HomeMy WebLinkAbout2003-057 CONT Chg Order #7 - Adroit Construction
C H A N G E
o ROE R
PECK SMILEY ETTLIN+
architects
Change Order No.: 7
Date:
21 May 2003
Project:
Ashland Fire Station
Date of Contract:
Owner:
Ashland Fire & Rescue
Contractor:
Adroit Construction
You are directed to make the following changes in this Contract:
ADD work described in the attached COPR #22R,56, 57, 58, 61, 62,63
DEDUCT work described in the attached COPR #59,60,64
10 July 2002
$29,241.64
($2,427.60)
Contract Amount: Add to the Contract Amount the sum of:
Twenty Six Thousand Eight Hundred Fourteen & 04/100.......................................$ 26,814.04
The Contract Time will be changed by .JL days.
The Date of Completion as of the date of this Change Order is
Original Contract Amount
Previous Additions
Total
Previous Deductions
Contract Sum prior to this Change Order
Amount of this. Change Order (Add)
Contract Amount to Date
Ai1c!1
11' /YlA 7 . ~.>
Date
s~t~
CONTRACTOR
~ - L 1-~
Date
J:\99\9924\WP\construction\change orders\c07.doc
$
$
$
$
$
$
$
2,513,093.00
--
82,517.49
~.---_.~~-
2,595,610.49
0.00
2,595,610.49
26,814.04
2,622,424.53
~-'. )
/..tt)t:/~? 0~/"J.4i li.4("-
J ~!
OWNER
,,5~ - ..2 7 - 1 t-z..J)
Date
4412 SW Corbett, Portland, OR 97201
tel 503.248.9170 fax 503.248.0223
www.psearchs.com
1
a
adroit
CONSTRUCTION COMPANY, INe.
April 29, 2003
Robert Thrapp
PeckfSmiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #22 Revised
Dear Bob,
The following are revised costs to excavate and install approximately 40 cubic yards of structural
topsoil as indicated on Sheet R44.
Excavation and structural topsoil
Adroit Overhead I Profit
Bond / Insurance
$2,130.00
$213.00
$46.86
Total Cost: $2,389.86
Please advise us in writing ASAP if you would like us to proceed with this change. This work must
take place while the tractor hoe is still on site. Feel free to call me if you have any questions or need
additional information.
Sincerely,
$.~~
Steve Lawrence
ACCEPTED BY
SLlcr
cc: Jim McNamara
Keith Woodley
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
"
~a
adroit
CONSTRUCTION COMPANY, INC.
April 29, 2003
Robert Thrapp
Peck/Smiley /Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #56
Dear Bob,
The following are costs to brick veneer (2) sides of the wing wall as requested.
Brick labor and materials
Adroit overhead / profit
Bond / insurance
$1,024.00
102.40
22.52
Total Cost: $1,148.92
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
s_~~
Steve Lawrence
S L/ cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
CITY REC0RDER'S COPY
O9~2O~2OO2
Page 1 / 2
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 6O9
ASHLAND, OR 97520
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SISKIYOU BLVD
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
Req. No.:
Dept.: FINANCE
Contact: Keith Woodley
Confirming? No
, , ,Q~anfity, Unit ........... Descr!ption Unit Price ..... Ext. price
THIS IS A REVISED PURCHASE ORDER
BLANKET PURCHASE ORDER
Fire Station Construction 2,513,093.00
I
Bid
: Contract dated: July 10, 2002
Start date: July 20, 2002
completion date: 365 Days (07/20/2002}
Insurance required/On file
Revised purchase order 10-15-2002 23,697.62
change Order No. I '
Add work described in the memos of 15th
i
& 16th of August 2002 & COPR
#1,2,3,4,6,&6A
Revised purchase order 12/05/2002 20,907.81
Chan.qe Order No. 2
: ADD WOrk described in the attached COPR :
#5,9,10R2,11,12R,13R,16 & 17
$22,109.81. DELETE work described in.
the attached COPR #8 & 18.
' 4
, Revised Purchase order 02105/2003 5,2 0.05
Change Order #3
~ ADD work deSCribed in the attaced COPR
#20, 21,24, 25 ,& 26R - $14,007.42.
