HomeMy WebLinkAbout2002-206 CONT Chg Order #6 - Adroit ConstructionPECK SMILEY ETTLIN*
architects
C H A N G E O R D E R
Change Order No.: 6
Date: 25 April 2003
Project: Ashland Fire Station Date of Contract: 10 July 2002
Owner: Ashland Fire & Rescue Contractor: Adroit Construction
You are directed to make the following changes in this Contract:
ADD work described in the attached COPR #46,47,48,50,51,52,53,54,55 $6,747.71
DEDUCT work described in the attached COPR #45 ($517.50)
Contract Amount: Add to the Contract Amount the sum of:
Six Thousand Two Hundred Thirty & 21/100..... .................................. $ 6,230.21
The Contract Time will be changed by 0 days.
The Date of Completion as of the date of this Change Order is
Original Contract Amount
Previous Additions
Total
Previous Deductions
Contract Sum prior to this Change Order
Amount of this Change Order (Add)
Contract Amount to Date
ARCHITECT
7-
Date
CONTRACTOR
1 - Z.G7 -o
Date
$ 2,513,093.00
$ 76,287.28
$ 2,589,380.28
$ 0.00
$ 2,589,380.28
$ 6,230.21
$ 2,595,610.49
e1c
OWNER
2lte r./ 2,003
Date
J:\99\9924\WP\construction\change orders\co6.doc 4412 SW Corbett, Portland, OR 97201
tel 503.248.9170 fax 503.248.0223
www.pseurchs.com
adroit
CONSTRUCTION COMPANY, INC.
March 25, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #45
Dear Bob,
The following is a credit to delete the fire dampers as requested.
Labor and material credit
(517.50)
Total Credit: ($517.50)
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Change Order Cost Impact
Robert Lloyd Sheet Metal, INC.
P.O. Box 307 / 4485 Independence Hwy 51
(E)
Independence, OR 97351
(503) 838-3863 FAX (503) 838-3964
Email Address: art-rlsm west.net
Adroit Construction March 19, 2003
JU0 NAME
Ashland Fire Station
CITY, STATE AND ZIP CODE FAX JOB LOCATION
WE HEREBY SUBMIT SPECIFICATION AND ESTIMATES FOR:
The following charges are associated with deleting the fire dampers. There will be no credit for the
dampers themselves because they are made to order. Credit is for Labor only
ITEM QTY $/QTY TOTALS
Credit field Labor -4.5 $65.00 ($292.50
Credit access doors -9 $25.00 ($225.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL 517.50
Excludes:
This proposal is only good for 30 days. Alter 30 days, this proposal is no longer valid and subject to cost increases.
Payment to be made as follows: 30 days, net 0, 12% simple interest on any amounts over 30 days.
All material is guarantee to be as specified. All work to be completed to a workmanlike manner
according to standard practices. Any alteration or deviation from above specifications Authorized
involving extra costs will be excused only upon written orders, and will become an extra Signature
charge over and above the estimate. All agreements contingent upon strikes, accidents or delays nett
beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers Project onager
are fully covered by Workmen's Compensation Insurance.
Acceptance of Proposal
The above prices, specification and conditions are satisfactory and are hereby accepted.
You arc authorized to do the work as specified. Payment will be made as outlined above. Signature
If the proposal is not signed and RiSM is noticed to proceed with the above work, this proposal has been mutually accepted.
Date of Acceptance Signature
adroit
CONSTRUCTION COMPANY, INC.
March 25, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #46
Dear Bob,
The following are costs to relocate the double detector check valve assembly to the horizontal position
under the window and repipe the main riser and Fire Department connection line.
Fire sprinkler labor and materials
Adroit Overhead / Profit
Bond / Insurance
$917.00
91.70
20.17
Total Cost: $1,028.87
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
cc: Keith Woodley
Jim McNamara
Accepted by
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Mar 21 03 05:54p PACIFIC FIRE SPRINKLER CO 15416647967
PACIFIC FIRE
SPRINKLERS
DIV. OFAPROFESSIONAL FIRE SYSTEMS du-
DATE: March 21, 2003
.Adroit Construction
.P.O. Box 609
.Ashland. Or. 97520
ATTN: John Gilbert
RE:Ashlard Fire Station
Relocate Double Det. Check Valve
s E?
We are pleased to submit our proposal for the above referenced proiect.
Our price of $917.00 INCLUDES the required labor, materials, design,
fabricaticn, plans review and permit to complete this project.
Our price is based upon the following, starting at the existing pipe and
relocate t',e double detector check valve assy. To a hcrizonal Nosition under
the window and repipe the main riser and fire dept. connection line.
EXCLUSIONS:I)
2)
3)
4)
5)
6)
Ail electrical stork
Painting
Patching
Central station alarm equipment
Bond
Cost of cad disks
_Thank you for the opportunity to submit our proposal on this
project. If you have any questions, please contact me.
