Loading...
HomeMy WebLinkAbout2003-013 Contract - Pacific Pipeline CITY OF ASHLAND CONTRACT FOR PUBLIC WORKS CONSTRUCTION Contract made this ,/o7~ day of ~,~', ;~o,5 , between the City of Ashland, ("City") and Pacific Pipeline Inb. "(Contractor"). City and Contractor agree: 1. Contract Documents: This contract is made as a result of an Advertisement for Bid issued by City for the Morton Street Storm Drain Project No. 02-23. Contractor was awarded the bid as the lowest responsible bidder. In the event of any inconsistencies in the terms of this contract, the contract documents defined in the Advertisement for Bid and Contractor's bid, this contract shall take precedence over the contract documents which shall take precedence over the bid. 2. Scope: Contractor shall begin and complete the project descril~ed in the contract documents within the time prescribed in the contract documents. The following exceptions, alterations, or modifications to the contract documents are incorporated into this contract: 3. Price & Payment: City shall pay Contractor amounts earned under the contract. All payments will be made at the times and in the manner provided in the contract documents. 4. Bond: Contractor shall, within five days after execution of the contract and prior to doing any work under the contract, furnish bond to the City of Ashland in a form and with a surety satisfactory to City in the penal sum of $,~2,199.00 conditioned upon the faithful performance of this contract upon the part of the Contractor. -- 5. Default: A default shall occur under any of the following circumStances: 5.1 If the Contractor fails to begin the work under contract within the time specified, or fails to perform the work with sufficient workers or equipment or with sufficient materials to insure the prompt completion of the project, or shall neglect or refuse to remove materials or perform anew such work as shall be rejected as defective or unsuitable, or shall discontinue the prosecution of the work. 5.2 If the Contractor shall become insolvent or declared bankrupt, or commit any act of bankruptcy or insolvency, or allow any final judgment to stand against the Contractor unsatisfied for a period of forty-eight (48) hours, or shall make an assignment for the benefit of creditors. 5.3 From any other cause whatsoever, shall not carry on the work in an acceptable manner. 6. Remedies: In addition to the rights and remedies to which the City may be entitled by law for the enforcement of its rights under this contract, City shall have full power and authority, without violating this contract, to take prosecution of the work from the Contractor, and appropriate or use any or all of the materials and equipment on the G:\pub-wrks~eng~dept-admin~ENGINEER\PROJECT~.002\02-23 Contract Documents.doc ground that may be suitable and acceptable and may cause a contract for the completion of this contract according to its terms and provisions, or use such methods as required for the completion of the contract, in any acceptable manner. AJll costs and charges incurred by the City together with the costs of completing the work Under the contract, shall be deducted from any money due or which shall become due the Contractor. In case the expense so incurred by the City shall be less than the sum which would have been payable under the contract if it had been completed by the Contractor, then the Contractor shall be entitled to received the difference less any damages for delay to which the City may be entitled. In case such expense shall exceed the sum which would have been payable under the contract, the COntractor and the surety shall be liable and agree to and shall pay the City the amount of the excess with damages for delay of performance, if any. 7. Prevailing Wage Rates:The Contractor shall pay a fee equal to one-tenth of one percent (0.1 percent) of price of this Contract. The fee shall be paid on Or before the first progress payment or 60 days from the date work first begins on the Contract, whichever comes first. The fee is payable to the Bureau of Labor & Industries and shall be mailed or otherwise delivered to the Bureau at the following address: Bureau of Labor & Industries Wage & Hour Division Prevailing Wage Unit 800 N.E. Oregon Street #32 Portland OR 97232 8. Living Wage Rates: If the amount of this contract is $15,000 or more,~ Consultant is required to comply with chapter 3.12 of the Ashland Municipal Code by paying a living wage, as defined in this chapter, to all employees performing work under th!s contract and to any subcontractor who performs 50% or more of the service work unUer this contract. Consultant is also required to post the attached notice predominan~tly in areas where it will be seen by all employees. The Contractor shall fully comply with the provisions of ORS 279.348 through 279.365 pertaining to prevailing wage rates. CONTR~C~R CITY OF ASHLAND ~ '-~~ ~//-~..,--, ,, B?ian Almquist Its: City Administrator De/g'artment Head Date: Coding: ~ - Z,&o,oB,r7.,~. (For City use only) G:\pub-wrks~eng\dept-admin\ENGINEER\PROJECT~002~02-23 Contract Documents.doc BOND # PERFORMANCE & PAYMENT BOND The undersigned Pacific Pir)eline Inc. , as r)finci~al, further ~referred to in this bond as Contractor, and DEVELOPERS SURETY '~0asI~[~,l~~erred to in this bond as Surety, are jointly and severally bound unto City of Ashland, as obligee, further referred to in this bond as City, in the sum of Seventy-two thous~and one hundred ninety-nine Dollars ($ 72,199.00 ). Contractor and City have entered into a wdtten contract dated z,//o//~ , for the following project: Morton Street Storm Drain Proi.eCl; No. 02-23. This con,tract is further referred to in this bond as the Contract and is incorporated into this bond by this reference. The conditions of this bond are: 1. If Contractor faithfully performs the Contract within the time prescribed by the Contract, and promptly makes payment to all claimants, as Idefined in ORS 279.526 through 279.542, then this obligation is null and Void; otherwise it shall remain in full force and effect. 