DELETE Work describe~d in the attached
COPR #19 & 23 - ($8,767.37)
SUBTOTAL
BILL TO: TAX
FREIGHT
TOTAL
ACCOUnt Number Amount , ACCount Number Amount:
E 410.03.43.00.702200 2,622,424.53
Authorized Signature VENDOR COPY
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541 ) 488-5300
VENDOR: 000013
ADROIT CONSTRUCTION, INC
POBOX 609
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Speciallnst:
Unit
Descri tion
Revised purchase order 03/10/2003
Chanqe Order #4
ADD work described in the attached COPR
#28, 30R, & 31 $6,325.87. DELETE work
described in the attached COPR #29
($230.50)
Revised purchase order 3/27/2003
Chanqe Order #5
ADD work described in the attached COPR
#33R,35,36,38,39,40,41,42,43,44
Revised purchase order 05/01/2003
Chanqe Order #6
ADD work described in the attached COPR
#46,47,48,50,51,52.53,54,55.
DEDUCT work described in the attached
CQPR #45
Revised purchase order OS/28/2003
Chanqe Order #7
ADD work described in the attached COPR
#22R, 56.57,58,61,62,63
DEDUCT work described in the attached
COPR #59. 60, 64
BILL TO: Account Payable
20 EAST MAIN ST
541-552-2010
ASHLAND, OR 97520
Page 2 / 2
DATE
09/20/2002
PO NUMBER
03624
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SISKIYOU BLVD
ASHLAND, OR 97520
Req. No.:
Dept.: FINANCE
Contact: Keith Woodley
Confirming? No
SUBTOTAL
TAX
FREIGHT
TOTAL
2 622 424.53
0.00
0.00
2,622.424.53
Account Number Amount Account Number Amount
-/
4 _ O2_r- /
~ ~~~..:1--. /,03
Autho~d Signature
VENDOR COpy
CITY OF
ASHLAND
REQUISITION FORM
Date of Req uest:
OS/27/03
THIS REQUEST IS A:
o Change Order(existing PO # 03624)
Required Date of Delivery/Service:
Vendor Name:
Address:
City, State, Zip:
Phone:
Fax Number
Deliver Location
AnROIT ~ONSTRl J~TION
PO Box 609
Ashland, OR 97520
482-4098
482-4218
Services Only
Description
Total Cost
Solicitation Process:
D Exempt D 3 Written Quotes
(copies attached)
D Sole Source D Invitation to Bid
(copies on file)
Fire Station Construction Project D Less than o Request for
Change Order # 7 $ 26,814.04 $5000 Proposal (copies on file)
Account Number 410-03-43-00-702200
*Please attach the Original signed contract and Insurance certificate.
Materials Only
Item # Quantity Unit
Description
Unit Cost Total Cost
TOT AL COST OF
THE MATERIALS
Account Number
. . . .
--- -- -- -- ------
*Please attach the quotes.
Employee Signature: SupervisorJDept. Head Signature:', L~~ {-- t.J~1i1
NOTE: By signing this requisition form, I certify that the above request meets the City of Ashland Solicitation Process requin ments and can be provided J
when necessary.
G:Finance\Procedure\AP\Forms\Requisition form - Change Order 7
Updated on:07/15/02
"
-a
~~~
adroit
CONSTRUCTION COMPANY, INC.
May 6, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #57
Dear Bob,
The following are costs to install 210 lin. Ft. of standing curb along East Main Street.
Survey
Concrete 7 cubic yards @ $68.00
Concrete color buff 7 cubic yards @ $31.00
Form materials
Labor form / pour / strip / cleanup
Adroit overhead / profit
Bond / insurance
$560.00
$476.00
$217.00
504.00
2,250.00
Subtotal: $4,007.00
400.70
88.16
Total Cost: $4,495.86
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
s~La~.~ ~
Steve Lawrence
SL/ cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
"
-8
~~AZ~
adroit
CONSTRUCTION COMPANY, INC.
May 6, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 9720 I
Re: Ashland Fire Station
Change Order Cost Proposal #58
Dear Bob,
The following are costs to add Sombrero Buff concrete color for the city sidewalk as required by the
City of Ashland.
