CHANGE ORDER
Change Order No.: 8
Date: 24 July 2003
Project: Ashland Fire Station Date of Contract:
Owner: Ashland Fire & Rescue Contractor:
10 July 2002
Adroit Construction
You are directed to make the following changes in this Contract:
ADD work described in the attached COPR #65, 68-71, 72R, 73, 76-78, &60
$17,211.60
Contract Amount: Add to the Contract Amount the sum of:
Seventeen Thousand Two Hundred Eleven & 60/100 ................................... $ 17,21160
The Contract Time will be changed by 0 days.
The Date of Completion as of the date of this Change Order is
Original Contract Amount $ 2,513,093 00
Previous Additions $ 109,33153
Total $ 2,622,42453
Previous Deductions $ 000
Contract Sum prior to this Change Order $ 2,622,42453
Amount of this Change Order (Add) $ 17,211 60
Contract Amount to Date
$ 2,639,63613
Date
CONTRACTOR
'-7- o-o3
Date
/ToowNER
Date
J:\99\9924\WP\construction\change orders\co8 doc
4412 SW Corbett, Portland, OR 97201
tel 503 248 9170 fox503 2480223
adroit
CONSTRUCTION COMPANY, INC.
May 28, 2003
Robe~ Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashlaud Fire Station
Change Order Cost Proposal #65
Dear Bob,
r]['he following are costs to provide and install (2) 6 foot wide by 4 foot tall coiling roll up doors with
standard prcfinished while color.
Door labor and malerials (2) 0q $475.00
Adroit overhead / profit
Bond / insurance
$950.00
95.00
20.90
Total Cost: $1,065.90
If other standard colors are desired, add $112.00 to the above price. Please advise us in writing ASAP if
you would like us to proceed ~vith this change. Feel free to call me if you have any questious or need
additional in formation.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodlcy
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
I~O. Box 609, AshLand, Oregon 97520 ,. 541-482-4098 · Fax: 541 482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
June 5, 2003
Robeil Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Porlland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #68
Dear Bob,
The fbllowing arc costs to set up, pour, and finish a 6" thick concrcle drivexvay with #4
rebar 24" oc each way on the North side of the building in lieu of asphall paving.
Concrete 58 cu yd
Misc M at erials/cure/dobics
Rebar
I,abor
Asphalt paving credit
Adroit overhead/profit
Bond/Insurance
Sub Total
Sub Tolal
Total Cost
Please advise us in writing if you would like us to proceed with this change. Feel free 1o
call me if you have any questions or need additional information.
Sincerely,
$4,147.00
$291.00
$595.00
$4,416.00
$9.449.00
($2,500.00)
$6,949.00
$694.00
$153.10
$7,797.00
Steve Lawrence
SL/cr
cc: Keith/Jim
Accepted by:
A D R 0 IT C 0 N ST R U C TI 0 N C 0 M PA N Y, I N C.
P.O. Box 609, AshLand, Oregon 97520 · 541-482-4098 · Fax: 541-482 4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
June Il, 2003
Robe~Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Po~land, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #69
Dear Bob,
The following are costs to provide and install a sheet melal prefinished angle at the exterior North and
South xvalls of the Apparatus Bays to cover up the bird holes left by the canopy support tubing. The
sheet melal angle ~vill have hemmed edges attached with pop rivets. The color will be as shown closely
matching the stccl.
Sheet metal labor and materials
Caulking labor and materials
Adroit overhead / profit
Bond / insurance
$1,260.00
90.00
Subtotal: $1,350.00
135.00
29.70
Total Cost: $1,514.70
Pleasc advise us in writing ASAP if you would like us to proceed with this change. Feel l¥ee to call ine
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
RO. Box 609, Ashland, Oregon 97520 · 541-482-4098 * Fax: 541 482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, [NC.
June 17, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #70
Dear Bob,
The following are costs to install carpet in Room 114 and elevator as requested:
Multi-purpose Room Carpet
Elevator
Adroit Overhead/Profit
Bond/Insurance
Sub-Total:
$490.00
$50.00
$540.00
$54.00
$13.00
Total Cost: $607.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to
call me if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/rdh
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
P.O. Box 609, Ashtand, Oregon 97520 ', 541-482-4098" Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
June 17, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portlaud, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #71
Dear Bob,
The tbllowing are costs to supply and install (12) stainless steel hoops at the 12" radius
retaining wall as requested:
Stainless Steel
Epoxy
Installation labor; 7 hours at $46.00
Adroit Overhead/Profit
Bond/Insurance
Sub-Total:
$265.00
$49.00
$322.00
$636.00
$63.60
$14.40
Total Cost: $714.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to
call me if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/rdh
cc: Keith Woodley
Jim McNamara
A D R 0 IT C 0 N S T R U CTI 0 N C 0 M PA N Y, I N C.
