HomeMy WebLinkAbout2002-205 CONT Chg Order #5 - Adroit ConstructionPECK SMILEY ETTLIN+
architects
C H A N G E O R D E R
Change Order No.: 5
Date: 21 March 2003
Project: Ashland Fire Station Date of Contract: 10 July 2002
Owner: Ashland Fire & Rescue Contractor: Adroit Construction
You are directed to make the following changes in this Contract:
ADD work described in the attached COPR #33R,35,36,38,39,40,41,42,43,44 $20,346.43
Contract Amount: Add to the Contract Amount the sum of:
Twenty Thousand Three Hundred Forty Six & 43/100 ................................. ...... $ 20,346.43
The Contract Time will be changed by 0 days.
The Date of Completion as of the date of this Change Order is
Original Contract Amount $ 2,513,093.00
Previous Additions $ 55,940.85
Total $ 2,569,033.85
Previous Deductions $ 0.00
Contract Sum prior to this Change Order $ 2,569,033.85
Amount of this Change Order (Add) $ 20,346.43
Contract Amount to Date $ 2,589,380.28
AR HITECT
Date
ACV/
CONTRACTOR
Date
OWNER
Date
J:\99\9924\WP\construction\change orders\co5.doc 4412 SW Corbett, Portland, OR 97201
tel 503.248.9170 tax 503.248.0223
www.psearchs.com
March 12, 2003
adroit
CONSTRUCTION COMPANY, INC.
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #33Revised
Dear Bob,
The following are revised costs to install lag screws and low temp blue skin flashings per
detail R42 and R43.
(150) 5/16 x 6" lags with washers @ $.26
Carpentry labor 12 1 /2 hours @ $46.00
Flashing labor and materials
Adroit overhead / profit
Bond / insurance
D
l_D
$39.00
575.00
1,550.00
Subtotal $2,164.00
216.40
47.60
Total Cost $2,428.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/ph
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
if
DD
adroit
CONSTRUCTION COMPANY, INC.
March 6, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #35
Dear Bob,
The following are costs to revise the structural connection of (2) glue lam outlookers at Grid 3 because
the layout interfered with the existing masonry block walls.
Screws, epoxy, all thread, washers and nuts
Carpentry labor 2 hours @ $46.00 per hour
Adroit Overhead / Profit
Bond / Insurance
$35.43
92.00
Subtotal: $127.43
12.74
2.83
Total Cost: $143.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feet free to call me
if you have any questions or need additional information.
Sincerely.
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashtand, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
CITY OF ASHLAND
2O E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 609
ASHLAND, OR 97520
CITY RECORDER'S COPY
09/20/2002
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SISKIYOU BLVD
ASHLAND, OR 97520
Page 1 /2
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
Req. No.:
Dept.: FINANCE
Contact: Keith Woodlev
Confirming? No
Quantity Unit Description Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER
BLANKET PURCHASE ORDER
Fire Station Construction 2 513 093.00
Bid
" Contract dated: July 10, 2002
Start date: July 20, 2002
Completion date: 365 Days (07/20/2002)
Insurance required/On file
Revised purchase order 10-15-2002 23,697.62
r . Change Order No, 1 :
Add work described in the memos of 15th
& 16th of August 2002 & COPR
#1,2,3,4,6,&6A
Revised purchase order 12/05/2002 · ' :, 20,907 81
Chan.qe Order No. 2
ADD work described in the attached COPR '
#5,9,10R2,11,12R,13R,16 & 17
..$22,109.81. DELETE work described in
the attached COPR #8 & 18.
· Revised purchase order 02t05/2003 5,240.05
Change Order #3
· ADD work described in the attaced CQPR
#20, 21,24, 25 ,& 26R - $14,007.42.