2. If Contractor is declared by City to be in default under the Contract, the Surety shall promptly remedy the default, perform all of ContraCtor's obligations under the contract in accordance with its terms and conditions and pay to City all damages that are due under the Contract. 3. This bond is subject to claims under ORS 279.526 through 279.542. 4. This obligation jointly and severally binds Contractor and Surety and their respective heirs, executors, administrators, successors. 5. Surety waives notice of modification of the Contract or extension of the Contract time. 6. Nonpayment of the bond premium shall not invalidate this bond. G:'~oub-wfl~eng~el~-admin~=NGINEER~OROJEC'l%2002[02-23 Contract Documents.doc 7. The bond number and the name, address, and telephone num~er ofthe agent authorized to receive notices concerning this bond are a$ follows. Bond Number: Bond Agent Address: ANCHOR INSURANCE & SURETY. INC. PORTLAND, OR 97205 1201 SW 12TH AVE., SUITE 500 Telephone: (503) 224-2500 SURETY: COMPANY By: Title: VICKI L. NICHOLSON, ATTORNE'lj-IN-FACT Legal Address: FIVE CENTERPOINTE DR., SUITE 530 SIGNED this '0 j.t, day of F~b. WITNESS: CONTRACTOR: By: Title: Legal Address: (Corporate Seal) Attest: WITNESS: (Corporate Seal) Attest: 2003. \~ELINE. INC. ~ PO BOX 3085 CENTRAL POINT, OR 97502 Corporate Secretary WITNESS FOR SURETY G:\pub-wrkslengldept-admin\ENGINEER\PROJECND02\02-23 Contract Documents.doc - .... - POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO BOX 19725, IRVINE, CA 92623' (949) 263-3300 KNOW ALL MEN BY THESE PRESENTS, that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CAUFORNIA, do each severally, but not jointly, henby make, constitute and appoint: .**JoOO D. Klump, Vicki L. Nicholson, Philip O. Forker, Gloria Bruning, Richard W. Kowalski; Jennifer Keene, jointly or severally * ** as the true and lawful Attomey(s)-In-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations as sUE ties, bonds, undertakings and contracts of sunty_Ip g1vl.. and granting unto said Attorney(s)-in-Fact full power and authority to do and to perform every act n sary, nqulsite or proper to be done ia connecdoa therewltb as each of said corporations could do, but rfterving to each of said corporations full power of subs itution and nvocation, and all of the acts of said Altorney(s)-in-Fact, pursuant to these pnsents, an henby ratified and confirmed. . This Power of Attoney is aranted and Is signed by facsimile under and by authority of the following resolutions adopted by the ~pective Board of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CAUFORNIA, effective as ofNove~ber 1, 2000: RESOLVED. that the Chairman of the Board. the President and any Vice President of the corporation be, and that eac~ of them henby is, authorized to execute Powers of Attorney, qualifying the attorney(s) named In the Powers of Attorney to execute, on behalf of tbe corpora"ons, bonds, undertakings and contracts of suntyshlp; and that the Secntary or any Assistant Secntary of the corporations be, and each of them henby Is, authqrized to attest the execution of any such Power of Attorney; RESOLVED. FURTHER, that the signatures of such omcers may be amxed to any such Power of Attorney or to any certiOcate relating thento by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corpjoratlon when so amxed and In the future with respect to any bond, undertaking or contract of suretyship to which it Is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CAUIfORNIA have severally caused these presents to be signed by their respective Executive Vice President and attested by their respective Secretary this 8th day of Nov~mber, 2000. c~~ "",........."'" .."';'i AND I~:"', ,..... ~<r, .t............:.,.O~..'4I'.. ~:....;::; ....0. ,,\lOR~ ~'" 'f-:,\ i -J.. '<!I'" ~~ :"J! v OCT \~\ =It:: . :..c:- ! ::t i 10 ~ (") i \~\ 1936 Iii \~"", lOW'" ....~lil ~...., ~o".................~~ .......... ',......", * "............. """"""',, By: David H. Rhodes, Executive Vice President By' lIv~ 1M Walter A. Crowell, Secntary STATE OF CAUFORNIA ) )SS. ) COUNTY OF ORANGE On November 8, 2000, befon me, Diane J. Kawata, personally appeared David H. Rhodes and Walter A. Crowell, persSBallY known to me (or proved to me on the basis .f satisfactory evidence) to be the persons whose names an subscribed to the within Instrument and acknowledg to me that they executed the same In their authorized capacities, and that by their signatures on the Instrument the entity upon behalf of which the persons act executed the Instrument. WITNESS my hand and omcial seal. Slgnatun ~~j~ f DIANE J. KAWATA ~ p8 cow.t...11lml21 ~ :;) NOTMY PUBlIC - CALfOIUIA - ORANGE COUNTY i Mr ClIml. ElIp. _1.2002 I CERTIFICATE The undersigned, as Chief Operating Omcer of DEVELOPERS SURETY AND INDEMNITY COMPANY and I/I!DEMNITY COMPANY OF CALIFORNIA, don hereby certify that the foregoing Power of Attorney remains In full force and has not been revoked, and furt~ermore, that the provisions of the resolutions of the nspectlve Boards of Directors of said corporations set forth In the Power of Attorney, are In force as of the da.e ofthis Certificate. This Certiftcate Is executed in the City of Irvine, California, the ~ day of P it/b . Z/)() "'j (:1 ~.