P.O. Box 609, AshLand, Oregon 97520 · 541-482~4098 · Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
CITY OF ASHLAND
2O E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
CITY RECORDER'S COPY Page 1/2
DATE
07/01/2003 03624
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 609
ASHLAND1 OR 97520
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SlSKIYOU BLVD
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
Req. No.:
Dept.: FINANCE
Contact: Keith Woodle¥
Confirming? No
: Qbanl~i~ Unit , : : Description Unit Price Ext. Price
THiS IS A REVISED PURCHASE ORDER
/i: ' BLANKET PURCHASE ORDER
Fire Station Construction 2,513 093.00
Bid
C0htra~t dated: ~uly 10, 2002
Start date: Julv 20, 2002
~:: Comp orion date: 365 Days (07/20/2002)
InSu~rah~e reClU red/On f e
Revised purchase order 10-15-2002 23,697.62
Chang8 0~er No 1
Add work described in the memos of 15th
& 16th of Au.cl8st 2002& COPR
#1,2,3,4,6,&6A
Re ised purchase order 12/05/2002
20,907,81
Change Order No. 2
' !ADD WOrk described n the attached COPR
#5,9,10R2,11,12R,13R,16 & 17
$22 ;109.81, DELETE Work described n
the attached COPR #8 & 18.
Rev Sod purchase Order 02/05/2003 5 240,05
Chancre Order #3
: ADD Work described n the attaced COPR
#20, 21,24, 25 ,& 26R - $14,007.42.
:: DELETE work described n the altached
COPR #19 & 23 - ($8,767.37)
SUBTOTAL
BILL TO: TAX
FREIGHT
TOTAL
E 410.03.43.00.702200 2,639,636.13
Authorized Signature VENDOR COPY
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
07/01/2003
Page 2 / 2
;: F'O NUMe, ER
03624
VENDOR: 000013
ADROIT CONSTRUCTION, INC
P O BOX 609
ASHLAND, OR 97520
SHIP TO: Ashland Fire Department
(541) 482-2770
455 SlSKIYOU BLVD
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 07/20/2002
Special Inst:
Req. No.:
Dept.: FINANCE
Contact: Keith Woodley
Confirming? NO
QUantit7 Unit * Descript on Un t Pr ce Ext. Price
Revised purchase order 03/10/2003 6 095 37
Change order ~4
ADD work described in the attached COPR
'#28; 30R,& 31 $6,325 87, DELETE work
described in the attached COPR #29
Revised purchase order 3/27/2003 20,346.43
Chan~ Orde~
ADD work described in the attached COPR
~3R, 35 36 38, 39 40, 4~1 42~ 43. 44 ,
Revised purchase order 05/01/2003 6.230.21
: Change order ~6
ADD work described in the attached COPR
]: ~46;47 48,50,51 52,53 54 55.
DEDUCT work described in the attached
Revised purchase order 05/28/2003 26 814.04
change Order #7
ADD work d~scr bed in the attached COPR
#22R 56 57; 58 61 62 63
DEDUCT work described in the attached
COPR #59, 60 64
Revised purchase order 08/01/2003 17,211.60
Change Order ~
ADD work described in the attached COPR
~5, 68-71, 72R 73 76-78, & 80
SUBTOTAL 2.639.636.13
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 2,639,636.13
ASHLAND, OR 97520
Aul~j~'rized Signature
VENDOR COPY
REQUISITION FORM
THIS REQUEST IS A:
[] Change Order(existing PO # 03624)
CITY OF
-ASHLAND
Required Date of Delivery/Service: J J
Vendor Name:
Address:
City, State, Zip:
Phone:
Fax Number
Deliver Location
Ai")R f")lT C. ON.C;TRI JC. TIC)N
PO Box 609
Ashland, OR 97520
482-4O98
482-42i8
Services Only
Description Total Cost Solicitation Process:
[] Exempt [] 3 Written Quotes
(copies attached)
[] Sole Source [] Invitation to Bid
(copies on file)
Fire Station Construction Project [] Less than [] Request for
Change Order # 8 $17,211.60 $5ooo Proposal (copies on file)
Materials Only
Item # Quantity Unit
Account Number 410-03-43-00-702200
*Please attach the Original signed contract and Insurance certificate.
Description Unit Cost Total Cost
Account Number ....
*Please attach the quotes.
Employee Signature: Supervisor/Dept. Head Signature: ' / '~ '
NOTE: By signing this requisition form, I certify that the above request meets the City of Ashland Solicitation Process requirements and can be provided
when necessary.
G:Finance\Procedu reAP\Forms\Requisition form - Change Order 8 Updated on:07/15/02
adroit
CONSTRUCTION COMPANY, INC.
July 10, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 SC.W. Corbett
Portlaud, OR 97201
Re: Ashland Fire Station
Chaoge Order Cost Proposal #72 Revised
Dear Bob,
The lk>llowing arc actual costs to extend the cast-in-place curb 18 lin. fi. along the alley as requested by
Kcilh Woodlcy.