· DELETE work described in the attached :
COPR #19 & 23 - ($8,767.37)
SUBTOTAL
BILL TO: TAX
FREIGHT
TOTAL
E 410.03.43.00.702200 2,589,380.28
Authorized Signature VENDOR COPY
Page 2 / 2
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 609
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
DATE PO NUMBER
09/20/2002 03624
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SISKIYOU BLVD
ASHLAND, OR 97520
Req. No.:
Dept.: FINANCE
Contact: Keith Woodley
Confirming? No
Quantity Unit Description Unit Price Ext. Price
Revised purchase order 03/10/2003 6,095.37
Change Order #4
ADD work described in the attached COPR
#28, 30R, & 31 $6,325.87. DELETE work
described in the attached COPR #29
($230.50)
Revised purchase order 3/27/2003 20,346.43
Change Order #5
ADD work described in the attached COPR
#33R, 35, 36, 38, 39, 40, 41, 42, 43, 44
I
SUBTOTAL 2.58 9 380.28
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 2,589,380.28
ASHLAND, OR 97520
Account Number Amount Account Number Amount
3,1171,1
A ized Signature VENDOR COPY
CITY OF
ASHLAND
REQUISITION FORM
THIS REQUEST IS A:
Date of Request: 03-21-2003
? Change Order(existing PO # 03624) Required Date of Delivery/Service:
Vendor Name: ADROIT CONSTRl1CTION
Address: PO Box 609
City, State, Zip: Ashland, OR 97520
Phone: 482-4098
Fax Number 8
Deliver Location 482-421
Services Only
Description
Total Cost Solicitation Process:
? Exempt ? 3 Written Quotes
(copies attached)
? Sole Source ? Invitation to Bid
(copies on file)
Fire Station Construction Project
Change Order # 5
$ 20,346.43 ? Less than
$5000 ? Request for
Proposal (copies on file)
Account Number 410-03-43-00-702200
*Please attach the Original signed contract and Insurance certificate.
Materials Only
Account Number
___-__-__• •______
*Please attach the quotes.
.vr
Employee Signature: ????" C?Uyr?Gl Supervisor/Dept. Head Signature:
NOTE: By signing this requi tion form, I certify that the above uest meets the City of Ashland Solicitation Process requir ments and can be provided
when necessary.
G:FinancelProcedure\APlFormslRequisition form - Change Order 5 Updated on:07/15/02
? D
adroit
CONSTRUCTION COMPANY, INC.
March 6, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #36
Dear Bob,
The following are costs to make revisions per sheets R45r, R46r, R47r, and R48.
Drywall and metal studwork
Cabinet credit
Painting
Floor Covering
Fire sprinkler
HVAC
Electrical
Adroit Supervision
Adroit Overhead / Profit
Bond / Insurance
$1,632.00
(2,721.00)
285.00
No Cost Change
208.00
1,212.86
819.86
180.00
Subtotal: $1,616.72
161.67
35.61
Total Cost: $1,814.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me if you
have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Bob Thrap
From: Bob Thrapp
Sent: Wednesday, February 26, 2003 4:47 PM
To: Jim McNamara (E-mail); John Gilbert (E-mail); Keith Woodley (E-mail); Steve Lawrence (E-
mail)
Subject: FW: Plan Changes
Here are the revisions per our discussions and the site meeting
-----Original Message-----
From: Bob Thrapp
Sent: Thursday, February 20, 2003 5:55 PM
To: Steve Lawrence (E-mail)
Cc: Jim McNamara (E-mail); John Gilbert (E-mail); Keith Woodley (E-mail)
Subject: Plan Changes
Please find attached sheets R45-1349 detailing minor plan changes on the first and second floor.
Work Room 112 Changes (R45, R48 & R49):
Work Room 112 was divided into two rooms by new wall. (see plan for electrical and communications)
[Bob Thrapp] 2'-4" of uppers and 15'-10" of lower cabinets were deleted from the Work Room. See Sheet R49.
Doors 115 & 113 were relocated.
The opening into the work room was moved to be centered on the wall.
The new office floor material will be carpet.
The ceiling was reconfigured.
A new supply and return were located in the new office.
Add light switch.
The area below Stair 111 was enclosed (R45, R46, R48 & R49):
Relocate door 106A to this location. The credit for this door will not be exercised.
T-9" of upper and lower cabinets were deleted.
