Point: Req, No.;
Terms: Net Dept.: FINANCE
Req. Del. Date: Contact: Greg Scoles
Special Inst: Confirming? NO
THIS IS a REVISED PURCHASE ORDER
Civic Center and City Hall Facilites~
Letter dated 10/03/2000
'Modi~ Amendment (¢1)- Bated April 2001 "~"*"'~' .....
SUbTOTaL 174,908.98
BILL TO: Account Payable fxx 0.00i
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 174,908.98
,, OR 97520
E 410.03.42.00.702100 174,908.98
1
VENDOR COPY
................. ' '~ CITY OF ASHLAND
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 000934
BERRY ARCHITECTS
460 EAST SECOND AVE
EUGENE, OR 97401
'10/5/00 ' '1 PONUMBER01491
SHIP TO: City of Ashland
(541) 488-6002
20 E MAIN STREET
ASHLAND, OR 97520
FOB Point:
Terms: Net
Reel. Del. Date:
Special Inst:
Req. No,:
Dept.: FINANCE
Contact: Greg ScoJes
Confirming? NO
I Quantity, Unit,
THIS IS A REVISED PURCHASE ORDER
Ar~htte~ ~J~e ~ ~ ~[ ~,I, · ~4~ ~t~: ~,,-'- 172,892.98
Civic Center and Ci~ Hall Facilites~
I
Letter dated 10/03/2000
SUBTOTAL 172,892.98
8ILL TO: Account Payable TAX 0,00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 172,892.98
ASHLAND, OR 97520
~,~ ~ i~ ~ilt NUmbe~: Amount
E 410.03.42.00.702100 172,892.98
VENDOR COPY