~ By David G. Lane, Chief OperatiDg Omcer 10-1380 (11/00) ACORD~ CERTIFICATE OF LIABILITY INSURANCI;Acf)~~ C~ DATE (MMlDDIYY) 01/23/03 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATT R OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON HE CERTIFICATE Anchor Insurance - Portland HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 1201 SW 12th Ave., Suite 500 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Portland OR 97205-2030 Phone: 503-224-2500 Fax:503-224-9830 INSURERS AFFORDING CPVERAGE INSURED INSURER A: Maryland Casualty Cc!nnpany INSURER B: SAIF Corporation Pacific p~eline, Inc. INSURER C: 3348 Old lita~ Road INSURER 0: Central Point OR 97502 I INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTf:DING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED 0 MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 1~1: TYPE OF INSURANCE POLICY NUMBER b~~k'lMMiDDfrl.Y DATE '/MMlDOIVYl LIMITS GENERAL LIABILITY EACH OCCURR NCE $1,000,000 - A X COMMERCIAL GENERAL LIABILITY SCP37485399 01/22/02 02/22/03 FIRE DAMAGE ( ny one fire) $ 100,000 I CLAIMS MADE [!] OCCUR MED EXP (Any 0 e person) $5,000 PERSONAL & A[ V INJURY $1,000,000 - GENERAL AGGF EGATE $2,000,000 - GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - CC MP/OP AGG $2,000,000 I Iil PRO- nLOC POLICY X JECT AUTOMOBILE LIABILITY COMBINED SINQLE LIMIT - $1,000,000 A X ANY AUTO SCP37485399 01/22/02 02/22/03 (Ea accident) - ALL OWNED AUTOS BODILY INJURY - $ SCHEDULED AUTOS (Per person) - X HIRED AUTOS BODILY INJURY - (Per accident) $ ~ NON-OWNED AUTOS - PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - ~ ACCIDENT $ =1 ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS LIABILITY EACH OCCURR~NCE $ ~ OCCUR D CLAIMS MADE AGGREGATE $ $ =1 DEDUCTIBLE $ RETENTION $ $ WORKERS COMPlNSATION AND X I TORY L1MllIS I IUER- B EMPLOYERS'L~LITY 926948 10/01/02 10/01/03 E.L. EACH ACCI~ENT $ 500,000 E.L. DISEASE - S\ EMPLOYEE $500,000 E.L. DISEASE - POLICY LIMIT $500,000 OTHER DESCRIPTION OF OPERATIONSILOCATIONSNEHlCLESJEXCLUSlONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS REI Project No. 02-23. The City of Ashland, its officers, employees and agents are included as Additional Insureds. Coverage is primary and non-contributory. (excludes workers' compensation) CERTIFICATE HOLDER I Y I ADDITIONAL INSURED; INSURER LETTER: CANCELLATION , CITAS-1 SHOULD ANY OF TH~ ABOVE DESCRIBED POLICIES BE'CANCELLED BEFORE THE EXPIRATION DATE THEREOF. THE ISSUING INSURER WILL I MAIL ...3.L DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THEiLEFT. L CITY OF ASHLAND i 20 E MAIN STREET ASHLAND OR 97520 r. AUTH ~7tt~P'~ I ACORD 25-8 (7/97) - ./ @ACORD CORPORATION 1988 ..,. ~ PAGE 10 PROPOSAL Mayor & City Council Ashland. Oregon The 'undersigned bidder declares that the .bidder has receiv~. read and understood all bid documents; received. read ,and understood all addeneJa; the bidder has taken no exceptions other than those clearly stated in this proposal; .he bidder will be liable for increased costs (and attorney fee~) for retaining a rePlacemEt bidder ~ the undersigned bidder is awarded the contract but refuses to sign the cont ct; the bidder has examined the plans and specifications, has visited the site, an. made such investigation as is necessary to detennine the character of the materials and conditions to be encountered in the work and that If this Proposal is accepted, ttjle bidder will contract with the City of Ashland, Oregon for the construction of ~e proposed improvement in a fonn of contract contained in the bid documents, Wi~1 provide the necessary equipment, . materials, tools. apparatus, and labor, in accordance with the plans and specifications on file at the City Engineering Officej Ashland, Oregon. under the following condffions: 1 . It is understood that all the work will be perfonned under a lump sunil or unit price basis and that for the lump sum or unit price all services, materials, labor. equipment, and all work necessary to complete the project in accordance with Die plans and sPeciflCStions shall be furnished for the saki lump sum or unit price named. It is understood that the quantities stated in conneCtion with the price sch~ule for the contract are approximate only and payment shan be made at the unit p~s named for the actual quantities incorporated in the completed work. If there shall be ~n increase in the amq_~nt of work covered by the lump sum price. it shall be computed pn a basis of -extra Work" for which an Increase in payment will have been earned and If there be a decrease in the lump sum payment, ,it shall be made only as a result of negotiation between the undersigned and ~ Owner. Furthennore, it is understood that any estimate with respect to time, materials, equipment, or se~ce which may appear on the plans or in the specifications is for the sole purpose of assisting the undersigned in checking the undersigned's own independent calCulations and that at no time shall the undersigned attempt to hold the Owner, the Engineer, or any other person, finn or corporation responsible for any errors or omissions that may appear in any estimate. 