Provide 4' wall mounted fluorescent with wall switch.
Floor to be sealed concrete.
Add [Bob Thrapp] 20'spread sprinkler head under stair.
Day Room 223 Changes: (R47 & R49):
[Bob Thrapp] 2'-6" of lower cabinets were deleted with the cabinets [Bob Thrapp] remaining on the East wall of the
room.
Extra electrical outlets deleted
Thanks,
Bob Thrapp
PSE Architects
503.417.7611
_E1 _E1 U
r45r.pdf r46r.pdf r47r.pdf r48.pdf r49r.pdf
MAR-07-2003-PRI 03:47 PM ADROIT CONSTRUCTION
PAX No. 5414824218 P.001
Fax
PO Box 609
Ashland, Oregon 97520
Phone 541-482-4098
Fax 541-482-4218
.fob: Ashland Fire & Rescue
Re: Backup for Change Order #t36
To: Robert Thrapp From: Reba Haas, Marketing/Estimating Assist.
company Peck Smiley Ettlin Architects Pages: 3
Fax: 503248.0223
Date: 3/7!03 3:49 PM
? Urgent ? For Review ? Reply by Return Fax ? For Pricing no later than
• Comments
Steve asked me to fax you Robert Lloyd Sheet Metal and Valley Electrical Contractors backup for
Change Order #36. Both are attached.
This fax transmission is intended for the recipient as indicated above.
The information contained within this document is confidential.
Unauthorized distribution of the contents of this document, in full or in
part, is strictly prohibited. If you have received this message in error,
please notify us immediately by telephone at (541) 482-4098.
MAR-07-2003 15:52 95% P R1
MAR-07-2003-FRI 03:47 PM ADROIT CONSTRUCTION
",,--,---- ....
FAX No. 5414824218
P. 002
: -- ."-" /,,'~ r-;~"\ \""\.17
( r ; p ':::::!) " ,
\ ", . r ; i U' -- ':; 1-'
'-_.:.." \..._~.,/ . ~ j .
c C-~ <:6~
J
oj
Change Order Cost Impact
Robert Lloyd Sheet Metal, me.
1'.0. BDx 307 14485 JAdepeDdeaee Rwy 51
IDdependenc:e, OR 97351
(!O3) 8308-3863 FAX (503) 831-3964
EDlllD Addren: .rt-rb -n-aet
Adroit Construction
WE HElll.BY SUBMiT SPSOFlCA TlON AND ESnMA TES FOIl:
The following charges are associated with revisions for adding a separate room out oCthe work room.
Adding a supply and return for that room
ITEM
TOTALS
$520.00
$195.00
$113.30
$130.00
$9636
$0.00
SO.OO
$0.00
$0.00
SO.OO
$0.00
$0.00
15% Markup SlSS.20
T~TAL ~ $1.212.B6
hdudes: any aDd all framing, pajlltin~ sbeetrocldng, DlOviD2 of plubming or electrical;., ,
QTY
8
3
145.26
2
123.54
S/QTY
$65.00
$6S.00
$0.78
$65.00
SO.78
Field Labat
Shop Labot
Metal
Grilles
Ductwrap
-{
Cor
58 C ltltIerCSt on any .mounlS DYU J d~.
malenal is t;u8T.UIICC to 8$:speci J . A WDt to be CO"'" e1c:d :l WO h I1)aMCl'
lICeordin6 to standard prlCli~. My allenllion or devialiDn tTom above spceillcaliOlll
il\Yolvil'll Ulr.I Cl)$1S WJlI bl:: elCC1ltCd only upon wnLton ordeJS.lUId will become an exn ,
~& ~yer :and ;ibovc: \tic eJCimate. All ~~n15 contil\~t upon :sll'ikes. aa:lclmlf or dela~
bo,yond 0"," ccm...ol. o-er 10 ClIJ1y ftrc. 'IOmeGa Uld lIIher Jloccssal)' ;nNnlnCt. O\Ir ~
= fully _eel by WOl'Ianen's COftJIl8malion Insurance.