Concrete color 61 cubic yards @ $31.00
Adroit overhead / profit
Bond / insurance
$1,891.00
189.10
41.61
Total Cost: $2,121.71
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
5~~
Steve Lawrence
S L/ cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
t.'
'CJ
r;=:J /i0 \V7< I?
I ~/~L~~\J 2,
! --( ---
adroit
CONSTRUCTION COMPANY, INC.
May 6, 2003
Robert Thrapp
PecklSmiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #59
Dear Bob,
The following is a credit to delete the concrete apron at the south side of the apparatus bay (approx. 62'
x 9') and the apron at the alley (approx. 6' x 26.5').
Concrete credit 13 1/2 cubic yards @ $68.00
Labor credit 720 sq. ft. @ $.40
($918.00)
(324.00)
Total Credit: ($1,242.00)
Please advise us in writing if you would like us to proceed with this change. Feel free to call me if you
have any questions or need additional information.
Sincerely,
~ Lau~
Steve Lawrence
SLI cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
1;
a
~)A~
adroit
CONSTRUCTION COMPANY, INC.
May 6, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 9720 I
Re: Ashland Fire Station
Change Order Cost Proposal #60
Dear Bob,
The following is a credit to delete (I) Gordan Ray tube heater in the Apparatus Bay as requested.
HV AC labor and material credit
($985.60)
Total Credit: ($985.60)
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
.$k~
Steve Lawrence
S L/ cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, AshLand, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Tuesday. May.06, 2003 721 AM
(~6 ' G-t'-.."" ,', p.01
. '..J l 'v '(~...>,.
~).~ n-'~'\~" .f7
C : (' !) Ul ~=:V ", (/
...........--. '- -:-:-oJ,r U
ROBERT LLOYD SHEET METAL, INC. ~
P.O. Box 307/4485 Independence Hwy. 51, Independence, OR 97351 \:I
PHONE:(503)838-3863 FAX: 838-3964 SERVICE:(503)581-1119
E-MAIL ADDRESS:tlrt-rlsm@qwest.net
Industrial & Commrrtial Shnt Metal - HV AC Systems
Custom Dr." - Stainless Steel - Aluminum Specialties
W ASHJNGTON IItenselROBERLS0990F OREGON lianse#62476 IDAHO Iicense#13061-AAA-4(2,37)
Art Bennett 1-503-838-3964
e
FAX TRANSMITTAL
DATE:
~A~3
TO: /1z?a-rr- ~ ~~...u/f7~ .
ATTN: ~7~C/L/l~~'
,
RE: A~~~'
FAX #:
FROM:
Art Bennett
MESSAGE: ~C- /1'2)NV: / C'..4V ~cL 15~ O/lL- D~-rrlL ~
/
IN Uo TO K/lcl..J 7JL~ ~ s>r~p ~.s.I:- ~~",Jb~ rrk.
3
NUMBER OF PAGES TO FOLLOW:
~'r1\Jun.
A P# D,..,.... ~#
Tuesday, May 06, 2003 721 AM
Art Bennett 1-503-838-3964
p02
05/05/03
13:00
ENERGY SAVING PRODUCTS ~ 5038383964
r-u.546 001
FAX FROM:
ENERGY SAVING PRODUCTS, INC.
10400 SW Tualatin Road · Tualatin, OR 97062
SPECIALISTS IN INFRARED
HEATING SYSTEMS
EXHAUST EXTRACTION
AND HEAT RECOVERY
Fax: 5~692-8031
Phone: 503-692-4664
T oU Free: 800- 275.()778
Northern Washington: 42;.222-6566
Eastern Washington: 509-448-1526
Anchorage: Roth-Sirianni
901-344-9962
TO: Robert Lloyd Sheet Metal
ATTN: Art Bennett Date: 5/5/03
FAX: (503) 838-3964
Pages: Z
Phone: (S03) 838-386J;1ttS011 Including coversheet
FROM: Dennis Reairdon
Message:
Credit amount for returning 1 ea GordonRay 8H-100 from Ashland Fire Station.
Thanks
Tuesday, May 06, 2003 721 AM
Art Bennett 1-503-838-3964
p03
05/05/03
13:01
ENERGY SAVING PRODUCTS ~ 5038383964
NO.54G
~2
~
Bill to:
..H9.~nltQl~.IDJee.LM!t~L..._.._.._...,~._._..____-_._.._
>>~e.5.Jr.KI.eP.iDde.O~..~_~~..5l........._....._....._..._...__.._.
