Loading...
HomeMy WebLinkAbout2004-184 Contract - Hardey EngineeringENGINEERING SERVICES CONTRACT Engineering services contract made on the date specified below in Recital A between the City and Engineer as follows: Recitals: A. The following information applies to this contract: CITY: CITY OF ASHLAND City Hall 20 E. Main St. Ashland, Oregon 97520 (541) 488-5347 FAX: (541) 488-6006 ENGINEER: HARDEY ENGINEERING & ASSOCIATES INC. Address: PO BOX 1625 MEDFORD OR 97501 Telephone: 541/772-6880 Fax: 772-9573 Date of this agreement: April 12, 2004 B: RFP Date: February 17, 2004 Proposal Date: March 26, 2004 ¶2.3 City Contracting Officer: Paula Brown, PE, Director of Public Works ¶2.4. Project: 2004 Utility Construction Project No. 04-07 ¶6.1. Engineer's Representative: John Hardey, PE ¶8.3. Maximum Contract Amount:S25,000.00 B. On the date noted above, City issued a request for proposals (RFP) for engineering services needed by City for the project described above. Engineer submitted a proposal in response to the RFP on the date noted above. C. After reviewing Engineer's proposal and proposals submitted by other offerors, City selected Engineer to provide the services covered by the RFP. City and Engineer agree as follows: 1. Relationship between City and Enqineer: Engineer accepts the relationship of trust and confidence established between Engineer and City by this contract. Engineer covenants with the City to perform services and duties in conformance to and consistent with the standards generally recognized as being employed by professionals of engineer caliber iin the locality of the project. Engineer further covenants to cooperate with City, City's representatives, contractors, and other interested parties in furthering the interests of City with respect to the project. In order to promote successful completion of thc: project in an expeditious and economical manner, Engineer shall provide professional engineering services for City in all phases of the project to which this contract appllies, serve as City's professional engineering representatiw~ for the project, and give professional engineering consultation and advice during the term of this contract. Engineer acknowledges that City is relying on Engineer to provide professional engineering services in a manner that is consistent with the interests of City. G:\pub-wrks\eng\dept-ad~min\ENGINEER\PROJEC-1'~004\04-07 Hardey Contract Utility 4 04.doc 1 2. Definitions: Generally words, terms and phrases used in this contract shall have the meaning ascribed to them in the construction industry, unless the context clearly indicates otherwise. As used in this contract: 2.1. "Contract documents" shall mean this contract, written authoriza~tions under subsection 0, written assignments under subsection 5.2, written amendments to this contract, schedules established under subsection 5.4 and exhibits incorporated in other contract documents. 2.2. "City'" means the City of Ashland, Oregon. 2.3. "Contracting officer" means the person specified in Recital A above or that person's designee. 2.4. "Project" means the project described in Recital A. 2.5. "Work" or "Services" shall mean all labor, materials, plans, specifications, construction contract documents, opinions, reports, and other engineering services and products which E'.ngineer is required to provide under this contract. 3. Term: The te~rm of this contract shall commence on the date specified in Recital A above and end on completion of all services required by this contract unless sooner terminated as provided in this contract. 4. Authority of contracting Officer: The contracting officer shall have the authority to act on behalf of City in the administration and interpretation of this contract. Subject to the limitations on authorization of assignments under subsection 5.2, the contra~cting officer shall have complete authority to authorize services, the contracting Officer shall have complete authority to authorize services, transmit instructions, receive information, interpret and define City's policies and make other decisions with respect to Engineer's services. 5. Engineering Services: 5.1. Engineer shall provide services to City that are described in Exhibit I which is attached to and incorporated in this contract. 