AC(:eptllnce of Proposal
Tbe Dbove prices, ~tcineation and concIlrioa. an: lW*tory IOd .~ 1mdly accepted.
Va.. an: llIIlhor\zccllO clo Ihe work as IJ!ReinCll. J'aymeal wiU be made lIB OIIt1incd abo- Sip:al\R
If 1llc prllpD5Bl is 1lIll sil:J1cd and RLSM is nDliced ~ proceccl with the Dba,,", werle, Ibie proposal baa heeD muml\)' aceeptr:d.
Ollie 01' Acceplamc Signatul9
."-'" ..,~--.-.;.---
MAR-07-2003
15:53
95%
P.02
MAR-07-2003-PRI 03:48 PM ADROIT CONSTRUCTION PAX No.5414824218 P.003
.4amilton VALLEY hLECTRI A P.O.Box1555
,.,e Hills Medford, OR 97501
X13 #55415 ONTRAC°ORS, INC.Tel0(541)773-1405
Fax # (541) 770-2819
February 24, 2003
Adroit Construction Co., Inc.
P. O. Box 609
Ashland, OR 97520
Attn: Susan Scott
Re: Cityty of Ashland Main Fire Station
Changes in stairs 111 & work room 112
Credit 10' Wiremold & 2 Outlets
Credit 2 C6 Fixtures & Lamps
1 C2-32 Strip Fisture
7 4Sq. Boxes Bracket
3 4Sq. 3/0 Rings
4 4Sq. 1 Gang Rings
80' 3/4 EMT
1 3/4 SS Connectors
1 3/4 Bushing
80' 1 /2 EMT
10 1 /2 SS Connectors
5 1 /2 SS Coupling
1 4 Sq. Box
1 4Sq. Blank
1 Fixture whip
1 SP Switch
2 Duplex Receptacle
2 P-8 Plate
1 P-1 Plate
210' 12 THHN
Lot Photo Smoke Detector & Wiring
7.5 Hours Labor
i
TOTAL ADD THIS CHANGE ORDER
.,j
Fj a . 2CQ1 I _
17
Lot $ (53.88)
$ 59.19 $ (118.38)
$ 33.92 $ 33.92
$ 3.74 $ 26.18
$ 2.01 $ 6.03
$ 1.66 - $ 6.64
$ 1.04 $ 83.20
$ 2.05 $ 2.05
$ 0.22 $ 0.22
$ 0.58 $ 46.40
$ 1.27 $ 12.70
$ 1.25 $ 6.25
$ 2.61 $ 2.61
$ 0.97 $ 0.97
$ 3.95 '$' 3.95
$10.55 $ 10.55
$11.13 $ 22.26
$ 0.31 $ 0.62
$ 0.31 $ 0.31
$ 0.08 $ 16.80
Lump sum $ 300.00
$ 44.79 $ 335.93
745.33
0.10% $ 74,53
$ 819.86
MAR-07-2003 15:53 95% P.03
D
adroit
CONSTRUCTION COMPANY, INC.
March 13, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal 438
Dear Bob,
The following are costs to excavate and haul off site (2) concrete light pole bases as verbally approved by Jim
and Keith. I'm sorry I didn't get you this information earlier, it got lost in the shuffle.
10-9-02 Excavate concrete light pole bases
315 Excavator 2 1 /2 hours @ $120.00
11-1-02 Load and haul off concrete light pole bases
315 - Excavator I hour @ $120.00
Dump truck 1 hour @ $60.00
Recycle concrete 17.11 tons @ $5.75
Adroit overhead / profit
Bond / insurance
$300.00
120.00
60.00
98.39
Subcontractor Total: $578.39
57.83
12.72
Total Cost: $648.94
Please advise us in writing if these costs are acceptable to you. Feel free to call me if you have any questions or
need additional information.
Sincerely,
CLC ?, .
Steve Lawrence
SL/cr
cc: Keith Woodley
Jim McNamara
Accepted by
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
ov Oo 02 02:37p Burl Brim Excavation 15414888353
P.3
Bud Billm EXcavatiou- 11IC.