2. The undersigned will furnish the bonds required by the speclfication$ and comply with all the laws of the Federal Government, State of Oregon, and the CitY of Ashland which are pertinent to construction contracts of this nature even though $uch laws or municipaf ordinances may not have been quoted or referred to in these specifications. , , 3. All items for the contract for which fonns are provided in the bid doc~ments have been completed in full by the showing of a lump sum price or prices for each and every item and by the showing of other infonnation indicated by the proposal fonn. The undersigned submits the unit prices set forth as those at which the bidder will perfonn the work involved. The extensions in the column headed "Total" are made up for the G:'club"Mb\eng\rMpt<<fminlENGllEERlPROJEc:n2OO2'D2-23 Martan She! Slonn 0nIIn IlkI DoCument.doc PAGE11- sole purpose of facilitating comparison of bids and if there are any discrepancies between the unit prices and the totals shown, the unit prices shall govern. 4. . The undersigned agrees that the "Time of Completion" shall be as defined in the specifications and that the bidder will complete the work within the number of consecutive calendar days stated for each schedule after "Notice to Proceed" has been issued by the Owner. Bidder furthennore agrees to pay as liquidated damages, for each calendar day thereafter, the sum of two hundred fifty dollars for each day the project remains incomplete. 5. The undersigned, as bidder, acknowledges that addenda(s) numbered 1 through have been received by the bidder and have been examined as part of the contract documents. 6. The undersigned, as bidder, acknowledges that provisions of Oregon Revised Statute (O.R.S.) 279.350 relating to workers on public works to be paid not less than prevailing rate of wage shall be included in the contract. 7. Instructions for First-Tier Subcontractors Disclosure. Bidders are required to disclose information about certain first-tier subcontractors (those subcontractors contracting directly with the bidder) when the contract price exceeds $75,000 (see ORS 279.027). Specifically, when the contract amount of a first-tier subcontractor is greater than or equal to: (I) 5% of the project bid, but at least $15,000, or (ii) $500,000 regardless of the percentage, you must disclose the following information about that subcontract within four hours of bid closing: 7.1 The subcontractor's name and address; 7.2 The subcontractor's Construction Contractor Board registration number, if one is required, and; 7.3 The subcontract dollar value. If you will not be using any subcontractors that are subject to the above disclosure requirements, you are reqUired to indicate "NONE" on the form. THE CITY MAY REJECT A BID IF THE BIDDER FAILS TO SUBMIT THE DISCLOSURE FORM WITH THIS INFORMATION WITHIN FOUR HOURS OF BID CLOSING. To determine disclosure requirements, the City recommends that you disclose subcontract information for any subcontractor as follows: 1) Determine the lowest pOSSible contract price. That price will be the base bid amount less all alternate deductive bid amounts (exclusive of any options that can only be exercised after contract award). G~\eng\dept-.dmln\ENGlNEER\PROJECn200~2.23 Morton SlnIet Storm Drain lid Doeumenldoc - PAGE 12 2) Provide the required disclosure information for any first-tier subcontra~or whose potential contract services (i.e., subcontactor's base bid amount plus.1I alternate additive bid amounts, exclusive of any options that can only be exerci$ed after contract award) are greater than or equal to: (I) 5% of the lowest cont~act price, but at least $15,000, or (ii) $500,000 regardless ofthe percentage. Total all possible work for each subcontractor in making this determination (e.g., if a subcontractor will provide $15,000 worth of services on the base bid and $40,000 on an additive alternate, than the potential amount of subcontractor's services is $55,000. Assuming that $55,000 exceeds 5% of the lowest contract Rrice, provide the disclosure for both the $15,000 services and the ($40,0001 services). The disclosure should be submitted on the following form: G.~\Ing~ECT\3lO2'Q2_23 Malton Slreel Slorm DraIn BlcI Doc:umer4.doc PAGE13- City of Ashland First-Tier Subcontraetor Disclosure Form (As Required by ORS 279.027 and OAR 137-040-0017) MORTON STREET STORM DRAIN PROJECT I NAME OF SUBCONTRACTOR I I CATEGORY OF WORK 1. \(ll~ \ 2. 3 4 5 6 7 8 9 10 * Attach additional pages if needed. G:\4)ub"'llllb\eng\apl-"Ojmin~IEER\PROJEcn2OO2'm.23 Morton snet Stonn OraIn Bid Document.doc VJ.I I.IJII.VVIJ J.UU .11.. 'tV 1"l1J1. V'lJ. 'tVUVVVU VJ. 1101 VJ. n.:JuJ.OU\l VVIWlI II{;Y ItJVVI.I VVI. MORTON STREET STORM DRAIN PROJECT NO. 02-23 . _LE11123103l ITEM ES1WU.TE UNrr PRICE AIpJNT NO. ITEM (UHtT PRICE DOLLARS) UN1TS (FIGURES) 1 Mobilization and Final Cleanup for 00Ilars lump Sum , bs:s5 , ~~ Temporary protection and direction of traffic for 0'" 1>SOO 2 Lump Sum $ ~S:iJ $ Dollars 3 Saw art pavement for 1380 LF $ \0: $ \'3~ Dollars " Remove and replace pavement for Dollars 301 SY $ 3C;:: $ \d,S~S 5 48" storm drain ifor 1 EA $ \gi) $ \ SCJ.J Dollars 6 048" ft8tlop storm drain manhole for OoUars 2 EA $ \ cJ:j:)OO $ 7JCfJC 7 72" storm drain manhole for Dollars 3 EA $ ?