1~.Qe.p-~o.d~Jg,_QB...17.3.s.1_.._... _._...__....._..........__...~
Energy Saving Products, Inc. Mon, May 5. 2003
10400 SW Tualatin Road. Tua.atin, OR 97062. (503) 692-4664 12:58 PM
Return From Customer
Ship to:
].Qbe~JJ9.y.<tS~Mc~L_._.____..__......._.___......_.
4485 Indeand!~.!a~L_......._.__..........._._.._
lriem.eJlC8~a..9I351_....__.___....__.___.._...._
..flQ~~..ug~t._...._........_...,......_........._....._..___.__.___ _ij~ed...y.Q!P__,_._..____.._.__....____._____...___
Ship Via: _....._...._...,.............__..._...._..._ Job Name: }...!blt.np tir.!~~_...._._____._...._.._...._....___
QTY 'art Number D..c:riplion e.eh Price Extnd
...........1. lH~t1'.99.~tt_. ~..nB!l!!.~~lQP..!..NJ\NllL~.li.J!QJ1.J1Bj~.!!.Tube. .... ...D9.:! ..._?.:1Q;..8.9.. .....1_:,.0.60..
PO Hum:
ROBERTlL
._....... ......__.__._.._.~_ M..~!.t!!.!~~ In.~C!R.g~ oriQi"!..<r!.~~____
~..-......... ......--.....-...---.-. _._--_..._--_........-------_......--_....._,---...__...........~-
....-..-..... -..---.--,.".....--..... .....----..._.._~..._....._-.--.........--.._._....-._.-.~..._---_....... ..-.-...-.- ...-......-.- ...............---
........--.. ...........-..,.....-........-.. .---_..-..._._.....-.---....._..........-.._--........-........~_. ...-.-.-..--.. ------... ..".-.....-.-
--...--. .---........--....-...... .........-.............--.---......---.....--------.--.---.-..-.----....... ----.... ------. -.~.
.-..-.--. -.-.--...-.....---. -_.---_....-....-...._--_._-...._--_..~---------
...., _h -..............
T arms: (On approved credit)
Materials retumed from job may be
subject to 15% restocking charge,
TOla': I 730.601
DR
S015.3
Tuesday, May 06, 2003 721 AM
Art Bennett 1-503-838-3964
Change Order Cost Impact
Robert Lloyd Sheet Metal, INC.
P.O. BOI 307/4485 Independence Hwy 51
Independence, OR 97351
(503) 838-3863 FAX (503) 838-3964
Email Addre~s:art-rlsmwest.net
CITY. S1 ATE AND ZIP CODE
WE HEREBY SUBMIT SPECIFICA lION AND ESTlMA TES FOR:
The following charges would apply to the on-site visit with the architect and engineer.
to delete one of the Gordon Ray tube heaters. Below is the credit price
ITEM QTY $/QTY
-4 $65.00
-1 $730.60
-1 $125.00
2 $65.00
Credit Field Labor
Credit Gordon Ray Tube heater
Credit Flue
added field coordination
TOTAL
Excludes: Any and all Framing, painting, patching, electric to fsd's
ThIs proposal IS only good or 30 days. After 30 days, this proposa is no onger valid and subject 10 cost increases.
Paymenl to be made as follows: 30 days, net 0, 12% simple mterest on any amounts over 30 ays.
p.04
The request was
TOTALS
($260.00)
($730.60)
($125.00)
$130.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
. ($985.60)
All material is guaranteed to be as specified. A I work to be compleled In a workmanbke manner
according t(1 standard practices. Any alteration or deviation from above specifications
involving c:" ITa costs will be excuted only upon written orders, and win become an extra
charge over and above the estimate. All 3gretments contingent upon strikes, accidents or delays
beyond our I:ontrol. Owner to carry fire, tornado and other necessary insurance. Our workers
are fully co\oered by Workmen's Compensation Insurance.
Acceptance of Proposal
The above prices, specification and conditions are satisfactory and are hereby accepted.