5.2. In addition to the services described in Exhibit 1, the parties may agree to have Engineer provide other discrete services that are necessary for completion of the project. Such services will be initiated by written assignments as follows: 5.2.1. Assignments under this subsection should be used only for services tlhat are beyond the scope of the services described in Exhibit 1. No assignment is necessary to authorize services that are customarily G:\pub-wrks\eng\dept-admin\ENGINEER\PROJEC-lA2004\04-07 Hardey Contract Utility 4 04.doc 2 provided in conjunction with, or are ancillary to, the services described in Exhibit 1. 5.2.:2. Assignments which cover services that will cost less than $15,000 may be initiated by the contracting officer. Assignments that cover serviices which will cost more than $15,000 must be approved by the City Administrator. 5.2.3. Each assignment shall specify the duties of Engineer, the objective of the assignment, the scope of the assignment and the estimated cost of the services. 5.2.4. Each assignment shall be signed by both parties. 5.2.5. Each assignment shall incorporate and be subject to the provisions of the contract documents unless the assignment specifically provides otherwise. 5.3. In connection with the services described in Exhibit I and services authorized by assignments under subsection 5.2, Engineer shall: 5.3.1. Consult appropriate representatives of City to clarify and define City's requirements relative to the services. 5.3.2. Review available data relative to the services. 5.3.3. Identify data which is not available and is needed to fulfill the services, and act as City's representative in obtaining such data. 5.3..4. Prepare monthly progress reports to the contracting Officer on the status of services. 5.3..5. Cooperate with other consultants retained by City in thE; exchange of information needed for completion of the services and the project. 5.4. The services described in Exhibit 1 are divided into discrete work elements. Engineer shall commence performance of services within five days after receiving written authorization from the contracting officer for work elements described in Exhibit 1 or assignments made under subsection 5.2. Engineer shall perform the services as expeditiously as is consistent with professional skill and care and the orderly progress of the project. Upon request of City, Engineer shall submit for City's approval, a schedule for the performance of work elements described in Exhibit 1 and assignments made under subsection 0. Each schedule shall include allowance for periods of tirne required for City's review and approval of Engineer's services. Each schedule, approved by City, shall become a part of this contract. G:\pub-wrks\eng\dept-ad~min\ENGINEER\PROJEC'lA2004\04-07 Hardey Contract Utility 4 04.doc 3 5.5. Engineer shall perform the services as an independent contractor in accordance with generally accepted standards in Engineer's profession. Engineer shall be responsible for the professional quality, technical accuracy and the coordination of all services performed by Engineer. Engineer shall, without additional compensation, correct or revise any error or deficiencies in the services that are caused by Engineer's negligence. City's review, approval, acceptance of, or payment for, any of the services shall not be construed to waive any of City's rights under this contract or of any cause of action arising out of Engineer's services. In the event of any breach of this contract by Engineer or negligent performance of any of the services, City's cause of action against Engineer shall not be deemed to accrue until City discovers such breach or negligence, or should have, with reasonable diligence, discovered such breach or negligence. The preceding sentence shall not be construed, however, to allow City to prosecute an action against Engineer beyond the maximum time limitation provided by Oregon law. 6. Assignment of Engineer's Personnel: 6.1. The services covered by this contract shall be rendered by, or u~nder the supervision of the person specified in Recital A above, who shall act as Engineer's representative in all communications and transactions with City. 6.2. Engineer will endeavor to honor reasonable specific requests of City with regard to assignrnent of Engineer's employees to perform services if the requests are consistent with sound business and professional practices. 