CONTRACT CHANGE ORDER NO. 1
PROJECT:
LOCATION:
8TH STREET SIDEWALK CONSTRUCTION
8TH ST, E. MAIN ST. TO A STREET
DATE: JUNE 24, 2003
PROJECT NO.: 02-26
CONTRACTOR: VERSATILE CONCRETE INC.
You are requested to perform the following described work upon receipt of an approved copy of this document
or as described by the Engineer:
Item No. Description Quantity Unit Price Amount
CO 1 Additional construction quantities Lump sum $865.00 $865.00
(see attached final payment schedule)
Original Contract Amount
Total this Change Order
Previous Change Order
Revised Contract Total
$32,593.25
$865.00
$33,458.25
The time provided for completion of this contract is increased by no calendar days. This document
shall become an amendment to the contract and all provisions of the contract will apply.
Engineer
&/Z~/Q3
Recommended By:
Date
Approved By:
~/2-sla3
Accepted By:
Engineer
~T ~A-'/
Contractor:
Patrick Harney
Versati Ie Concrete Inc.
PO Box 507
Talent OR 97504
Date
G-2.5-O!
Date
ENGINEERING
20 E. Main Street
Ashland, O~on 97520
www.ashland.or.us
\\COMPAQ1\DA T A\GOV\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2002\02-26 Ch Od 1.doc
Tel: 541-488-5347
Fax: 541-488-6006
TTY: 800-735-2900
r.,
8TH STREET SIDEWALK CONSTRUCTION PROJECT
PROJECT NO. 02-26
Final Payment
Item Estimated Final Unit Price
No. Item (Unit Price Dollars) Quantities Quantities (Figures) Amount
1 Move in & final cleanup for Lump Sum Lump Sum $ 1,500.00 $ 1,500.00
2 Temporary protection and direction of traffic for Lump Sum Lump Sum $ 1,200.00 $ 1,200.00
3 Saw cut pavement for 111 LF 85 LF $ 1.00 $ 85.00
4 Remove existing pavement for 105 SF 425 SF $ 3.00 $ 1,275.00
5 Install AC pavement for 105 SF 2 SF $ 7.00 $ 14.00
6 Install concrete sidewalk (4 inch thickness) for 3726 SF 4405 SF $ 3.75 $ 16,518.75
7 Remove concrete curb & gutter for 140 LF 174 LF $ 5.00 $ 870.00
8 Construct concrete curb & gutter for 162 LF 174 LF $ 15.00 $ 2,610.00
9 Remove concrete sidewalk for 55 SF 65 SF $ 2.50 $ 162.50
10 Remove & replace signs for Lump Sum Lump Sum $ 300.00 $ 300.00
11 Install handicap ramp for 2 EA 2 EA $ 700.00 $ 1,400.00
12 Install residential driveway apron (6 inch thickness) for 1043 SF 996 SF $ 4.25 $ 4,233.00
13 Adjust water meter for 2 EA 3 EA $ 30.00 $ 90.00
14 Remove existing stump/rework existing fence and rock wal Lump Sum Lump Sum $ 3,200.00 $ 3,200.00
Final Cost $
33,458.25
PLf..J3-*SL t2.u.--6#
ZF .oo&SI6LL
I CITY OF I
ASHLAND
Public Works - Engineering Division
Date:
To:
From:
Re:
Payment Memorandum
June 23, 2003
Veronica Vlach ;,u
James H. Olson, Project Manager
FIRST & FINAL PAYMENT FOR TH . STREET SIDEWALK CONSTRUCTION
PROJECT NO. 02-26
Mr. Pat Harney of Versatile Concrete Inc., has requested a final payment for work completed on the 8th Street
Sidewalk Construction Proejct. This payment is also the first payment made on the project.
Please make payment as follows:
Contractor: VERSA TI LE CONCRETE I NC.