You are authorized to do the work as specified. Payment will be made as outlined above. Signature
If Ihe proposal is not signed and RLSM is noticed to proceed with the above work, this proposal has been mulually accepled.
Date of Acceptance Signature
a
adroit
CONSTRUCTION COMPANY, INC.
May 7, 2003
Robert Thrapp
PecklSmiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 9720 I
Re: Ashland Fire Station
Change Order Cost Proposal #61
Dear Bob,
We were advised yesterday by the City that the existing 6" drain line for the new catch basin on East
Main Street is plugged and no longer functional. This catch basin is located in a crowned location that
would not catch any water. We are proposing as a no cost change to delete this catch basin and extend
the 6" storm drain piping 52 lin. Ft. to an existing manhole.
Please advise us in writing ASAP if this solution is acceptable. If the catch basin must be retained, our
labor and material costs to extend and tie in the storm drain is $929.00. Feel free to call me if you have
any questions or need additional information.
Sincerely,
~~~
Steve Lawrence
S L/ cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, AshLand, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
>
a
~)X~
adroit
CONSTRUCTION COMPANY, INL
May 7, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S. W. Corbett
Portland, OR 9720 I
Re: Ashland Fire Station
Change Order Cost Proposal #62
Dear Bob,
The following are costs to provide and install Columbia HG5600A2L-02 Electric Hoist. Bare drum line
pull is 5600 pounds. Bare drum line speed is 8 fpm. Cable capacity is 198' of 3/8" wire rope, 40' of 3/8"
stainless wire rope with safety hook and stainless bridle assembly for hose rack included. Includes 2
galvanized 3 ton vertical lead blocks #60 I S. Brake motor is a 1.5 hp 230 V AC 3 phase TEFC rated
continuous use, brake is spring applied and electrically released with an internal drum brake. Controls
are NEMA 4x rated with 25' wall mounted stainless push button control. Includes 2 earn rotary limit
switch for upper and lower limits mounted on the hoist. Optional wash down duty motor and brake.
Sub- Total
$7,350.00
$65.00
N.C.
$7,415.00
$741.50
$163.00
$8,319.50
Coumbia HG5600A2L-02 Electric Hoist with Wash Down Duty Motor & Brake
Shipping
Installation
Adroit Overhead/Profit
Bond & Insurance
Total Cost:
Please advise us in writing if you would like us to proceed with this change. Feel free to
call me if you have any questions or need additional information.
Sincerely,
~--i;:;~
Steve Lawrence
SL/rdh
cc: Jim McNamara
Keith Woodley, Fire Chief
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashland, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
~
a
~~
adroit
CONSTRUCTION COMPANY, INC.
May 13,2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #63
Dear Bob,
The following are time and material costs to excavate soft unsuitable material at the South East Parking
Lot and Alley and replace with compacted 4" shale.
Burl Brim time and material sheets 5/1/03
Burl Brim time and material sheets 5/2/03
Burl Brim time and material sheets 5/5/03
$4,479.94
2,537.43
2,577.82
Subtotal: $9,595.19
959.51
211.09
Total Cost: $10,765.79
Adroit overhead I profit
Bond / insurance
Please advise us in writing if these costs are acceptable to you. Feel free to call me if you have any
questions or need additional information.
Sincerely,
~(~
Steve Lawrence
S LI cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, AshLand, Oregon 97520 . 541-482-4098 . Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
Ma~ 12 03 04:36p
Burl Brim Excavation
15414888353
p. 1
c - . c-l-".
C '. ~ u:... V<:-.
.s-, \ 2- '- ~_--S
~'I~.j~ L. ...J / b.Oflc ,-r .
~.~2.-421?"
1~...",1tA.-\ C> ~t. ~ 'I f(Z '<"),...1
f?eJ \"::>~ T~- f'JI sJ~n_
,--,-~,\-, 1
", ; '...-.-....-.. .'.' \ \'U''''i.
: :..,.....".)
