Loading...
HomeMy WebLinkAbout2003-216 CONT AMND #1 - Thornton Engineer ENGINEERING SERVICES CONTRACT AMENDMENT NO. 1 Engineering services contract made on the date specified below in Recital A between the City and Engineer as follows: Recitals: A. The following information applies to this contract: CITY: CITY OF ASHLAND City Hall 20 E. Main St. Ashland, Oregon 97520 (541) 488-5347 FAX: (541) 488-6006 ENGINEER: Address: Thornton Engineering, Inc. 1236 Disk Drive, Suite 1 Medford OR 97504 Telephone: 541/857-0864 Fax: 541/857-1947 Date of this agreement: April 1, 2003 B: RFP Date: November 17, 2000 Proposal Date: December 14, 2000 ¶2.3 City Contracting Officer: Director of Public Works, Paula Brown ¶2.4. Project: Bear Creek Trunk Sewer Phase 5, Project No. 2003-05 ¶6.1. Engineer's Representative: Michael P. Thornton P.E, President I]8.3. Maximum Contract Amount: $20,770.00 (see attached proposal) B. Amendment No. 1 1. Modification to Section 2.4 Increase scope of work beyond the original defined work as follows: Provide a sub-consultant to provide a geotechnical investigation and design recommendation regarding expected rock excavation. Modification of Section 8.3 a. Add cost of extra work = $5,514.00 b. Adjusted contract total = $26,284.00 ENGINEER SignatL~re' Printed Name CITY BY Date: ( ~'/~'/~,~' BY / '"""~ /~ ' City Department Head Date: //~'¢Z-,¢ ~' Coding (for City use only) \\COMPAQI\DATA\GOWpub-wrks\eng\dept-admin\ENGINEER\PROJECT~.003\03-05 Contract Amendment No 1 10 03doc CITY OF ASHLAND 20 E MAIN ST, ASHLAND, OR 97520 (541) 488-5300 VENDOR; 003753 THORNTON ENGINEERING 1236 DISK DRIVE SUITE 1 MEDFORD, OR 97504 FOB Point: Terms: Net Req. Del. Date: 04/01/2003 Special Inst: CITY RECORDF 'S COPY Page 1 / 1 DATE ] PO NUMBER 07/01/2003 J 04079 SHIP TO: Ashland Public Works (541) 488-5587 27-1/2 N MAIN STREET ASHLAND, OR 97520 Req. No.: Dept.: PUBLIC WORKS Contact: P~ula Brown Confirming? No Description Unit Price Ext. Price THIS IS A REVISED PURCHASE ORDER BLANKET PURCHASE ORDER Engineerin¢l Services for the Bear Creek Trunk Sewer Line Construction Phase 5 RFP Start Date: April 1,2003 Completion Date: Insurance required/On file Proiect #03-05 Revised purchase order 11/18/2003 Change Order No. 1 - Galli Group Geotechnical Report 20,770.00 5,514.00 BILL TO: Account Payable 20 EAST MAIN ST 54%552-2028 ASHLAND, OR 97520 SUBTOTALFREiGHTTAX l 26,284.000.000.00 TOTAL / 26,284.001 Account Number Amount Account Number Amount E 675.08.39.00.704200 __ 26,284.00 ~n~ture VENDOR COPY CiTY OF -ASHLAND A request for a Purchase Order REQUISTION FORM Date of Request: [ 10/03/2003] THIS IS A REQUEST FOR A: [ X ] Change Order (existing PO# 4079 Required Date of Delivery/Service: F,~,SAP j Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: THORNTON ENGINEERING 1236 DISK DRIVE STE 1 MEDFORD OR 97501 5411857-0864 BEAR CREEK TRUNK SEWER PHASE 5 2003-05 Solicitation Process: Exempt ] 3 Written Quotes (cop~es attached) Sole Source *~4,~'n vit ation to Bid (cop~es on Less than $5000 ,,~ Request for Proposal (copies Services Only Description Total Cost Bear Creek Trunk Sewer Phase 5 $ 20,770,00 Original Contract Cost Change Order No. 1 -GalliGroupGeotechnicaIReport $ 5,$14.00 ChangeOrderAmount Change Order No. 2 $ 26,284.00 REVISED CONTRACT Account Number 675.08.39.00.704200 ~ Account Number ~, Employee S ignatu re: % ~j'~"~- Sa p e rviso r/Dept. Head Sig n atu re: ~~ NOTE: By signing th~$ re~t#on forr¢, I c~d/~'t~a t~e above request meets w~th Ct/y of Ashland Solicitiation Process~ut~ments and can be provided when necessa[y G Pubwrks/Eng\03-05 Change Order No 1 ×Is Updated on 7/15/02