(f:J:j $ <i1L.\CC> 8 Connect to existing 18" stann drain for 1 EA .$ ::a:)v $ ?:DO Dollars g Remove and replace curb for 00IIars 50 LF $ 720' s \\00 10 Remc:.we and replace curb inlet for 5 EA $ I~ , is:J::D DoIIats 11 Remove exISting manhole for 1 I:A $ 6JJ~ '$ 7.';)0 DoIlar& '2 Cor1Cl8Ce Cap for Dollars 100 LF $ '2StlO '$ ?~r:x:; 24"-S.0. incl. excavation & class "a' backfiII,.4'.,o' for 400 LF $ >rt!t '- $ \~ ~zoa 13 . Dollars '3..' 24" S.D. ind. ex CDF ' -6'for 95 LF $ .0 $ .!5 ~'2.D 14 Dollars .~~~~ . . 18"' S.D. incl. exca\falion & CDF -6' for 61 LF S ?fl...OO $ <3\~ '5 Dollars 12" S.D. incl. excavation & class Mal; ~. '-6' for 126 LF S -z.ctU $ '15"2.<6 1& DoBars 12" S.D. incl. excavation & COF bac~_ 'for 24 LF $ _n.C $ lln<i 17 Dollars ?:..i 18 24" 9Iorm drain plug for 1 EA $ \t'!.")tP $ \DO . Dollars 19 12" storm drain plug for Dollars 2 EA $ S) C)C s '\DO 20 -DELETED MjYd IMAMle fer -. $ - S - Dollars 21 Cement sand s1uny fill existing storm drain for LUmp Sum S Q:{JO\.J $ C(:j:) Dollars 22 Remove existing storm (tram for Lump Sum $}~{1)O~ $ 7S00 OoIIal'$ -~ 610 TOTAL $ -17 \Qq V) !)EPARTMENT OF ipUBLIC WORKS ENGINEeRING DIVISION \\COMPAQl\DA T A \COV\pub-wrk.s\eng\dept-admin\ENGINEER\PROJEC'I\lOO2\OZ-Z3 Addendum No I.doc rr PAGE 15 The City reserves the right to reject any and all bids, waive formalities, or accept any bid which appears to serve the best interests of the City. The foregoing prices shall include all labor, materials, equipment, overhead, profit, insurance, and all other incidental expenses to cover the finished work of the several kinds called for. Unit prices are to be shown in both words and figures. In case of discrepancy, the amounts shown in words will govern. Upon receipt of written notice of the acceptance of this bid, Bidder shall execute the formal contract attached within ten days and deliver surety bond or bonds as required. The bid security attached in the sum of five percent of the total price for the bid or combination of bids Is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth as liquidated damages for the delay and additional expense to the Owner caused thereby. The Bidder is X or is not 279.029. a resident Bidder as defined in O.R.S. ~QCA.-~~9!2\ \ uk{~_ . Firm Name of Bid<Jer S~~ ~.~\(\,~'-- Printed Name of idder ~~~\. Official Title ~~'rA- \.t\ tJ <6lo S State of Inco atlon CCB Number J\~ ~ Dated this ~ day of ~"-<.J. rt vu 2003. ~ ~ Name of Bidder ~~c "\"~\"'-..Q' -\"'",..--c "\ Address . ~O~ ?:'O'\,:S . ~~~\ ~~\- O\r C'\lS()~ Telephone No. 5z-\ \ -l( 0- S Y L..\ "-\ G~\eng\dept-admin\ENGlNEER\PROJECT\2002'D2-23 Morton ~ SConn DraIn llId Document.doc - ~ PAGF16 BID BOND We, the undersigned, PACIFIC PIPELINE, INC. as, Principal, and DEVELOPERS SURETY AND INDEMNITY COMPANY as Surety, are held and firmly bound to City of Ashland. Oregon as OWNER, in the penal sum of FIVE PERCENt>r ~n~~~nt of which i9intl~ and severally bind ourselves, our successors, aR8 a'SMOHs~OUNT BID (5%) ** Signed this 4TH day of FEBRUARY. 20 03. The condition of the above obligation is such that whereas the Principal has I submitted to the City of Ashland. Oregon, a certain BID, attached and made a part of this BOND, to enter into a contract in writing, for the proposal for the Morton Street Storm Drain construction. NOW, THEREFORE, (a) If this BID shall be rejected. or. (b) If this BID shall be accepted and the Principal shall execute and deliverla contract in the Form of Contract attached (properly completed. in : accordance with the BID) and furnish a BOND for the faithful performanpe of the contract, and for the payment of all persons performing labor or ! furnishing materials in connection with the contract, and shall in all respects perform the agreement created by the acceptance of the BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims under this BOND shall, in no event. exceed the penal amount of this obligation as stated. The Surety, for value received, stipulates and agrees that the obligations of the Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and the: Surety waives notice of any such extension. PAC FlIP , INC. BY: (L.S. Prin . al DEVELOPERS SURETY AND INDEMNITY COMPANY Surety By: ~~~.~ VICKI L. NICHOLSON, ATTORNEY-IN-FACT IMPORTANT - Surety companies executing BONOS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Oregon. G:\pub..a\onaldelll-..eGNeERlPROJECT\2OOM2~ Wo1on Snel SIoml Or-.in IlId ~<loC '11 , POWER OF ATIORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO BOX 19725, IRVINE, CA 92623 . (949) 263-3300 KNOW ALL MEN BY THESE PRESENTS. that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA. do each severally, but DOt Joiatly, hereby make, coastitute aad appoiat: ***John D. Klump, Vicki L. Nicholson, Philip O. Forker, Gloria Bruning, Richard W. Kowalski, Jennifer Keene, jointly or severally*** as the true and lawful Attorney(s)-In-Fact, to make, execute, deliver and admowledge, for and OR behalf of said corpontions as sureties, bonds, undertakings and contracts of suretysllip glvlag aad granting unto said Attonaey(s)-In-Fact full power alld authority to do and to perform every act necessary, requisite or proper to be done i. connec:tioa therewith as each of said corporations couid do, but men-lag to each of said corporatioDS fuU power of substitution