HomeMy WebLinkAbout2003-120 CONT Chg Order #1 - Trinity Excavate CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. I PROJECT: LOCATION. CONTRACTOR: ASHLAND AIRPORT TAXILANE CONSTRUCTION ASHLAND MUNICIPAL AIRPORT TRINITY EXCAVATION DATE: JUNE 25, 2003 PROJECT NO.: 2001-08 You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the Engineer: Item No. .Description Quantity Unit Price Amount CO 1-3 Additional excavation 3106 CY $1.50/CY $4,659.(~0 CO 1-4 Additional compacted fill 525 CY $1.50/CY $787.50 CO 1-5 Additional aggregate base course 68.92 CY $25.00/CY $1,723.00 C'O 1-8 Additional 12 inch storm drain 240 LF $20.00/LF $4,800.00 CO 1-10 Additional area drains 3 Each $1,000.00/Ea. $3,000.00 CO 1-Ex.~ Remove and replace subgrade 306.05 Tons $22.00/Ton $6,733.10 Original Contract Cost Total this Change Order Previous Change Order Revised Contract Total $135,490.00 $21,7O2.6O $o.oo $157,192.60 The time provided for completion of this ~contract is increased by twenty calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply. Recommended By: Approved By: Accepted By: Trinity Excavati~ Dan Thomas ~ 897 Oak Knoll Drive Ashland OR 97520 Date Date Date ENGINEERING Tel: 541-488-5347 20 E. Main Street Fax: 541-488-6006 Ashland, Oregon 97520 TTY: 800-735-2900 www.ashland.or, us G:~ub-wrks~eng\dept-admin\ENGINEER\PROJEC'R2001\01-08 Ch Od 1 .doc Memo CITY OF -ASHLAND Date: From: To: Re: June 30, 2003 Paula Brown (~)7~ James H. Olson "~ ~ FINAL COST FORITHE AIRPORT TAXILANE CONSTRUCTION PROJECT NO. 01-08 Attached is the change order for the final project closeout for Project No. 01-08. Dan has yet to install one additional area drain and some remedial work. This cost is a final cost as the additional drain is included. The total final cost is $157,192.60 which is $21,702.60 over the bid (16% increase). The project is still under my original estimate of $159,330.00 and is well within the budget set for the project. Extra costs result from the following conditions: . o . Additional excavation and fill quantities resulting from a re-calculation of the area using digital terrain modeling. The aggregate base course was 68 cubic yards higher than originally estimated as the course was extended to the retaining wall and some additional crushed rock was used to provide a smoother slope over rough rock excavation areas. The length of the storm drain was increased and additional area drains added to provide improved safety along the taxiway. An area of soft sub-grade was encountered near the point of connection between the taxilane and taxiway. The soft material was excavated and replaced with geo-fabric, 4" shale sub-base and 3A"- 0" crushed rock base. Following the final completion and acceptance of the project a final payment will be made along with a final engineering report for ODA. ENGINEERING DIVISION Tel: 541/488-5347 20 E. Main Street Fax: 541/488-6006 Ashland OR 97520 TTY: 800/735-2900 www,ashland.or, us G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT~2001\01-08 Final Cost Evaluation Memo.doc Public Works - Engineering Division Payment Memorandum Date: To: From: Re: June 25, 2003 Veronica Vlac~ JamesH. Olson ~ /// PROGRESS PAYN~N~O. PROJECT 01-08 4 FOR THE ASHLAND AIRPORT TAXILANE CONSTRUCTION Dan Thomas of Trinity Excavation has requested a fourth progress payment for services rendered in the construction of the Ashalnd Airport Taxilane Construction Project. Please make payment as follows: Contractor: TRI N ITY EXCAVATION 897 OAK KNOLL DRIVE ASHLAND OR 97520 Project Title: Project No.: Purchase Order No.: Account No.: Retainage: Contract Amount: Change Orders: REVISED CONTRACT: ASH LAN D AIRPORT TAXI LANE CONSTRUCTION 2001-08 3678 260.08.00.00.704200 5% (Reduced to 1% with Payment 4) $ 135,490.00 $ 21,702.60 CO#1 $ 157,192.60 COST ALLOCATION ,,,, TOTAL PAYMENTS CURRENT AMOUNT DESCRIPTION COST TO DATE TO DATE DUE COSTS $156,1921~0 $ "'99,939.50 $56,253.10 RETAINAGE $1,561.93 $ (4,996.98) $3,435.05 $154,630.67 $ 94,942.53 $52,818.05 *Payment includes retainage release of $3,435.05 Please Pay: $52,818.05 AMOUNT Percent REMAINING Complete .,, $157,192.60 99.4% '$156,192.60 $ 1,ooo.oo, ] CC: Dan Thomas Paula Brown Roger Balbo G:PubWorks~ng\DeptAdmin~Engineer~°roject\01-08 Trinity Payment 4.xls 4. , , ~l~ I I~ I~ I~ ~ Iml I I ,I,,I I , b ~ , , ~ I I~1 ,1~1 I I ~ " ~1~1~1C ~ ~ ~'~'~1~'~11 I~ , ,, CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541 ) 488-5300 OiTV RECORDER'S DATE 0/17/2002 Page 1 / 1 PO NUMBER. 03678 VENDOR: 004346 TRI N ITY EXCAVATION 897 OAK KNOLL DRIVE ASHLAND, OR 97520 SHIP TO: Ashland Public Works (541) 488-5587 27-1/2 N MAIN STREET ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: 10/11/2002 Special Inst: Req. No.: Dept.: PUBLIC WORKS Contact: Paula Brown Confirming? No .' QUantitY · unit., ....... Descriptip,n' .... Unit Price Ext. Pr!ce' ..... '. THIS IS A REVISED PURCHASE ORDER · .. · : BLANKET PURCHASE ORDER .. .. Ashland Minicipal Airport Taxilane 135,490.00 : ... . . · :' .. 'wrolec['u]-u~"' ' '"'-"" · ' .... .. . . · Bid · · : :. . . · . . . .. . .. . · : · . . . Contract start date: October 11,2002 Completion date' May 31,2003 ....... ' Insurance required/On file · .. · Revised purchase order 07/07/2003, 21,702.60 .. Chan.qe Order N°. .1 : . Additional excavation, backfill, . · ' stormdrain work .. . · . . . . . .. :.. : · : . . · . . . . : · : : .. ...... . . . . .. · . .... · . . . .. : . . . . . . . .... .... :: · ... · . . . .... . .. . . . . . . . . SUBTOTAL 157,192.60 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 IOIAL 157,192.60 ASHLAND, OR 97520 ' ' AcCount Number '. · Amount · Account Number '" ..." .AmOunt E 280.08.00.00.704200 157,192.60 ~ ~d Signature VENDOR COPY A request for a Purchase Order REQUISTION FORM CiTY OF -ASHLAND THIS IS A REQUEST FOR A: [ X ] Change Order (existing PO# 3678 ) Required Date of Delivery/ServicelASAP I Vendor Name: TRINITY EXCAVATION Address: 897 OAK KNOLL DRIVE City, State, Zip ASHLAND OR 97520 Phone: Project Title: ASHLAND AIRPORT TAXlLANE CONSTRUCTION Project Number: 2001-08 Solicitation Process: [ ] Exempt [ ] 3 Written Quotes (copies attached) [ ] Sole Source [ X ] Invitation to Bid (copies on file) [ ] Less than $5000 [ ] Request for Proposal (copies on file) Services Only Description Total Cost Ashland Municipal Airport Taxiway Construction $ 135,490.00 Original Contract Cost Additional excavation, backfill, stormdrain work $ 21,702.60 Change Order No. 1 $ . Prior Change Orders $ 157,192.60 REVISED CONTRACT Account Number 260.08.00.00.704200 *Please attach the Original signed contract and Insurance Certificates. Account Number EmployeeSignature:th~~tii~~,~ Supervisor/Dept. Head Signature: NOTE: By signing on form, I ~rt}1~tt~a the above request meets with Ctiy of Ashland Solicitiation Process requi ~tsts ~nd~nd c~can be provided when necessary. G:Pubwrks\Eng\01-08 CO 1 req.xls Updated on: 7/15/02