Respectfully Submitted,
PACIFI -FIRE SPRINKLER CO.
Cluck McCracken
Division Manager
Accepted:
Date:
p.l
5592 Table Rock Road Central Point, Oregon 97502 • CCB# 41650
Phone (541) 664-6651 Fax (541) 664-7967 • pacific@cdsnet.net
April 2, 2003
adroit
CONSTRUCTION COMPANY, INC.
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #47
Dear Bob,
The following are costs to add desk area, cabinets and countertop to Donn Room #209. We exclude
tackboards at this time.
Cabinet labor and materials
Adroit Overhead / Profit
Bond / Insurance
$854.00
85.40
18.78
Total Cost: $958.18
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
5?a- LSteve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
CITY RECORDER'S COPY
Page 1 /2
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 609
ASHLAND, OR 97520
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SISKIYOU BLVD
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
Req. No.:
Dept.: FINANCE
Contact: Keith Woodley
Confirming? No
· Quantity. Unit .' .... Description ' Unit PriCe EXt. Price', ....
THIS IS A REVISED PURCHASE ORDER
Fire Station Construction 2,513 093.00
Bid
Start date: Julv 20, 2002
Revised purchase order 10-15-2002 23,697.62
Add work described in the memos of 15th
~1,2,3,4,6,&6A
Chan~e Order No. 2
: ::%. AOD'.wo~k'described in the attached COPR :..
~5,9,10R2,11,12R,13R,16 & 17
'"" ...:::'.'"'. $22,109.81. DELETE work describedin
the attached COPR fi8 & 18.
· .? ReViSed pUrchase order 02/05/2003
Chan~e Order ~3
.'": "'..'"."ADD work described n.~e:'affaCed COPR
~20, 21,24, 25 ,& 26R - $14,007.42.
; DELETE work described in the attached :: =
COPR ~19 & 23- ($8,767.37)
.:...... .... ,, ... ..
SUBTOTAL
BILL TO: T~
FREIGHT
TOT~
.... Account Number ....... ~mount ...... Account Number.____ I Amount
E 410.03.43.00.702200 2,595,610.49
Authorized Signature VENDOR COPY
Page 2 / 2
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 609
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
DATE PO NUMBER
09/20/2002 03624
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SISKIYOU BLVD
ASHLAND, OR 97520
Req. No.:
Dept.: FINANCE
Contact: Keith Woodley
Confirming? No
Quantity Unit Description Unit Price Ext. Price
Revised purchase order 03/10/2003 6,095.37
Change.Order #4
ADD work described in the attached COPR
#28, 30R, & 31 $6,325,87. DELETE work
described in the attached COPR #29
($230.50):
Revised purchase order 3/27/2003 20,346.43
Change Order #5
ADD work described in the attached COPR
#33R, 35, 36, 38, 39, 40, 41, 42, 43, 44
Revised purchase order 05/01/2003 6,230.21
Change Order #6
ADD work described in the attached COPR
#46,47,48,50,51,52,53,54,55.
DEDUCT work described in the attached
COPR #45
SUBTOTAL 2,595,610.49
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 2,595,610.49
ASHLAND, OR 97520
Account Number Amount Account Number Amount
DOR COPY
`sVre Autho W ed Signat VEN
CITY OF
-ASH LAN D
REQUISITION FORM
Date of Request: 04130103 7]
T IS REQUEST IS A:
Change Order(existing PO # 03624) Required Date of Delivery/Service:
Vendor Name: ADROIT CONSTRUCTION
Address: PO Box 609
City, State, Zip: Ashland, OR 97520
Phone: 482-4098
Fax Number _
Deliver Location
Services Only
Description
Total Cost Solicitation Process:
? Exempt ? 3 Written Quotes
(copies attached)
? Sole Source ? Invitation to Bid
(copies on file)
Fire Station Construction Project
Change Order # 6
$ 6,230.21 ? Less than
$5000 ? Request for
Proposal (copies on file)
Account Number 410-03-43-00-702200
*Please attach the Original signed contract and Insurance certificate.
Materials Only
Account Number
*Please attach the quotes.
Employee Signature: Supervisor/Dept. Head Signature: ? L ( `'
'?' ?
NOTE. By signing this requisition form, I certify that the above request meets the City of Ashland Solicitation Process requ' ements and can be provided
when necessary.
G:FinancelProcedurelAPlFormslRequisition form - Change Order 6 Updated on:07115/02
F ED
adroit
CONSTRUCTION COMPANY, INC.
April 3, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #48
Dear Bob,
The following are costs for (2) additional fire extinguishers and (2) cabinets per your Fire Extinguisher
Plan R54 dated 3-24-03. I have also added (1) wall mounted fire extinguisher for the elevator
equipment room.