aad revocation, and aU of the acts of said Attorney(s)-in-Fact, pursuant to these presents, are hereby ratified and confirmed. nis Power of Attorney Is cranted and Is sigIIed by facsimile u.... aad by authority of tile following resoIutiolas adopted by the respective Board of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA. effective as of November 1,2000: RESOLVED, tllat the Chairma. of the Board, the President and aay Vice Presideot of the corporatloa be, aod that each of them hereby Is, authorized to execute Powen of Attorney, qualifying the attoney(s) amed 10 the Powers of Attorney to execute, 00 behalf or the corporations, boods, uadertakiags and contra$ of suretyship; aad that the Secretary or any Assistant Secretary of the corporatlORs be, and each of them hereby Is, authorized to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such oMcers may be aMxed to any such Power of Attorney or to any certificate relatiag thereto by facsimile, aad any such Pewer or AttOl'HY or certllkate bearilll such facsimile signatures shaD be valid and binding upon the corporation whea 50 amxed and In the future with respect to aay boad, undertaking or contract of suretyship to which It Is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY aad INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective Executive Vice Prtsideat and attested by their respective Secretary this'" day of Novetnber, 2000. By: David H. Rhodes, Executive Vice President c-:) ~ ......"......<<1,; .....;'t "ND ,;:.... ""<III!IL~ ............... .,,~~.#~ .~...,.. POjJ ~... '<'.J_" IflO ....O~ .'1J'.....~\ ~ l"<.J ~.-~. i:!f OCT. \~\ i ~ ! 10 : l") i \~\ 1936 Iii f. ~ ". .... '0 i f.....,~...../oW........~ $ "~'''. q ........... "to.....,...,. ......,......t.......""~ ." //lA lM Walter A. Crowell. Secretary STATE OF CAUFORNIA ) )SS. ) COUNTY OF ORANGE Oa Non.ber I, 2000, before IDe, Dlaae J. Kawa.., persoaally appeared David H. RIIodes a.d Walter A. Crowell, personlly bown to me (or proved to me OD tbe basis or satisfactory evldeac:e) to be tbe persons whose ames are subsc:ribed to tbe within Instrumeat aad adaaowledged to .. that they executed the same in tllelr autltorized capadtles, aad that by tlaelr signatures OR the Instrumeat tlae entity upon behalf or whldl the persoas acted. executed the instrument. WITNESS my hand and oMciaJ seal. SigDature ~~j~ . _ OIAHE. J.. KAYMTA , .. (X)MM. .1187828 . :> MI1MYPUIIUC -CAl.fORfIA C - 0MfGE COUNTY ~ i My c.a&p..a" ZOOZ t CERTIFICATE The uadersiglled, as Cbief Operating Off'acer of DEVELOPERS SURE1Y AND INDEMNITY COMPANY aad INDEMNITY COMPANY OF CALIFORNIA, does hereby certify tbat the foregolne Power of Attoney remalDs 10 IUD force aod bas Dot beeD revoked, aad furthermore, that tbe provlsloas of tbe resolutions of the respective Boards of Directors of said corporatlo8s set fortb Ia the Power of Alloraey, are I. force as of the dale of tbis Certificate. This Certificate Is executed 10 the City of Irvine, Califorala, the 4 TH day of FEBRUARY 2003 C1 :t1. ~ By David G. Lane, Chief Operating Officer 10.1380 (11100) . CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 CITY RECORDER'S COPY Page 1 / 1 03959 VENDOR: 005925 PACIFIC PIPELINE INC PO BOX 3085 CENTRAL POINT, OR 97502 SHIP TO: Ashland Public Works (541) 488-5587 27-1/2 N MAIN STREET ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: 02/18/2003 Special Inst: Req. No.: Dept.: PUBLIC WORKS Contact: Paula Brown Confirming? NO THIS IS A REVISED PURCHASE ORDER Morton Street Storm Drain Project No. 02-23 ~ ~ 72,199.00, BID Date of contract: 02/10/2003 Start date: 02/18/2003 Completion date: 03/18/2003 Insurance required/On file Revised purchase order 05/09/2003 15,382.90 Change Order 1 SUBTOTAL 87,581.90 BILL TO: Account Payable TA~ 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 87,581.90 ASHLAND. OR 97520 Account Number ' Amount Account Number : Amount E 260.08.17.00.704200 70,065.52 E 260.08.34.00.704200 17,516.38 ~121thorized Signature VENDOR COPY A request for a Purchase Order REQUISTION FORM THIS IS A REQUEST FOR A: [ X ] Change Order (existing PO# 3959) CITY OF -ASHLAND Date of Request:[ 4/291031 Required Date of De very/Serv ce Vendor Name: PACIFIC PIPELINE INC. Address: PO BOX 3085 City, State, Zip CENTRAL POINT OR 97502 Phone: Project Title: MORTON STREET STORM DRAIN REPLACEMENT Project Number: 02-23 Solicitation Process: [ ] Exempt [ ] 3 Written Quotes (copies attached) ] Sole Source [ X ] Invitation to Bid (copies on file) ] Less than $5000 [ ] Request for Proposal (copies ~n file) Services Only Description Total Cost Morton Street Storm Drain Replacement Project $ 72,199.00 Odginal Contract Cost Change Order No. 1 $ '15,382.90 $ Prior Change Orders Change Order Amount $ 87,581.90' REVISED CONTRACT Account Number 260.08.17.00.704200 (85%) *Please attach the Original signed contract and Insurance Certificates. jj, Account Number 260.08.34.00.704200 (15%) Employee Signature: ~ ~",--'~,/~'"~ Supervisorl Dept. Head Signature: /~.