\ r-'~
U
. .'--.... J
. ......./
~ ~~~ -
LJh.1 t. Y T()0~ '- s
~-l-()s
S'L-CD
~.s- o~
4 ,4-. '\ .14-
LS"?Jl,4-3
,
( I ~-rl ,& 2-
-
1. s4S; · \1
~'( D..~\t~'6~ :p~~ ~L-'-_
M \ lQ' US"S1.-JL1
Ma~ 12 03 04:36p
Burl Brim Exeava~ion
15414888353
p.3
P9~
SUBCONT
Job Name:
Extra Work Requestor:
Description of Work:
5-/; /0;2-
,
10\11 }2MJU V1 (0
Relative to the following dircctive(s) by the Owner;
AS/' RF/#
Authorized by Adroit:
LABOR
ceo # RFP#
Date:
DAILY TOTALS
MATERIALS
Material Item(s} Number Unit Price Total Invoice #
- ---.. -- -- ---- ...-- .- -" -- - - -' -' -- -- .- - ..._0- - - -
- --. -" - ---- -" -.- - - -- -" .-' -- .- ....- -.--- -. - - '-' ..---
- .- .--. -.- - - -- -- .- .-' -" --- - -" -" -' - -
-- .- --' -- -- - -- .._'~- ..._...- - ..-' ---._- - -- - --
DAIL Y TOTALS .
-
EQUIPMENT
Equipment Itcm(s) Hours Rate Total Invoice #
-" .-' .--. ....-- -- ..--- -. ....- - -- .~- -- -- .- -. - __-0 ,.- ..--....
1-- ..- -- ---...- -". .- -- ,- -" .--.-.. .-" --- - - .-- .----- .-
- -- - .- - -.-. --- ._- - -- - --- - - -" ..._.- .-'
- .- .-" -- .- ._" .- -- --' .- --. --.. ...-- --' ..- ._-- -- -"-
OAIL Y TOTALS
This work was completed as witnessed by me:
Adroit Project Superintendent: Date:
NOTE: Signature by Adroit Project Superintendent is not ::In acknowledgQment or ~cceptance of cos~.
D Job Complete D More work to Signature;
perform Authorized Subcontractor Representativ~
Forword all signed Time & Materials Daily Work Record(s) to: Adroit Proiect ManaQer upon completion of the work.
All Time and Materials Daily Work Records must be accompanied by Material Invoice Copies, Rental Receipt Copies,
Workmen(s) Pay Rate as authorized by the Contract Documents for the Project or pre-3rr~nged with Adroit.
ALL T & M DAIL Y WORK RECORDS ARE TO BE SIGNED BY ADROIT PROJECT SUPERINTENDENT DAft Y.
A SIGNED COpy BY ADROIT PROJECT SUPERINT~NDENT WILL BE ISSUED TO YOUR FOREMAN EACH DA Y.
DO NOT FORWARD THESE FORMS WITH YOUR MONTHL Y BILLING INVOICING a) ~ 9~
CQ I J,..?ta~ ~ '/1_0 -!U lL~ -
Ha~ 12 03 04:37p
Burl Brim Excavation
15414888353
p.4
Burl Brim Excavation.ln~ f8 I
SUBCONTRACTOR TIME & MATERIALS DAILY WORK RECORD
Job Name:JJ$-lj Cc.-' lei' E;;.,- ~ ;-V~ ,f/~;j _ Date:~.;:.r -LJ"3
Extra Work Requestor: ~ (Lr / <!!J r./~';' Cy~ ~ t"/LP.~ /~Al
?escriPtion of W.Ork:Ol/ ~ r'- p.;( ~CA.4/~ ~h,J ~~;-.y- A/~ ~';", _ ~~
Ct' /' / ~ <' ?<J 17- L... </ <'ft" ;'41 ~~~ r ;J
Relative to the following directive(s) by the Owner:
A~# RR#
Authorized by Adroit:
LABOR
CCD#
RFP#
Date:
Workmen 5 Name Classification Hrs Pa' Rate
~r~fl.<lb.e.r>e!u<l CJe~::;:J:,P-e.nc:...~ 348,/
,'...~_-~d/jjrt, _ . __6~~~c:.'v"G., ?3~.IB
. ~~._ E~~rfo~~vG.- .. .'G::<d~~='/.;~~ 24....dO. lJ.Q
.._.~~,4___-- .._'" _ ,.e .__..___ _._......_ _ c.~ dO. tJo
". . ~f \ ' L,. IS ~o, 00
DAfL Y TOTALS
MATERIALS
Material Item s
Number
Unit Price
Total
Invoice #
hi Jr ,i;';~---' ~~-Id'---. 'S:- 50' .-----}4o -:q'- "--~~ry'-
.._._...../~ ~___ . ...0 _.a.~....- u- ., ..--- -. -.. 7 j
~ , - ......