Fire extinguishers and cabinets
Installation labor 3 hours @ $46.00 per hour
Adroit Overhead / Profit
Bond / Insurance
$319.00
138.00
Subtotal: $457.00
45.70
10.05
Total Cost: $512.75
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
cc: Keith Woodley
Jim McNamara
Accepted by
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
April 10, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #50
Dear Bob,
The following are time and material costs to add conduits for radio to the dining room and kitchen.
Electrical materials
Electrical labor 8 hours @ $42.41 per hour
Subcontractor overhead / profit
Adroit Overhead / Profit
Bond / Insurance
$97.37
339.28
43.66
Subcontractor Total: $480.31
48.03
10.56
Total Cost: $538.90
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Mike Hamilton LEY VAE'ELECTRICAL
Steve Hills
CCB #55415 CONTRACTORS, INC.
April 7, 2003
Adroit Construction Co., Inc.
P. O. Box 609
Ashland, OR 97520
Attn: Carrie Robertson
Re: City of Ashland Main Fire Station
Directed change to add conduits for radio to dining room and kitchen
60' 3/4 EMT 1.04 $ 62.40
3 3/4 SS Connectors 2.05 $ 6.15
4 3/4 SS Couplings 1.89 $ 7.56
5 3/4 1 Hole Straps .14 $ . .70
1 3/4 Plastic Bushings .19 $ .19
5 8 X112 Screws .02 $ .10
1 3/4 Rigid 90 Ell 4.89 $ 4.86
2 314 Rigid Couplings 1.48 $ 2.96
6 6' Ceiling Wires 1.95 $ 11.70
3 3/4 Caddy Clips .22 $ .66
8 Hours of Labor 42.41 $339.28
$436.56
+10% $ 43.66
Total Add This Change $480.22
P.O. Box 1555
Medford, OR 97501
Tel # (541) 773-1405
Fax # (541) 770-2819
APR-82L43;.
Roland A. Glass - Estimator
'^ D
adroit
CONSTRUCTION COMPANY, INC.
April 10, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #51
Dear Bob,
The following are costs to change the exit lights per your request.
Electrical materials
Electrical labor 10 hours @ $42.41 per hour
Subcontractor overhead / profit
Adroit Overhead / Profit
Bond / Insurance
$698.50
424.10
112.26
Subcontractor Total: $1,234.86
123.48
27.16
Total Cost: $1,385.50
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely, Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Mike Hamilton VA LLEY ELECTRICAL
8teve Hills
CCB#55415 Laf- L earl C --.1-
April 4, 2003
Adroit Construction Co., Inc.
P. O. Box 609
Ashland, OR 97520
Attn: Carrie Robertson
Re: City of Ashland Main Fire Station - Change Request on Exit Lights
P.O. Box 1555
Medford, OR 97501
Tel # (541) 773-1405
Fax # (541) 770-2819
AM - 8 20Q3
i,
AFCENE`?..:
160' 112 EMT .58 $ 92.80
10' 1/2 S.S. Connector 1.27 $ 12.70
14 1/2 S.S. Couplings 1.89 $ 26.46
3 4 Sq Bracket Boxes 3.74 $ 11.22
3 4 Sq 3/0 Plaster Rings 2.01 $ 6.03
2 4 Sq Boxes 2.60 $ 5.20
2 4 Sq Blank Cover .97 $ 1.94
510 12 THHN Wire .09 $ 45.90
1 Exit Light & Handicapped (single Face) 193.75 $ 193.75
2 Exit Lights (Double Face. I Single Face) 147.25 $ 294.50
Lot Misc. & Fasteners ---- $ 8.00
10 Hours Labor 42.41 $ 424.10
+10% $ 112.26
Total Add This Change $1,234.87
Roland A. Glass - Estimator
APR-17-2003-7HU 04:01 PM ADROIT CONSTRUCTION FAX No.5414824218 P.001I001
adroit
CONSTRUCTION COMPANY, INC-
April 17, 2003
Robert lbxapp
Peck/'Smiley/Etdia, Axchiawts
4412 S.W_ Corbett
.Portland, OR 97201
Re: A eland Fire Station
Change Order Cost Proposal #52
DearBob,
The foHowi ng are costs to provide water to the refrigerator ice mal= and the ice machine for I'. We
also include a 4'x Y x 3 1/2" emcnete housekeeping slab fbr the ioe maker-
Refngerataa7 Plumbing )Labor & Matmals
Ice Maching Plumbing Labor & Materials
Concrete House Keeping Pad
A *i* Overhead / Profit
Bond / Insm-mm
$,293.00
242.00
127.40
Sub-Total: $667.00
66.70
18.34
Total Cost: $752.04
Please advise us in writing ASAP if you would like us to pn3ceed with this change. Feel h= to call me
if you have any questims or need additional information-
Steve LHW =Ce
ST /rdh
A,ocepted by
cc: Keith Woodley
rim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.D. Box 609, Ashland, Oregon 97520. 541-482-4098 . Fax: 541-482-4218
OREGON N0.44384, CALIFORNIA NO. 4549600
?2Z, - I E
D
adroit
CONSTRUCTION COMPANY, INC.