~~ - NOTE: By signing this m~ttion form, I c~ertify tha the above request meets with Ctiy of Ashland Solicitia~ion Process requireme~s ar~'can be prowded wh' " N . ' en necessary. G:Pubwrks\Eng\deptadmin\engineer~project\02-23 CO Req No 1.xls Updated on: 7/15/02 Ma~ 05 03 10:21a Kath~ Sal~er 1-541-770-5444 p. 1 PROJECT: LOCATION: CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 1 MORTOI'! STREET STORM DRAIN DATE: APRil 29, 2003 MOF:TON STREET PROJECT NO.: 02-23 CONTRACTOR: PACIFIC PIPELINE INC. You are requested to pE'rf~:lrm the following described work upon receipt of an approved copy of this document or as described by the Engineer: _;;.t. Item No. Description Quantity Unit Price Amount CO 1 Remove CI P 55 LF $10.00 $550.00 CO-2 Construct Sidewalk 481F $7.00 $336.00 CO-3 Construct HaCi.dicap Ramp 123 SF $7.00 $861.00 CO-4 Install 4" Corduit 636 LF $1.00 $636.00 Additional Quanitites Item #3 Sawcut Pavern ent 268 LF $1.00 $268.00 Item #4 Remove & RE!place Pavement 272.84SY $35.00 $9,549.40 Item #9 Remove & REplace Curb 40 LF $22.00 $880.00 Item #12 Place Concrete Cap 40 LF $25.00 $1,000.00 Item #16 12" S.D. 55 LF $28.00 $1,540.00 Decreased Qvantities Item #21 Cement SIU/:2' Existing SO LS -25% $(237.50) Original Contract Price Total this Change Order Previous Change Order Revised Contract Total ~al~~P The time provjded fO~'completion of this contract is increased by fifteen calendar days. This document shall become an endment to t e ontract and all provisions of the contract will apply. Recommended By: +1 'W I 0 ~ Engineer Date $72,199.00 $15,382.90 $0.00 $87,581.90 Approved By: E"~~~ jo ~rt-() ~ Date Accepted By: Pcldfic Pipeline Inc. PO Box 3085 c,,~ Cc)nt actor co-~ Date ENGINEERING 20 E. Main Street Ashland, O,!!!!OIl 97520 www.ashland.or.us G:\pub-wrkslengldept-adminIEN G Ir.IEERIPROJECT\2002\02-23 Change Order No 1.doc Tel: 541-488-5347 Fax: 541-488-6006 TTY: 800.735-2900 r.t. , CITY OF ASHLAND April 29, 2003 Mr. Joe Salyer Pacific Pipeline Inc. PO Box 3085 Central Point OR 97502 RE: FINAL ACCEPTANCE OF THE MORTON STREET STORM DRAIN PROJECT NO. 02-23 Dear Joe: A final inspection has been made on the Morton Street storm drain project and it has been determined that the work has been completed in compliance with the plans and specifications. The work performed by your firm and by your sub-contractors is hereby approved and accepted. Please be reminded that under the terms of the contract the materials and workmanship on this project must be warranted against defects for a period of two years from this date. Final payment, including the release of all retained payments will be made as indicated on the enclosed final payment sheet. There are a couple of bid items which we do not agree upon. Would you please review the following items: On payment item number 10 you show six curb inlets removed and replaced. I show that five were installed as follows: @ S.E. Corner of Morton & Blaine Streets 1 @ S.W. Corner of Morton & alley 1 @ N.E. Corner of Morton & Siskiyou (base only) @ S.E. Corner of Morton & Siskiyou 1 @ S.W. Corner of Morton & Siskiyou 1 @ South side of Siskiyou, west of Morton (base only) Total 5 On payment item number 21 only a portion of the 150 foot long section of storm drain pipe was filled with slurry. Rather than return and excavate into the church parking lot to expose the pipe to complete the filling operation we can accept the work as completed at 75% payment. Engineering Tel: 541/488-5347 20 E. Main Street Fax: 541~/488-6006 Ashland, Oregon 97520 TTY: 800/735-2900 www.ashland.or, us G:~pub-wrks~ng\dept-admin\ENGINEER~PROJECT~002\02-23 Final Acceptance Ltr. doc The above two changes represent a difference of $937.50 in the total project cost of 487,581.90. Please let me know if this is acceptable to you. Also would you please sign and return the enclosed change order forms at your earliest opportunity. You may fax a copy so that I can continue processing the final payment, however, the original signed documents should be returned as quickly as possible. If you have any questions, please feel free to call at 488-5347. Sincerely, a:::!::L--- City Surveyor/ Project Manager cC: Paula Brown Roger Balbo Mike Thornton, PE Engineering 20 E. Main Street Ashland, Oregon 97520 www.ashland.or.us G:\pub-wrks\eng\dept-adrnin\ENGINEER\PRO]ECl\2002\02-23 Final Acceptance Ltr.doc Tel: 541/488-5347 Fax: 541-/488-6006 TTY: 800/735-2900 ~~, CITY OF -ASHLAND Public Works - Engineering Division Date: To: From: Re: Payment Memorandum April 29, 2003 Veronica Vlach ~/~ James H. Olson, Project Manager PAYMENT NO. 3 FOR THE MORTi~)N STREET STORM DRAIN PROJECT NO. 02-23 Pacific Pipeline Inc. has requested third progress payment for services rendered in the construction of the Morton Street Storm Drain Project No. 02-23. Please make payment as follows: Contractor: PACIFIC PIPELINE, INC. PO BOX 3085 CENTRAL POINT OR 97502 Project Title: MORTON STREET STORM DRAIN Project No.: 2002-23 Purchase Order: 03959 Account No.: 260.08.17.00.704200 260.08.34.00.704200 Retainage 5% Contract Amount: $72,199.00 Change Order: $ 15,382.90 Revised Contract: $87,581.90 85% 15% COST ALLOCATION TOTAL PAYMENTS TC CURRENT AMOUN] DFSCRIPTION COST TO DATE DATE DUE ZOSTS $ 87,581.90 $ 64,194.00 $ 23,387.90 ~,ETAINAGE $ - $ 3,209.70 $ 3,209.70 Totals $ 87,581.90 $ 60,984.30 $ 26,597.60 Please Pay: $ $ 22,607.96 260.08.17.00.704200 3,989.64 206.08.34.00.704200 Total $ 26,597.60 FINAL ALLOCATION OF FUNDS 260.08.17.00.704200 206.08.34.00.704200 Pacific Pipeline, Inc. Paula Brown CC: 850/0 $74,444.62 15% $13,137.29 $87,581.90 CONTRACT AMOUNT REMAINING % Complete $ 87,581.90 Contract Total 100.0% $ 87,581.90 - Paid to Date $0.00 Amount Remaining G:PubWorks~Eng~DeptAdmin~Engineer~Project\02-23 Pacific Pipeline Payment 3 final.xls -~ ~ "* "* ~ "* "* "* ~ "* "* "* "* "* "* "* "* "* "* "* "* "* "* "* "* ~ "* 0 0 0 0 B~ 0 0 Ol a; 0 0 0 0 ~ 0 0 0 0 0 8 Ol 0 0 0 '" 0 0 0 0 0 N 0 0 ,.... 