/.I;;~Lff~L-;r.. j3--- a~:&<TY---. -iJ.-..
.. ~..._.__._- ~---1. ---.- - .---...--- ... _.._5 l_._.___..
DAILY TOTALS
EQUIPMENT
Hours Rate Total
r2,_S.- ._. / (),Oh.... .. ~{)~. .S
. .__. ~. 2__ . l/j]1.rt.D..q. 1 0 0 . 00
C1-tddLA-~/-_""---~/~~ a. - . . ~ . . . 70.00 .. }9; 0 · 0 O'
7r~~k'.<~~ ~~_:_"-\ I.). .. _3:.cfJ_d_" 55.Q_o ~~ ,So
Invoice #
).n O~ ex
J:hd '71 ~ EJ<
{t , 1
(J~ ~ l.f 'tJ-!3fI ~
DAILY TOTALS
This work was completed as witnessed by me:
Adroit Project Superintendent:
NOTE: Signature by Adroit Project Supe~nlendent is not an acknowledge
D Job Complete IVl More work to Signatu'
~ perform hori,t: Sub 0 tractor Representative
j;orward all signed Time & Materials Daily Work Record(s) to: Adroit Proiect ManaQer upon completion of the work.
All Time and Materials Daily Work Records must be accompanied by Material Invoice Copies. Rental Receipt Copie!\.
Work.men(s) Pay Rate as authorized by the Contract Documents for the Project or pre-arranged with Adroit.
ALL T & M DAIL Y WORK RECORDS ARe TO BE SIGNED BY ADROIT PROJECT SUPERINTENDENT DAIL Y.
A SIGNED COpy BY ADROIT PROJECT SUPERINTENDENT WILL BE ISSUE;O TO YOUR t=O~EMAN EACH OA Y.
DO NOT FORWARD THESE FORMS WITH YOUR MONTHL Y BILLING INVOICING
..JIr I /1 1/"),-/....
Ma~ 12 03 04:37p
Burl Brim Excavation
15414888353
p.5
Burl Brim Excavation. Inc. p q ;(
SUBCONTRACTOR TIME & MATERIALS DAILY WORK RECORD
Job Name:~~ it: L a ~~ ~ .,c, ~~ ~ ~ l'~ AJ Date:~ - Z 0;) $
Extra Work Requestor. 13 i~'; L B r /~ ~ K~
DescriptionotWork:(j,/Lr ~?'ek.u-C'Pt~ ~f- ./l~.r~~~ ~+
'" \L!:z r · , 7=
r~ p ~ C-~ '--' I #- ~" ~~..u.U ~ .-.
. .
Relative to the following directive(s) by the Owner:
AS/# RFI#
Authorized by Adroit:
LABOR
CCD#
RFP#
Date:
Workmen $ Nclrlle
~d._S/~~~6Ie
~.L}...lj-~-,=-l_. _
.---... - --- f . - ....-. -
Classification
Hrs
Pay Rate
dO, (}O
JJL/, qL/
Pa Tolal
;<0,00
/S 7,;;3
.4,.S
._J ..
DAILY TOTALS
MATERIALS
Material Item s
~" /')-f ~./ S
3/ ,'i"~-O <--------
. '::I .. ......_ "'. ... ._ _. .... ----. .
Number Unit Price Total
.. -:f?2I2&I. _?~ro--- l(pfl.-<-5. .
nfp3Ltt.~[ .5,..... _. 3~.tl._tJ.I
1 nvoice #
DAILY TOTALS
EQUIPMENT
Hours
Rate T otaf
$5.DO =:>30 I OD
. -. ~ ...... .
. - j~',~O ')~~'1g ...
I
....~.:;.~~ --...
DAILY TOTALS
This work was completed as witnessed by me:
Adroit Project Superintendent: Date:
NOTE: Signature by Adroit Project ~uperintendent is not an acknowledgement or acceptance of costs.