7. Responsibilities of City: 7.1. City will cooperate fully with Engineer to achieve the objectives of this contract. 7.2. City will provide information, documents, materials and services that are within the possession or control of City and are required by Engineer for performance of the services. 7.3. City will arrange for access to, and make all provisions for Engineer to enter upon, public and private property as required for Engineer to perform the services. 7.4. City will provide all permits necessary for completion of the project. 7.5. The contracting officer will act as liaison between City, Engineer, public agencies, and others involved in the project. 7.6. City shall perform such other functions as are required by writ[en assignments under subsection 5.2. 8. Payment: G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT~004\04-07 Hardey Contract Utility 4 04.doc 4 8.1. City shall pay Engineer for services and reimburse Engineer for expenses incurred by Engineer in performance of services in accordance with a payment schedule to be submitted by Engineer and accepted by City. No reimbursement will be made for expenses that are not specifically itemized in this payment schedu~le without prior approval by the contracting officer. 8.2. Engineer shall submit monthly invoices to City for Engineer's services within ten days after the end of the month covered by the invoice. 8.3. Total payments under this contract or any amendments shall not exceed the sum specified in Recital A above. 9. Compliance with Law: 9.1. This contract will be governed by and construed in accordance with laws of the State of Oregon. Engineer shall promptly observe and comply with all present and future laws, orders, regulations, rules and ordinances of federal, state, City and city governments with respect to the services including, but not limited to, provisions of ORS 279.312,279.314, 279.316 and 279.320. 9.2. Pursuant to ORS 279.316(2) any person employed by Engineer who performs work under this contract shall be paid at least time and a half pay for all overtime in excess of 40 hours in any one week, except for persons who arE; excluded or exempt from overtime pay under ORS 653.010 to 653.261 or under 29 U..S.C. Sections 201 to 2'.09. 9.3. Engineer is a "subject employer" as defined in ORS 656.005 and shall comply with ORS; 656.017. Prior to commencing any work, Engineer shall certify to City that Engineer has workers' compensation coverage required by ORS Chapter 656. If Engineer is a carrier insured employer, Engineer shall provide City with a certificate of insurance. If Engineer is a self-insured employer, Engineer shall provide City with a certification from the Oregon Department of Insurance and Finance as evidence of Engineer's status. 10. Ownership of Documents: All documents prepared by Engineer pursuant to this contract shall be the property of City. To the extent permitted by law, City shall, within the limits of the Oregon Tort Claims Act, defend, indemnify and hold harmless Engineer, its consultants, agents and employees against all damages, claims, expenses and losses arising out of any reuse of plans, specifications and other documents prepared by Engineer without prior written authorization of Engineer. 11. Records: G:\pub-wrks\eng\dept-adrnin\ENGINEER\PROJECTg2004\04-07 Hardey Contract Utility 4 04.doc 5 11.1. Engineer shall develop and maintain complete books of account and other records on the services which are adequate for evaluating Engineer's performance. Engineer shall maintain records in such a manner as to provide a clear distinction between the expenditures and revenues related to the project and the expenditures and revenues related to Engineer's other business. 