PO BOX 507
TALENT OR 97540
8TH STREET SIDEWALK CONSTRUCTION PROJECT
2002-26
Project Title:
Project No.:
Purchase Order:
Account No.:
Retainage
Contract Amount:
Change Order $
Revised Contract:
260.08.12.00.704200 (To be reimbursed thru CDSC funds)
0% (Contract is complete)
$32,593.25
865.00
$33,458.25
COST ALLOCATION
TOTAL PAYMENTS Te CURRENT AMOUNT
DESCRIPTION COST TO DATE DATE DUE
COSTS $ 33,458.25 $ - $ 33,458.25
RETAINAGE $ - $ - $ -
Totals $ 33,458.25 $ - $ 33,458.25
I CONTRACT AMOUNT REMAINING I
% Complete
$33,458.25 Contract Total 100.0%
$ 33,458.25 - Paid to Date
$0.00 Amount Remaining
Please Pay:
$
33,458.25
CC:
Pat Harney
Roger Balbo
Paula Brown
I'~'I
Brandon Goldman
G:PubWorks\Eng\DeptAdmin\Engineer\Project\02-26 Versatile Concrete Payment l.xls
8TH STREET SIDEWALK CONSTRUCTION PROJECT
PROJECT NO. 02-26
Final Payment
Item Estimated Final Unit Price
No. Item (Unit Price Dollars) Quantities Quantities (Figures) Amount
1 Move in & final cleanup for Lump Sum Lump Sum $ 1,500.00 $ 1,500.00
2 Temporary protection and direction of traffic for Lump Sum Lump Sum $ 1,200.00 $ 1,200.00
3 Saw cut pavement for 111 LF 85 LF $ 1.00 $ 85.00
4 Remove existing pavement for 105 SF 425 SF $ 3.00 $ 1,275.00
5 Install AC pavement for 105 SF 2 SF $ 7.00 $ 14.00
6 Install concrete sidewalk (4 inch thickness) for 3726 SF 4405 SF $ 3.75 $ 16,518.75
7 Remove concrete curb & gutter for 140 LF 174 LF $ 5.00 $ 870.00
8 Construct concrete curb & gutter for 162 LF 174 LF $ 15.00 $ 2,610.00
9 Remove concrete sidewalk for 55 SF 65 SF $ 2.50 $ 162.50
10 Remove & replace signs for Lump Sum Lump Sum $ 300.00 $ 300.00
11 Install handicap ramp for 2 EA 2 EA $ 700.00 $ 1,400.00
12 Install residential driveway apron (6 inch thickness) for 1043 SF 996 SF $ 4.25 $ 4,233.00
13 Adjust water meter for 2 EA 3 EA $ 30.00 $ 90.00
14 Remove existing stump/rework existing fence and rock wal Lump Sum Lump Sum $ 3,200.00 $ 3,200.00
Final Cost $
33,458.25
~'ts.~,t~ Cts~G\f~-\e
9.0.. \[Sox SO.l
~\..e.~ ~~~ '1i $L(b
6550
INVOICE
NAME:
or
ADDRESS:
CITY, STATE, ZIP
CUSTOMER'S ORDER: SOLD BY: TERMS: SHIPPED VIA: F.O.B.: DATE:
~l1~_ \ \I\. t:.\ \AO.... \ 0 \..c>a V\. \. 1 l() J. 560 -
.-t- -e.- w'"-o P \r o.....\(CA ,., \ft1Lt. tr- ~~ l- - j '..hi/"\. I
J '20eJ .--
, " .:r A' \)~ ' 'F-I-' ... I 00
~ c:..o" c~ <XC: L.. . ~s
R-o \N'-..r\\ , 0 A <2-- 4o~< Q6f} ~(j) I '00 -
'~..o \N\ ('\.. I n lAc , G'7S aD
LI<::.,x, o 2.~ SC)'
r~~~~\.\ ~C- 011 u';. \.- ^ "2- <::...r~) I f /1./ "u
RIJ.\ ~o ~ \J..~~y \M~..~ -~^~lf ~ /L ql) 00
Y.Lf . -
OA' ~... " ~- ~ f:"')\t.l ~ 1""< )C < ~ 1 ~"r LL Jb t:C ~ )(~)( I/oh 2.S
(I? ,... i "'""- \ " Jr r& ~//I r.~ - I
<:::'..:, 0 V\ C ~OO -
(~\hC.L. T ,- (1~..P f l' \~a \\1' Ra W\~s. ~ I J I../()O i---
-2 (l)~ 1
1'0\0.._\ ...N'\ Q..J:)",^~\\.J ~ r' i. \~ L ~ /,,\ .,.j~v- '", ~~ 1Pa rtO. a: n .01. ~A. ()cJ
I '7 J.I L J "T. "'\1 J
rr ;\Oft'S .. ...., A- ~~ u+l~v rL Q~ ~/IJ ()D
CcJh <:::...4~ C-.d \I b /'7t.1 L -
~ It DJY\CJl'€f~ ,
I ./ M-r Or ~ .Jt? t~1Cl U <:
J 9q~ S ('"';j I I) r/';. ~I" ...... ~:233 ----
- / ,
if II r--lfY"\ rv~t~ s: cJ.. (:> f L 3a \ k. ~
'~/~a SO'nF LIlt CoV\CJ.r-~~ lJ..YA\~- IiI, /7S de
~
, . .