Concrete and form materials
Concrete labor 12 hours ~ $46.00 per hour
Adroit overhead / profit
Bond / insurance
$127.00
552.00
Subtotal: $679.00
67.90
15.10
Total Cost: $762.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel lYee to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
A o R 0 IT C 0 N S T R U CTI 0 N C 0 M PA N Y, I N C.
P.O. Box 609, Ash[and, Oregon 97520 · 541-482-4098 · Fax: 54~ 482~4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
July 2, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbetl
Portland, OR 97201
Re: A~hiand Fire Siation
Change Order Cost Proposal #73
Dear Bob,
The following are costs to add plants outside the South East comer of the apparatus Bay per Galbraith
and Associales drawing.
Landscaping labor and materials
Adroit overhead / profit
Bond / insurance
$175.00
17.50
4.50
Total Cost: $197.00
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
ADROIT CONSTRUCTION COMPANY, INC.
Box 609, Ash[and, Oregon 97520 * 541-482 4098 · Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
July 15, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. (!orbett
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal fl76
l)car Bob.
Thc following are costs to add VCT floor covering under the stairs as requested by Keith.
VCT labor and materials $125.00
Adroit overhead / profil 12.50
Bond / insurance 3.00
Total Cost: $140.50
Please advise us in writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional infom~ation.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
A o R 0 IT C 0 N ST R U CTI 0 N C 0 M PA N Y, I N C.
P.O. Box 609, Ashland, Oregon 97520 · 541-482-4098 · Fax: 541 482-4218
OREGON NO, 44384, CALIFORNIA NO, 454960B
Bdroit
CONSTRUCTION COMPANY, iNC.
July 15, 2003
Robert Thrapp
Peck/Smiley/Ettlin, Architects
4412 S.W. Corbett
Portland, OR 97201
Re: Ashland Fh'e Stalion
Change Order Cost Proposal #77
Dear Bob,
The following are costs to provide and install (4) men and women restroom signs and (2) exterior metal
signs as requested.
Restroom signs
Exterior melal signs
Adroit overhead / profit
Bond / insurance
$385.00
250.00
Subtotal: $635.00
63.50
14.50
Total Cost: $713.00
Please advise us m writing ASAP if you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional information.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keilh Woodley
Jim McNamara
ADROIT CONSTRUCTION CO~4PANY, INC.
P.O. Box 609, Ash[and, Oregon 97520 · 541-482-4098 ,, Fax: 541-482-4218
OREGON NO. 44384, EALIFORNIA NO. 454960B
adroit
CONSTRUCTION COMPANY, INC.
July 15, 2003
Robert Thrapp
Peck/Smiley/Etllin, Archilecls
4412 S.W. Corbctt
Portland, OR 97201
Re: Ashland Fire Station
Change Order Cost Proposal #78
Dear Bob,
The lbllowing are costs to provide labor and materials to apply Aqua Mix "Sealers Choice" to the
rl'hompson hnola Micron black porcelain lile in the lobby, hail and restrooms.
Aqua Mix "Sealer's Choice" labor and materials
Adroit overhead / profit
Bond / insnrancc
$1,800.00
180.00
40.50
Total Cost: $2,020.50
Please advise us in writing ASAP i f you would like us to proceed with this change. Feel free to call me
if you have any questions or need additional informalion.
Sincerely,
Steve Lawrence
SL/cr
Accepted by
cc: Keith Woodley
Jim McNamara
A u R 0 IT C 0 N ST R U C TI 0 N C 0 M PA N Y, I N C.
P.O. Box 609, Ashland, Oregon 97520 · 54I 482 4098 · Fax: 541-482-4218
OREGON NO. 44384, CALIFORNIA NO. 454960B
a~-22-2003 ?'U~: 03122 ?~ ~DROIT CONSTRUCTION~^× ~. 5~1~82~218 ?. OO1/OOl
adroit
CONS. TRUCTIOH COMPANY, INC.
July 22. 2003
Keith Woodley
Fire Chief
A~qlxlaml Fire & lltscne
455 8i*kSyou Blvd.
As[dant[ OR 97520
Re: Aslila~ Fire 8tafiott
Change Order Co~t Proposal ~80
Dear Keith,
The fo[lowing axe cosLs to mpp/y arul ~ (1 fi) Bullen~a 800T NEMA style lyaSh button controllers,
30.SmmNEMA t3~e 4/13, wateatight / oil ~ for ~ae overhead doOr operators.
06) Pu_4l button control2tws ~ $105.00 each
Insudlafitm
Adroit overhead / profit
Bond / insurance
$1,680.00
No Ctmge
SubtotXl: $1,680.{50
No Chmge
No Charge
Total Cobh ~
We are proceed.rog ~th this work lmr ycmr verbal aufl~ffzafio~. Please s/gn ~ wr~tteg autEorization
£or our records. Feel f~ee to call m.e if you la,ave any qaesfiom or need addil/tmal informatiox~
Sincerely,
SL/cr
Bob Thza~pp
Acorpted by