11.2. Engineer's books and records shall be made available for inspection by City at reasonable times, to verify Engineer's compliance with this contract. City shall have the right to request an audit of Engineer's books and records by a certified public accountant retained by City. 12. Indemnification: Engineer shall defend, indemnify and save City, its officers, agents, and employees harmless from any and all claims, actions, costs, juclgments, damages or other expenses resulting from injury to any person (including injury resulting in death,) or damage to property (including loss or destruction), of whatsoever nature arising out: of or incident to the negligent performance of this contract by Engineer (including but not limited to, the negligent acts or omissions of En§lineer's employees, agents, and others designated by Engineer to perform work or services attendant to this contract). Engineer shall not be held responsible for any cl,aims, actions, costs, judgments, damages or other expenses, directly and proxim;ately caused by the negligence of City. 13. Insurance: 13.1. Engineer shall, at its own expense, at all times during the term of this contract, maintain in force: 13.'1.1. A comprehensive general liability policy including coverage for contractual liability for obligations assumed under this contract, blanket contractual liability, products and completed operations and owner's and contractor's protective insurance; 13.'1.2. A professional errors and omissions liability policy; and 13.'1.3. A comprehensive automobile liability policy including owned and non-owned automobiles. 13.2. The coverage under each liability insurance policy shall be equal to or greater than the limits for claims made under the Oregon Tort Claims Act with minimum coverage of $500,000 per occurrence (combined single limit for bodily injury and property damage, claims) or $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. G:\pub-wrks\eng\dept-admin\ENGINEER\PROJEC-1~004\04-07 Hardey Contract Utility 4 04.doc 6 13.3. Liability coverage shall be provided on an "occurrence" basis. "'Claims made" coverage will not be acceptable, except for the coverage required by subsection 13.1.2. 13.4. Certificates of insurance acceptable to the City shall be filed with City prior to the commencement of any work by Engineer. Each certificate shall state that coverage afforded under the policy cannot be cancelled or reduced in coverage cannot be made until at least 30 days prior written notice has been given to City. A certificate which states merely that the issuing company "will endeavor to mail" written notice is unacceptable. 14. Default: 14.1. There shall be a default under this contract if either party fails to perform any act or obligation required by this contract within ten days after the other party gives written notice specifying the nature of the breach with reasonable particularity. If the breach specified iin the notice is of such a nature that it cannot be completely cured within the ten day, period, no default shall occur if the party receiving the notiice begins performance of the act or obligation within the ten day period and thereafter proceeds with reasonable diligence and in good faith to effect the remedy as soon as Ipracticable. 14.2. Notwithstanding subsection 14.1, either party may declare a default by written notice to tlhe other party, without allowing an opportunity to cure, if the other party repeatedly breaches the terms of this contract. 14.3. If a default occurs, the party injured by the default may elect to terminate this contract and pursue any equitable or legal rights and remedies available under Oregon law. All remedies shall be cumulative. 14.4. Any litigation arising out of this contract shall be conducted in Circuit Court or District Court of the State of Oregon for Jackson County. 15. Termination ,without Cause: 15.1. In addition to the right to terminate this contract under subsection 14.3 or subsection 0, City may terminate by giving Engineer written notice sixty days prior to the termination date. 15.2. In addition to the right to terminate this contract under subsection 15.1, Engineer may complete such analyses and records as may be necessary to place its files in order and,, where considered necessary to protect its professional reputation, to complete a report on the services performed to date of termination. 15.3. If City terminates the contract under subsection 15.1, Engineer shall be paid for all fees earned and costs incurred prior to the termination date. Engineer shall not be entitled to compensated for lost profits. G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT~2004\04-07 Hardey Contract Utility 4 04.doc 7 16. Notices: Any' notice required to be given under this contract or any notice required to be given by law shall be in writing and may be given by personal delivery or by registered or certified mail, or by any other manner prescribed by law. 16.1. Notices to City shall be addressed to the contracting officer at the address provided for the C;ity in Recital A above. 