. I A
':{...1.ev..,\ "$.\- 111 ~~\f(\.t)~c... ~~~ vV'\~
R..e. ~JL ~ ~u..... \s- f?ac~ ~\\ 2.. 2.tO .'-
Jib -" ' --~ ')
.L...
.-liI!:" J, ",.., "r
p{;V ~~ ~) W~~\ Q.., "^~\ \(" ~VV\.{' Lt~~ ~ s...\-. t) 1Z L..I!. 1 CD 7tXJ .,., ~
J:""},. ~. -~ - ).. 7 r 1f'V\ ur t? J--D If? ~, ,a... \ s,. e C/rd t nk LlA FeoltJl n 1-(5 '~L1 ,-.
. .
. ~ \... 1-'" VVL '-'C. - .,.-/'
\ I -
\1 I fL .~ Pfi o F- 5 I uJC\.\ K L~. -
r, ~+ tA\I\r\ 1_ '\ +\'\. '\ CA.. u.. \uU sr; rJ .a' ~,aJ
) 1Via I f)-J A. ( (<) :1...':::> --
.~ /, UQ;.l ~
.... ...... ., . ,.
INVOICE
7L738 02001 REDF<R1@
~~488~7D
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541 ) 488-5300
O4~22~2OO3
II
Page 1 / 1
PO NUMBER
04099
VENDOR: 001079
VERSATILE CONCRETE, INC
P O BOX 507
TALENT, OR 97540
SHIP TO: Ashland Public Works
(541) 488-5587
27-1/2 N MAIN STREET
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date:
Special Inst:
Req. No.:
Dept.: PUBLIC WORKS
Contact: Paula Brown
Confirming? NO
· ·Quantity Unit Description Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER
: 8th Street Sidewalk Construction · : 32,593.25'
· . Proiect 02-26
BID
·
· . .. .Be.qinnin.q Date: March 17, 2003
Completion Date: June 1,2003
" Insurance required/On file '
Revised purchase order June 27, 2003 865.00
Chan-qe Order No. 1
Additional Quantities
·
: . ·
· :
·
· .
.. .
· .
· . :
SUBTOTAL 33,458.25
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 33,458.25
A~I II A ~.11--~ ~'--~ ~'-~-'~'~A
ASHLAND, OR 97520
Account Number Amount Account Number · Amount :.
260.08.12.00.704200 33,458.25
Autl~_~ed~Signature
VENDOR COPY
TO:
/(ar; ()/~
DATE : f~~
PROJECT: P1.J. -S "Ii. 6& Pr~J'
JOB NO.: ~ 'Z ' ~ ~
SUBJECT: P! t'J t1r"(~Wl~n-f5
THE FOLLOWING ITEMS ARE BEING SENT TO YOU:
/. O./(!jll?(:ij chonr ar",h,.. J1tJ, L
t. ~f"7.:slh(fr\ ./1;rh'J /b", hYJ4/ fJt/!J/HR'~ ~
()"6~A~ CR1-?r;-rzft Gi) ~ 3"3, 4S/r.~
B COeJ 08 j?J6(jnzenJ nu?h7/J
ENCLOSED ~
UNDER SEPARATE COVER
REMARKS: ~ pmmLJJ aL:hV'Y7 . UlC/lJI':/ br? tJ/Z'P~
~rH"";~_ _ '
COPIES TO: :yC!:,~J(i B. }
Uer/J);?/~
Department of Public Works
Engineering Division
By: James H. Olson
Title: Assistant City Engineer
(c:\engineer\nottrans.blk)
CITY OF
ASHLAND
A request for a Purchase Order
REQUISTION FORM
Date of Requestl 6/24/031
THIS IS A REQUEST FOR A:
[X ] Change Order (existing po#i{)99>
Required Date of Delivery/Service!ASAP
Vendor Name: VERSATILE CONCRETE INC.
Address: PO BOX 507
City, State, Zip TALENT OR 97540
Phone:
Project Title: 8TH STREET SIDEWALK CONSTRUCTION PROJECT
Project Number: 02-26
Services Only Solicitation Process:
[ ] Exempt [ ] 3 Written Quotes (copies
attached)
[ ] Sole Source [ X] Invitation to Bid (copies on
file)
[ ] Less than $5000 [ ] Request for Proposal (copies
on file)
Description Total Cost
8th Street Sidewalk Construction
Additional Quantities
Account Number
260.08.12.00.704200
Account Number
Employee Signature:
NOTE: By signing this ,.,
Supervisorl Dept. Head Signature: .
certify tha the above r;equest meets with Ctiy of Ashland Solicitiation Process r;equiremen
G: Pubwrks\Eng\02-26 Requisition Change Order No 1.xls
Updated on 7/15/02