D Job Complete D More work to Signature:
perform Authoriz.ed Subcontractor Rt::fJl e~enl~(jve
Forward all signed Time & Materials Daily Work Record(s) to: Adroit Project Manaaer upon completion of the work~
All Time and Materials Daily Work Records must be accompanied by Material Invoice Copies, Rental Receipt Copies.
Work.men{s) Pay Rate as authorized by the Contract Documents for the Projecl or pre-arranged with Adroit.
ALL T & M DAILY WORK RECORDS ARE TO BE SIGNED BY ADROIT PROJECT SUPERINTENDENT DAfL Y.
A SIGNED COpy BY ADROIT PROJECT SUPERJNTENfJFNT WILL BE ISSUED TO YOUR FOREMAN EACH DA Y.
DO NOT FORWARD THESE FORMS WITH ~ y~U~ MON~~LY ~/L~/NG 'NV~/C/~;. ~., 1 "...&. 'J
Ma~ 12 03 04:37p
Burl Brim Excavation
15414888353
p.6
Burf Brim Excavation, tOf!
SUBCONTRACTOR TIME & MATERIALS DAILY WORK RECORD
Job Name:JjJ- if ~..J cI ,c / trl:r S -In / J~ ~.J Date 5-, 'T'??
Extra w~~ ReqUestor~ B U f' I ~ yo, ~ F V. ~ IL1I' ~-1:' ;f .
Descnptlon of Work. f I~ ~ ~ ~ t ~~.r A/ ,,~<:. / "I /'pfl!-. ~ ~- , A./ tf /-0 +-
5~b9/~d~ .
+0
Relative to the following direct;vc(s) by the Owner;
ASI# RFI ##
Authorized by Adroit:
lABOR
ceDI
RFP#
Date:
Classification
Hrs
Pa Total
I}~/~ -
-~---
/30. 0 0
_Jlo, 00 ~
5
CAlLY TOTALS
MATERIALS
Material Item s
5 .~(.L/~.LLJ;_.
Number Unit Price
q ..J3T~~Q. _
Tolal
Invoice #
DAILY TOTALS
EQUIPMENT
Hours
Rate :
Invoice #
CAlLY TOTALS
This work was completed as witnessed by mp.:
Adrol Project Superintendent Date:
NOTE: S' ature by Adroit Project Superintendent is not an acknowledge
Job Complete D More work to Signature.
perform Ii.. orized Sub n ractor Representative
r-orward all :>>igned Time & Matelials Daily Work Record(s) to: Adroit Proiect ManaQer upon completion of the work.
All Time and Material6 Daily Work Records must be accompanied by Material Invoice Copies. Rental Receipt Copies,
Workmen(s) Pay Rate as authorized by the Contract Documents for the Projp.t':t or pr~-arrangGd with Adroit.
ALL T & M DAIL Y WORK RECORDS ARE TO BE SIGNED BY ADROIT PROJECT SUPERINTENDENT DAIL Y.
A SIGNED COpy BY ADROIT PROJECT SUPERINTENDENT WILL BE ISSUED TO YOUR FOREMAN EACH DA Y.
DO NOT FORWARD THESE FORMS WITH YOUR MONTHL Y BILLING INVOICING
dB !)C;;'7r1 q:l
MAY-14-2003-WED 04:10 PM ADROIT CONSTRUCTION
FAX No. 5414824218
P. 001/001
J'
I
a
adroit
CONSTRUCTION COMPANY, INC
i....:..1. .. ".
May 14, 2003
Robert Thmpp
PecklSmiley~ Arcb.itect5
4412 S.W. Cotbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #64
Dear Bob,
The fullowing is a credit to cl1ao.ge the bi- fold 1nsh enclosure gate to double swing gate and add (2) gate
posts as discussed at ourjobsite meeting.
---:
Gate Credit
($200.00)
Total Credit: ($200.00)
Please advise U5 in writing ~ if you would like us to proceed with this change. Feel free to call me
if yon have any questions or need additional information.
Sincerely,
~~
Steve Lawrence
SUer
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P~o. Sol( 609, Ashland.. Oregon 91520 . 541-482-4098. Fax: 541--.4&2-4218
OREGON MO. 44384. Od..lFOR.UA NO. 454960B