16.2. Notices to Engineer shall be addressed to the engineer's representative at the address provided for the Engineer in Recital A above. 17. Assignment: City and Engineer and the respective successors, administrators, assigns and legaJ representatives of each are bound by this contract to the other party and to the partners, successors, administrators, assigns and legal representatives of the other party. Engineer shall not assign or subcontract Engineer's rights or obligations under this contract without prior written consent of City. Except as stated in this section, nothing in this contract shall be construed to give any rights or benefits to anyone other than City and Engineer. 18. Modification: No modification of this contract shall be valid unless in writing and signed by the parties. ENGINEER Fed. ID# q3"'-" l t3 CITY BY REVIEWED AS TO CONTENT // ~ity Department Head Date: .~ J~t.. ~ REVIEWED AS TO FORM By City Legal Counsel Date: Coding (for City use only) G:\pub-wrks\eng\dept-ad~min\ENGINEER\PROJEC'r~.004\04-07 Hardey Contract Utility 4 04.doc 8 EXHIBIT 1 Hardey Enginee ring and Associates, Inc. March 23, 2004 City of Ashland Public Works Department 20 East Main Street Ashland OR 9752(:) Attn: Jim Olsen fax - 488-6006 P.O. Box 1625 Medford, OR 97501 541.772.6880-tel 541.772.9573-fax info@hea-inc.com Subject: 2004 Utility Construction Project No. 04-07 PROPOSED SCOPE OF WORK: We at Hardey Engineering would like to thank you for the opportunity to subrnit this Proposal for Services. The scope of work as we see it at this time is to provide civil engineering services necessary for utility construction of the above mentioned projects. The work is more specifically as follows: A - Walnut Street 8-inch Sanitary Sewer Replacement - Tucker Street to Luna Vista Street. This project will replace the existing 6-inch concrete sanitary sewer in Walnut Street between Tucker and Luna Vista Streets (approx. 1400 LF). B - Granite Street 8-inch Sanitary Sewer Replacement - Strawberry Lane to Nutley Street. This project will replace the existing 8-inch concrete and clay sanitary sewer line in Granite Street between Nutley Street and Strawberry Lane (approximately 750 LF). C - Walker Avenue Storm Drain Construction - Intercept the existing ditch/pipeline on the south side of Parker Street continuing along Parker Street to the west side of Walker Avenue to connect to the existing 24-inch pipeline (roughly 600 LF of proposed 24" storm drain line). The Engineering Services to be provided by the engineer under these projects include: provide topographic survey provide utility mapping reference centerline survey monumentation provide for the replacement of all obliterated centerline monumentation including filing a map of survey attend a pre-design conference provide preliminary design for a 30% review provide preliminary design for a 90% review provide final project plans provide final project specifications and bid and contract documents (,original copy plus data disk) coordinate with Walker Elementary School regarding the construction of an above- ground water course in conjunction with the Walker Avenue Storm [:)rain Project attend pre-bid and pre-construction conferences provide minimal construction inspection services on an "as needed" basis attend weekly construction progress meetings provide "as-built" information as follows - provide DEQ notification of construction - provide "as-built" plans on Mylar as well as in an electronic format Page 2 - City of Ashland - Utility Construction Project No. 04-07 Hardey Engineering & Associates, Inc. Project Manager and key team members involved with these projects include: Project Manager - John Hardey Key Team Members - Jim Higday, Bart Deming, Scott Parker We do not anticipate the need for any sub-consultants. HEA anticipates thE; project cost to be roughly $161,000. The proposed cost of engineering services is $25,000. The schedule of project development up to the project bidding stage as we see it at this time is: June 