SUBCONTRACTOR TIME & MATERIALS DAILY WORK RECORD
JotsNafrie:01A!!?_-41.?gZ&1??!r? Dater
Extra Work Requestor: 1'11,1,t Ag,rc, 4?'
Description of Work: f, L c._:c? _,>X','„r?,? .r .._f 3. a - .ice ?r?L
Relative to the following directive(s) by the Owner;
ASI #
Authorized by Adroit:
LABOR
RFI #
CCD #
RFP #
Date:
Workmen s Narrip Classification Hrs Pay Rate Pay Total
Vd _ Pk*f / . 00
14-
Zo .00
DAILY TOTALS
MATERIALS
Material Items Number Unit Price Total Invoice #
KC&J t" Con ozt; N ... S.?S .3q
DAILY TOTALS
EQUIPMENT
E=quipment Items Hours Rate Total Invoice #
DAILY TOTALS
This wurk was completed as witnessed by f2-?T,3?
Adroit Project Superintendent F,. Date: I "U Z_
NOTE: Signature by Adroit Project SuporintendentAs not ail bckWwledgement or acceptance of costs.
L5? Jab Complete ? More work to Signature:
perform Authorized Subcontractor Representative
Forward all signed Time & Materials Daily Work Record(s) to: Adroit Protect Manager upon completion of the work,
All Time and Materials Daily Work Records must be accompanied by Material Invoice Copies, Rental Receipt Copies,
Workmon(s) Pay Rate as authorizeri by the Contract Documents for the Project or pre-arranged with Adroit.
ALL T & M DAILY WORK RECORDS ARE TO BE SIGNED BY ADROIT PROJECT SUPERINTENDENT DAILY.
• ?. ?,r„ e-nov ov anRnrr PQnJF_C7" SUPERINTENDENT WILL BE ISSUED TO YOUR FOREMAN EACH DAY.
Mar 13 03 04:21p Burl Brim Excavation 15414888353
Burl Brim Excavation. Inc.
SUBCONTRAACTOR TIME,& MATERIAL$ DAILY WORK RECORD
Job Name:
Extra Work Requestor:
nescription of Work:
p.2
-/ /9/a3
Relative to thu fulluwing directive(s) by the Owner;
AS1 #
RFI #
CCD # RFP #
Authorized by Adroit: Date:
LABOR
Workmen(s) Name Classification Hm Pa Rate Pa Total
DAILY TOTALS
MATERIALS
Material Items Number Unit Price Total Invoice #
DAILY TOTALS
EQUIPMENT
Equipment Items Hours Rate Total Invoice #
3T5?..c off? rr._- _.. _.. 5 ao BO ------
DAILY TOTALS
This work was completed as witnessed by me:
Adroit Project Superintendent: Date:
NOTE: Signature by Adroit Project Superintendent is not an acknowlpdgerj? n .or acceptant of osts-
Job Complete ? More work to Signature:
perform Authorized Su ntractor Representative
Forward all signed Time & Materials Daily Work Record(s) to: Adroit Project Manager upon completion of the work.
All Time and Materials Daily Work Records must be accompanied by Material Invoice Copies, Rental Receipt Copies,
Workmen(s) Pay Rate as authorized by the Contract Documents for the Project or prearranged with Adroit.
ALL T & M DAILY WORK RECORDS ARE TO BE SIGNED BY ADROIT PROJECT SUPERINTENDENT DAILY.
A SIGNED COPY BY ADROIT PROJECT SUPERINTENDENT WILL BE ISSUED TO YOUR FOREMAN EACH DAY.
00 NOT FORWARD THESE FORMS WITH YOUR MONTHLY BILLING INVOICING
D
adroit
CONSTRUCTION COMPANY, INC.
March 17, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #39
Dear Bob,
The following are costs to provide and install a 24" x 18" louver in Door #135 as requested.
Louver materials
Carpentry labor 1 1 /2 hours @ $46.00 per hour
Adroit Overhead / Profit
Bond / Insurance
$78.50
69.00
Subtotal: $147.50
14.75
3.25
Total Cost: $165.50
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
z
Steve Lawrence
SL/cr
cc: Keith Woodley
Jim McNamara
Accepted by
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
D
adroit
CONSTRUCTION COMPANY, INC.