0 0 0 0 0 0 .... 0 0 co 0 0 0 r-.. 0 0 0 0 0 ~ E ..... ..... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ,.... ..... ..... ..... ..... ..... ..... ..... ~8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '" 0 0 0 C! 0 ~ - ci ci cO ..t ci ci ci ci ci ci ci ci ci ci cO cO cO ci ci ci N ci ci cO cO c: a; .... ;:, 0 0 ~ 00 0 0 0 0 00 0 0 0 0 C\I M co Ie 0 0 ~ ..... 0 '" C') C') ClO 0 '" ~ 0 "'. 0 .... C') Ol. 10 C\I 10 C\I C') 0 ..... ;; r-.. 10 10 C') 00 co on E cD C') ,.... ci ;; N a:i ~ ;; M ~ M .c .c N .c ~ ~ ~ N ...: <( ~ ~ ~ C\I ~ ~ ~ ~ ;; ~ ~ ~ ~ ClO ~ 4It Iii ~ ~ ~ ~ ~ .2: u. >- Lli Lli <( Lli u. Lli Lli u. u. u. u. u. u. Lli <( :e "* "* ...J (/) W ...J ...J ...J ...J ...J ...J ...J W "* ~ "* "* "* ~ 0 0 ell 0 0 00 ~ ,.... C\I C') ,.... 0 10 ,.... 0 0 10 a; co .... ..... C\I 10 0 0 0 0 0 ;:, 0 0 .... Ol .... 0 Ol C\I r-.. 0 0 0 0 0 0 ..... ..... co C') ..... .... ,.... ..... ,.... ,.... ..... ..... ..... r-.. 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 :5 :5 ~ :5 0 1: 0 0 C! Ol 0 C! 0 0 0 0 0 0 0 0 0 0 0 0 0 en ci ci 00 co ci 0 ci ci ci ci ci ci ci ci ci ci ci ci ci , , g ~ CD cO ,.: C') ;:, 10 10 co co ~ ~ 4It ~ 00 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ '" ClO 0 co C') C\I ell. "t l/) '" co CD C') 0 E ~ ~ ~ -.i M z <( ..... ;; ;; ;; N 1: ~ ~ ~ ... ... ... ... 4It Q) ~ .2:- ~ >- Lli Lli Lli Lli u. Lli Lli u. u. u. u. u. u. Lli Lli u. u. u. u. (/) ...J ...J ...J ...J ...J ...J ...J ...J ...J (/) ...J ell :e ~ "* ~ "* a. 0 00 C') 0 0 0 0 0 C\I 0 0 0 0 0 10 0 0 0 0 10 00 C') co ell 0 0 0 co M Ol 10 0 0 10 .... N C') ;:, ,.... ,.... C\I ..... co 0 C\I .... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9: ell E ;:, 1: 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0 () 3: ~ -c ci ci ci ,.: ci ci ci ci ci ci ci ci cO ci cO cO cO ci ci ci N ci c: N ;:, ~ Q) 0 0 0 ~ co ~ ~ 0 ~ ~ 0 0 0 co N ,.... 00 co 0 0 ~ r: 0 -c C- u 0 0 co. "t N co ..... N o. ~ C') C') C\!. r-.. ;; ..... 10 0 0 'Cii rl z E N ..... .c .c N ~ ,.... ;; .c N ;; ~ ~ N 0 E ii <( ~ ~ ~ ~ ~ ~ 4It ~ N Q) Iii '5 .5 1: ~ ~ .... rx: Cii c: ell Q) II> , .5 J: .... ~ >- Lli Lli Lli Lli Lli Lli Lli Lli N' ~ .2:- u. u. u. u. u. u. u. u. C') ;; , ell ~ "* "* ...J (/) ...J ...J ...J ...J ...J ...J ...J "* ~ 4It N Iii ell 0 ~ Cii 0: a. ell 0 0 0 10 0 0 N 0 0 C') ..... 0 <0 10 a; co .... ..... N 10 0 .... ;:, .... .... ci .... C') Ol .... N r-.. 0 Jj ~ .5 , 0 10 ,.... , : ..... x w C') 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .... ~ 1: 0 0 0 0 0 C! 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ x ci ci ci ci ci ci 0 ci ci ci ci ci N ci ci ci ci ci ci ci , , x w ..... ;:, 10 10 00 ~ 0 0 0 0 ~ ~ ~ 0 C') ~ ~ .... ~ ~ ~ ~ w 0 N ":. ~ ~ C!- oo. C') 10 00 N 0 E M ~ N M N 0 ,.... ;; ;; N N 0 Z <( ~ ~ ~ ~ ~ ..... 4It N 1: ~ ~ ~ on Q) ~ ~ -- 0> C CIl ~~ CIl- ~~ .0", ~'E Ci ~ >. m a. .. .5 8- ii: u IE u '" a. '" N N 9 U .. '2' ~ al c '0. c ~ c 'e "0 ~ .. :9 CITY RECORDER'S COPY Page 1/1 CITY OF ASHLAND ' ~ ~",~l~-,~ '~ ASHLAND, OR 97520 I 02/19/2003I 03959 ~, (541 ) 488-5300 VENDOR: 005925 SHIP TO: Ashland Public Works PACIFIC PIPELINE INC (541) 488-5587 PO BOX 3085 27-1/2 N MAIN STREET CENTRAL POINT, OR 97502 ASHLAND, OR 97520 FOB Point: Req. No.: Terms: Net Dept.: PUBLIC WORKS Req. Del. Date: 02/18/2003 Contact: Paula Brown Special Inst: Confirming? NO BLANKET PURCHASE ORDER 02-23 BID Start date: 02/18/2003 Insurance required/On file SUI~ITOTAL 72,199.00 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST ~REIGHT 0.00 541-552-2010 TOTAL 72,199.00 ASHLAND, OR 97520 E 260.08.17.00.704200 57,759.20 E 260.08.34.00.704200 14,439.80 i ~[~Jthorized Signature VENDOR COPY MORTON STREET STORM DRAIN PROJECT NO. 02-223 CITY OF ASHLAND REQUISITION No. PW 45 - FY 2002 Department Public Works Date February 14,2003 Vendor Pacific Pipeline Inc. Requested Delivery Date ASAP PO Box 3085 Deliver To Jim Olson Central Point OR 97502 Via Paula Brown Account No. 260.08.17.00.704200 --+ 80% (' Note Please allow approximately two(2) weeks for delivery on items not 260.08.34.00.704200 ~ 20% generally caried in stored. and approximately two (2) months on printing jobs.) Item No. Quantity Unit Description Use of Purchasing Office 0 ly Unit Price Total Price POND. Morton Street Storm Drain Project No. 02-23 $ 72,199.00 TOTAL $ 72,199.00 for Kari: BID IRFP IEXEM:PT: Bid Contract StartDllte: Fel).,..ry 18, 2003 Contract .COlnpletionDate 3/18/03 Insurance on file: I YES l NO Project No: 02423 Job No. Unit No. ] hereby certify that the above items are necessary for the operation of this department and are budgeted Issued By Date Received By ~, - CITY OF ASHLAND NOTICE OF TRANSMITTAL TO: KARl OLSON DATE: PROJECT: JOB NO.: SUBJECT: FEBRUARY 14,2003 MORTON STREET STORM IDRAIN 02-23 CONTRACT DOCUMENTS THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Please find attached: 1. Original contract for filing 2. Original bond for filing 3. Original insurance certificate 4. Copy of proposal ENCLOSED ~ UNDER SEPARATE COVER REMARKS: COPIES TO: -P~~ 'B Department of Public ~s By: James H. Olson . Title: City Surveyor/ Pro c ' anager PUBLIC WORKS 20 E. Main Street Ashland, O~on 97520 www.ashland.or.us G:lpub-wrksleng\dept-adminIENGINEERIPROJECT\2002\02-23 In House Contract NOT.doc Tel: 541-488-5587 Fax: 541-488-6006 TTY: 800-735-2900 '.1' ~ .f