2004 June 2004 (mid -late) July .2004 September 2004 October 2004 October 2004 (mid - late) Attend pre-design conference Complete topographic survey Submit 30% review documents to City of Ashland Submit 90% review documents to City of Ashland Provide final project documents and specifications to City of Ashland Project out to bid Sincerely, Jim Higday Project Manager HARDEY ENGINE[--RING & ASSOC., INC. W:~PROPOSAL\COA 04-07 City of Ashland LIVING per hour effective June 30, 2004 (Increases annually eve~ june 30 bY the Consumer Price Index} For all hours worked under a service contract between their employer and the City of Ashland if the contract exceeds $15,964 or more. For all hours worked in a month if the employee spends 50% or more of the employee's time in that month working on a project or portion of business of their employer, if the employer has ten or more employees, and has received financial assistance for the project or business from the City of Ashland in excess of $15,964. If their employer is the City of Ashland including the Parks and Recreation Department. In calculating the IMng wage, employers may add the value of health care, retirement, 401K and IRS eligible cafeteria plans (including childcare) benefits to the amount of wages received by the employee. Call the Ashland City Administrator's office at 541-488-6002 or write to the City Administrator, City Hall, 20 East Main Street, Ashland, OR 97520 or visit the city's website at www.ashland.or, us. Notice to Employers: This notice must be posted predominantly in areas where it can be seen by all employees. C. ITY OF -AS; H LAN D .. I DATE {MM/DD/YYYY) ACORD. CERTIFICATE OF LIABILITY INSURANCE . . K~t~E-1I 08/04/04 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Protectors Tnsurance, I,LC HOLDER. THIS CERTIFICATE DOES NOT AlVlEND, EXTEND OR 514 Crater Lake Ave. ALTER THE COVERAGE AFFORDED BY THIE POLICIES BELOW. Medford OR 97504 Phone: 541-773-5358 Fax: 541-772-1906 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURER A: ~sm:~nce Co~an~, of INSURER B: SAIF Corporation Harde~ Engineering & Assoc Inc INSURER C: PO Box 1625 Medford OR 97501 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO VVHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY TI-IE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IN~I-< ~,T.~i.J:L. POLICY EFFECTIVE POLICY EXPII~,~.TION LTR NSRD TYPE OF INSURANCE POLICY NUMBER DATE (MM/DD/YY) DATE (MM/DD/YY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $ I, 00 '0,000 A X COMMERCIAL GENERAL LIABILITh' P2~43371906 05/12/04 05/12/05 PREMISES (Ea occurence) $ 100 ·000 ] CLAIMSMADE r-~ occur MED EXP (Any one person) $ 10 ,,000 PERSONAL & ADV INJURY $ I · 000 , 000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS ~ COMIP/OP AGG $ 2 ', 0 0 0,0 0 0 I POLICY ~-~ PRO- JECT [-~ LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000 ,000 A ANY Au'rD PA~43371906 05/12/04 05/12/05 (Ea accident) X ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY ~,~ NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE (Per accident) $ GARAGE UABILII'Y AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILR'Y EACH OCCURRENCE IOCCUR ~ CLAIMS MADE AGGREGATE $ DEDUCTIBLE RETENTION $ $ WC $1AIU-I OTH- WORKERS COMPENSATION AND TORY L M TS I I ER EMPLOYERS' LIABILITY ]~ ANY PROPRIETOR/PARTNER/EXECUTIVE 943247 07/01/04 07/01/05 E.L. EACH ACCIDI--NT $ 500 ·000 OFFICER/MEMBER EXCLUDED? E.L. DISEASE - E/k EMPLOYEE $ 500,000 Il' yes. descdbe under SPECIAL PROVISIONS below E.L. DISEASE - POLICY LIMIT $ 500 · 000 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS ,, CERTIFICATE HOLDER CANCELLATION Cit~ of Ashland 20 E. Main Street Ashland OR 97520 ACORD 25 (2001108) CITYAS2 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR'. TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LI=FT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR IREPRESENTATIVES. AUTHORIZED REPRESENTA~ ~ ~ ~a~'~, ~ (,,~,,'%,'~"1~'~'F~wl,-'" ~)ACORD CORPORATION 1988 CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541 ) 488-51300 C',ITY RECORDER'S COPY ·DATE 8/6/20O4 Page 1 / 1 " PO'NUMBER:: ":'1 / 05283 VENDOR: 001718 HARDLY ENGINEERING & ASSOCIATE P O BOX 1625 MEDFORD, OR 97501 SHIP TO: Ashland Public Works (541 ) 488~5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net 30 days Req. Del. Date: 7/30/2004 Special Inst: Req. No.: Dept.: PUBLIC WORKS Contact: Paula Brown /Jim Olson Confirming? Yes ":.QUantitY:..i ,:..unit'.,.: :.. .. · :..".: '". .. .:: ....DescriPtion. .... ':.. i.: '.' .:...' ;:.......: .. . i unitPriCe·' .... .Ext,.Price..:. : . , .... BLANKET IPURCHASE ORDER i:i':'.'::'.:".:..i ::.' i.... ..."'"' '" Ehgineeri.ng Design'serVices.fOr the.. · .. : '. '"' .'