March 17, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #40
Dear Bob,
The following are costs to provide and install (4) twist straps per the Engineer's report.
Materials
Carpentry labor 4 hours @ $46.00 per hour
Adroit Overhead / Profit
Bond / Insurance
$12.50
184.00
Subtotal: $196.50
19.65
4.35
Total Cost: $220.50
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
RLMD
adroit
CONSTRUCTION COMPANY, INC.
March 17, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #41
Dear Bob,
The following are costs to provide and install a 1 1/2" ball valve for the (2) second floor urinals as
requested.
Plumbing materials
Plumbing labor 2 hours @ $61.50 per hour
Adroit Overhead / Profit
Bond / Insurance
$147.00
123.00
Subcontractor Total: $270.00
27.00
5.94
Total Cost: $302.94
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve awrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
V LJ
adroit
CONSTRUCTION COMPANY, INC.
March 19, 2003
Robert Thrapp
Peck Smiley Ettlin Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #42
Dear Bob,
The following are costs to provide and install gutters and standard downspouts at
the upper roof. Color will match roofing and will be 24 gauge Kynar.
Gutters & Downspouts $4,847.11
Adroit Overhead/Profit 484.71
Bond/Insurance 106.63
Total Cost $5,438.45
We exclude custom concealed downspouts. Please advise us in writing AS SOON
AS POSSIBLE if you would like us to proceed with this change. Feel free to call
me if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/rdh
cc Keith Woodly & Jim McNamara
Enclosure
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
040
EVERGREEN ROOFING, INC. (541) 826-5869
700 Industrial Cir. P.O. Box 2396 White City, OR 97503 Fax: (541) 826-4915
March 18, 2003
John Gilbert
Adroit Construction, Inc.
Re: Gutters for Ashland Fire & Rescue
The price for gutters and downspouts for the Ashland Fire Station is $4,847.1.1.
ff the gutters are installed with scupper boxes and drains, a plumber provided the drain
and runs the pipes through the soffit, and we install downspouts the price will be
$5,024,10.
I know these prices are high., but the gutter coil is very expensive, as it is 24 ga.Kynar
and has to be slit from full sized coil. This is not an area in which AEP-Span is very
competitive, however, because the fascia is wrapped, I think it is important to obtain
the coil froin the same source as the roofing to uisure a good color match.
If you have any questions, please give ?ne a call itt the number above.
Sincerely,
Sharon Keppler)
MAR-20-2003-THU 03:02 PM ADROIT CONSTRUCTION
adroit
CONSTRUCTIOX COMPANY, INC.
ti
March 20, 2003
Robert Thrapp
PecldSnufey/Ettlin, Arrbitects
4412 S.W. Corbett
Poztlarld, OR 97202
FAX ND. 5414824210 P.001/002
no
y I E 1? ,1 -I nD
l Re-, Ashland Fire Station
Change Order Cost Proposal 043
Tear Bob,
The #ollowjAg are costs to add (2) RJ)-I and (2) Old-I at. the north and south roofs as
requested.
Plumbing Labor and Mama)
Bondllnsumxice
S3,505-00-
u,?
4-3-W.
z??,/o3
44-7--H7-0,10
Total Cost 4+,93t 6t
3,5T!;. to
Please advise us in writing if you would like us to proceed with this change- keel free to
call the if you have any quesd ms or need additional infoxntation-
'Sinc?zely, -
Steve Lmva-cnce
SlJph
Keith Woodly, Tm McNamara
ADROIT CONSTRUCTfOR COMPANY, INC.
P.O- Box 609, Ashland, Oregon 47520 . 541-482-4098 - fax: 541-482-4218
OREGON No. 44384, CALIFORNIA NO- 4349609
MAi--20-2003-TRU 03:06 PM ADROIT CONSTRUCTION FAX ND. 5414824218 F.002/003
Stint By: PAT soN rLBG; 541 773 2849; Mar-10-65 i2!c7Po; Paga 111
L
PATTERSON PLUMBING CO.