April 21, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #53
Dear Bob,
The following are costs to add (1) 5'-0" x 3'-2" tack board in Room #209 as requested.
Tack board materials
Installation labor 1 1 /2 hours @ $46.00 per hour
Adroit Overhead / Profit
Bond / Insurance
$175.00
69.00
Subtotal: $244.00
24.40
5.60
Total Cost: $274.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
cc: Keith Woodley
Jim McNamara
Accepted by
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
April 21, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #54
Dear Bob,
The following are costs to run CAT 5 cable to 7 locations.
Electrical labor and materials
Adroit overhead / profit
Bond / insurance
$584.00
58.40
12.84
Total Cost: $655.24
Please advise us in writing if these costs are acceptable to you. Feel free to call me if you have any
questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashtand, Oregon 97520 • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
3 16:16 UM-U fn C ICAL COHMACT13RS ? 4E05318 M.311 Wl
P.B. Bwx i55s
MileFLmilton ALLEY ELECTRICAL MedW4. CR 97501
5WW HrTs (541] 773-1405
CCD 1S CONTRACTORS, INC. FeY-?7D 2819
PR OPOM
To; i voluum
455 StSIXEM ALVD.
ASKJM, d. 97520
valreyr 6lsctticat col "Clors. Inc. prapoam to hiirliSh the labor and mfterials to accornplish the following.
(Goneral Oazcopriian of Wool
=9 CAT 5 CAM DAY FMS AT 7 LQCATIMS
eJ=W AIM - AMAND, OR 97520 [or Trio
at #55 S
{site 01 ?.of%l
rnmV enSatian as toQowS- WSM-00
The praposW is 7pLasea upon estinla%d quantities for tha wart as forlOwS:
lrr the ewent the Wojed ShHII raquae IM* in C=M of ilia gUantitie6 ob" Sat out, 8nd IFWB is a Iv np MM proposal, entrn
charges shall be mada fwd srr_h addi6onel work at Vm rues then boing ttgulatly charaet1 by Vfd undevdDroetl W satctr items.
P pr.ea small be due an Or bekm '10 dayu after tplrog lb5'&air g comple'bon of tha work. The paM pievaiM9 in arty
*69a arv nrisa our of tiro work, or this agraerrmeM afta1 to emoted in recover avr h aura as the court mQyr adjlydge r9asmnboe
as zftornetr's fees io fr5gathorr-
ii'rie ctuvgen of 1 7A% par wcrv;h {19% annual fseromvage rate] roll bb chaffWd on acenum not paid wigvn 3o days
fouovofts job -Mptetiarr
This pal Is made for acxeptanoe w4hir-34.6a" ACCE ANICE
cmly of the dare hanaaf.
The fomgoing propobal is acceplad This
Dated Ihis 3 ^day of APSTL W 813
of yv 63
SLECT'io" Ci7[+1T?uG7ORS? lm? .?
lAgiY _
.?? Now er4pmd darv*Lve went: and r wwpr ro OWMr vNem .+ CbneM CMD a +wc. Room + f+IrWhMj
T00 in S.LDS.LIHD V SSd +-F-E- fUIDSM V MIA QNV'IHSV 8TC5 881 TVS IVA 9a =9T IIH.L CO/CO/YO
APR-23-2003-WED 04:27 PM ADROIT CONSTRUCTION
i
adroit
CONSTRUCTION COMPANY, INC.
AprA123, 2003
Robert Tbragp
Peckt9mHeylEtWm, Architects
4412 S.W. Corbett
Portland, 412 972011
12c: A,gtal d Fire Station
Change. Order Cost Proposal #55
Dear Bob,
FAX No.5414824218
P. 001/001
The following are costs to add (2) exterior outlets for the ambulauces. Oze located at the generator wall
and one st the Soua bgbt pote in the South parlong lot.
Electrical materials
Electrical labor 6 hours @ $42-41
Subcontractor overhead Iprofit
Admit overhead /profit
Boud I insurance
$265.90
254.46
52.04
Subc uUmctor Total: $572.44
57.24
12.59
Total Cost: $542.23
Please advise us in writing ASAP if you would lake us to proceed with this change. Feel flee to call me
if you have any questions or need additional informadon.
Sinacrely,
Steve Trawr?uce
STJcr
Aocelsbed by
cc- Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY. INC.
P.O. Box 609, Ashland, Oregon 975M • 541-482-4098 • Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA N0. 454960B