.. ..8,333.33' 2004 .Utility Construction Project 04-07 · ..:..i':.:i':.:.... ':'~'':'. i'..:' :... ..RFP..'.'.""i.' '.':."'. '.:. ".: · ' '"" .. ..i . ' . · . ... : i. : . . i.i::. '. ' : .. Beginning date: ASAP i :: :'~'!.::"i.. ?':.; :: .::: ii'/:' !.Li:..:~"'.'. InsuranCe' ' i~eqUired/On' file:. ' ...... ' ' ' '"' "" "" ..... .... '"" ": WALNUT STREET SANITARY SEWER · .:' ... ::'..::::':.'::::.:~:':...::i~.:i....~i:::~:::.L....':'.~ · .8'5%. cOli'ection~ :$7.,083..3.3:: ......: · .: ... ... .. :. 15% SDC -. $1250.00 · .. '" '"'"':.: .:"i:.'i;":.i'..:.:' ::" :i:".:':'.':' ": GRAN'ITE"STR:EET.SANITARY:iSEWER''..:' "'...'" .: """ ' ' ".....:'.:':.i..::'" ':. ..:: ..8,333..33 85% Collection - $$7,083.33 ..'" ::'!'.' :'::~':;".::: ..':.'..:.:..' ':'" ' :'i.5%'SDC'..!,. $1250~00:.:.::.::.:.:'.:'. ".'::i:.:....'.' ..::: .."' ' . ' .... i :..' :: '...":...'"" .' :; "' ' : · · " · WALKER AVENUE STORM SEWER 8,333.34 · ': :...:.:;':'.i.'::: .:..::.':':.:::;.'.'.':;:.;65% COl!e¢ition?.$5;416.67:." ..'.' .... .. '~ ' '" .' ".. .... " 35% SDC -. $2,916.67 ....... ..... . . . . · · . .... ·.. · .. '..:...::... .. ......... · .' . . SUBTOTAL 25,000.00 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2028 TOTAL 25,000.00 ASHLAND, OR 97520 Account Number Amount Account Number Amount E 260.08.17.00.7042(:)0 5,416.67 E 260.08.34.00.7042(:)0 2,916.67 E 675.08.17.00.7042(:)0 14,166.66 E 675.08.39.00.7042(:)0 2,500.00 VENDOR COPY REQUISITION CITY OF -AS H LAN P No. PW - FY 2004 Department PUBLIC WORKS DEPARTM Vendor HARDEY ENGINEERING PO BOX 1625 MEDFORD OR 97501 Account No. See Below Date August 2, 2004 Requested Delivery Date Deliver To JIM OLSON Via PAULA BROWN ASAP (* Note: Please allow approximately two(2) weeks for delivery on items not generally caried in stored, and approximately two (2) months on printing jobs.) Item No. Quantity Unit Description Use of Purchasing Office On [y Unit Price Total Price PO No. Engineering Design services for the 2004 Utility Construction Project 5283 Account Nos.: Walnut Street Sanitary Sewer 85% Collec~Iion- 675.08.17.00.704200 $ 7,083.33 15% SDC- 675.08.39.00.704200 $ 1,250.00 Granite Street Sanitary Sewer: 85% Collection - 675.08.17.00.704200 $ 7,083.33 15% SDC - 675.08.39.00.704200 $ 1,250.00 Walker Avenue Storm Sewer: 65% Collection 260.08.17.00.704200 $ 5,416.67 35% SDC 260.08.34.00.704200 $ 2,916.67 TOTAL $ 25,000.00 for Kari: BID /RFP / EXEMPT: RFP Contract Start Date: asap Contract Completion Date: Insurance on file: I YES I NO Project No: 04-07 Job No. Unit No. I hereby certify that the above items are necessary for the operation of this department and are budgeted ~~ ~ horized Person Issued By Date Received By G:Deptadmin\pubwrks\eng\engineer\project\04-07 Hardey Utility Req 07 04 PROJECT ACCOUNTING WORKSHEET CITY OF H LAN D PROJECT NUMBER (YEAR XX) PROJECT TITLE! PROJECT DESCRIPTION Department Project Manager Department Head BUDGET INFORMATIOIq Identify fiscal year / potential splits Funding Codes DESIGN .lOO 2004071 2004 UTILITY CONSTRUCTION PROJECT iSewer line replacement on Walnut Street and Granite Street (Item A) and storm drain line replacement on Walker Avenue (Item B). Public Works Engineering Jim Olson Paula Brown Item A Walnut & Granite Streets I 675.08.17.00.7042001 Sanitary Sewer Collection - 85% I 675.08.39.00.704200 I Sanitary Sewer SDC - 15% Engineer Name Hardey Engineering PO 5283 COST $ 25,000.00 CONSTRUCTION contractor name PO budget estimate bid / contract total changes total .120 .150 .170 CONSTRUCTION MANAGEMENT engineer name PC) budget estimate bid / contract total changes total PERMIT COSTS (Building Dept) budget estimate final costs Item B Walker Avenue 260.08.17.00.7042001Stormwater Collection - 65% I 260.08.34.00.70,¢2001Stormwater SDC - 35% 85%= $14,166.66 15% = $2,500.00 65% =$5,4'16.67 35% = 2,9'16.67 ,"-'I G:pub-wrkslengldept-adminlengineerl3rojectl04-07 Proj Acct Worksheet