Pic 5
(54i) I 4 W Nx (541) l 282
2086 Lars flay * IIAL4fford, OR 87501
AbRC4T CONSTRUGMN
P.G. BOX 609
ASHLAND. OR 97M
RE. ASKAND FIRE STATION
ATTN.-JOHN
ITEM #1
PRM TO ADD (2) RD-1. (2) 00-1 AS PER NEW DRAWNQ 22AUG0 .
'IOTA PIME, ITEM 91 ......... .......,...........................$mMm
SEA 'ATTi GHED QREAKDI?WN
? ?sp?eCti?4ty Stelxr?lted, .
Gregg yloth
MAC'.-20-2003-THU 03:02 PM ADROIT CONSTRUCTION FAY No.54I48242I8 P.002;002
1
MAR-20-2003-TH 03:06 PM ADROIT CONSTRUCTION FAX Na.5414824218
z
r
,r
D ? t? t
-V .n
o
i? W
P. 003;003
lc?
? Q
e_
W
r
t7
]a
x
Z
." 1, -c. -RdV4-GL t:a-bP-Jufi :avoe Vii Ctrs !Oflld N09HAuVd :Aq juag
Corr- * 4j-
............... .
fi3f?bt?9F ' 3=1:' t44= El T'RICRL CDNTm FOR'' ? 48853ia M. 2w 901
P.O. Box 1555
Uw Haut ALLEY LECTR i CAL i (ro. 7 87501
stave f-f?s ?S?f7) 773-?aos
MB #55415 CONTRACTORS, INC. Fix 770 alg
PAGPOSAL,.
TO:4
valley bl4trical Con"ctors. inc. propo9e9 10 turnieh the labor anQ rnbl T WIS W aCCOtnplish the r011vwirx9:
{Ca--nQrzi D5scriptlan of WQfkl
V'"L IT= STATM #1-.
?6 + C$ CAME (Y JAM L ? 4$ PA= per.
28- CAWS ORAMM JAGS 2 = S. UM MHAMMM
42-1 Ste. PAM P Am 4 = bb It 50 BLOCK IIX 1d+D=
11 = C.A T-V. zmca ?
at 55 Sislimm AM. 21 ASMAND, GR 975" for the
gilt 01 -o k!
oomQen9 na" as wo%.s: ;5,090_00
", `OOv
FKM tcffj.AAS yAhnnij 041fropq ?p Soo
Trte oposat is baled upon estlmatiod quamillos for the work as follows,
In woem dre pn*act shall regdire wam qr edxce5a of the quartotiea above ed *A and irlhis is a kfMip wim proopasat extra
CnQnWs 1 be n1adn forsuch additiWelt¦etu at tna tales uien wing reg+aarjy changed by VW vnder*nedfar Audi AmTkza,.
shalt ba rye on or before 10 d812 Alas billing fnioti arg omrVe ion of the work- Tha pwW prevatTa+g in any
Iitigntitm sizing aut of ttib vmwkr *r do bgreettre - O%Wl be CnIMW to recover Such sum as the GoWt "Myr az? n?z5oraw
as alt `sSfees ift iibgalton.
Late arges of 1 145E par raDrah (1695 antlt? p rceff age rate) will be C:Inrged on ammmits not paid wilt+? 30 days
fbikwcomplchohdaWL
This pi
only of
Dated i
wd i9 made iof acceptanve wi1hirr?ayr9
flare liaraof-
,D_dWof 7fAtM 20-_.
S-ECTRICAL CONTRACTOR% INC
4
ACCEPTANCE
The foregoing proposal is accepted this
slay of -20-
by - - -
VA/M M HS11 aT1DR eVn wfgvm umw4d9 -co ww mw- 4 vmft y EAmbi& t G-abackw; Vic- Rwhw% d4wlzp fr-+rl
T00 QN SIDEUMMV $Sd ... EMMEM V HH1d e4V'IHSV SUS M T$5 IM L0 =80 IHd CO/T7,/CO