AMENDMENT NO.1
to
CONSULTANT SERVICES CONTRACT
ASHLAND MUNICIPAL AIRPORT IMPROVEMENT PROJECT
AlP PROJECT NO.. 3-41-0002-06
The Consultant Services Contract dated March 2004 between the CITY OF ASHLAND, hereinafter
referred to as OWNER, and DAVID EV ANSAND ASSOCIATES, INC., a Professional
Consulting Engineering finn, hereinafter referred to as CONSULT ANT, shall be amended as
follows:
· Additional Services During Construction required to provide Resident Observation for night
construction during installation ofMIRL system.
In consideration for these additional engineering services, the OWNER shall pay the
CONSULTANT in accordance with the CONSUL T.i\NT' s hourly rates attached hereto and direct
nonsalary expenses at actual cost. The maximum compensation for this additional work shall not
exceed $10,000. The total contract amount for services during construction is hereby revised to
$46,849.72, and the total contract amount for design and services during construction is hereby
revised to $131,017.95. All other conditions of the contract shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in triplicate.
::~: err:;; A~ :;: DAm~~TES' INe.
Title: rINrl-'WCIt V' ,e.1i.~ Title: vP
Date: y / r / of Date: 7/2-- ?,/as
Title:
Date:
By:
o:\projects\ashllash_contractslamend#J to conslllt svcs contract. doc
City of Ashland
Amendment to March 2004 Consultant Services Contract
David Evans and Associates, Inc.
July 27, 2005
Exhibit A
to
CONSULTANT SERVICES CONTRACT
for
CITY OF ASIILAND
ASHLAND MUNICIPAL AIRPORT
AIRPORT IMPROVEMENT PROJECT NO. 3-41-0002-06
DAVID EVANS AND ASSOCIATES, INC.
2005 Hourly Rates
Title
A veraee
Hourlv Rate
Principal
Project Manager
Proj ect Engineer
$193.20
$151.73
$128.10
$133.35
$93.45
$77.18
$151.73
$95.03
$149.10
$93.45
$76.13
$72.98
$123.38
$93.45
$74.03
$70.35
Electrical Engineer
Civil Engineer
Engineer in Training
Environmental Project Manager
Environmental Specialist
Right-of- \V ay Specialist
Engineering Technician
CADD Technician
Survey Party Chief
Engineering Construction Manager
Construction Observer
Assistant Construction Observler
Office
o:\projectslash/lash _ contracts 12005 Jates _ ash/OOO3.doc
elf V RECORDER'S CQPY
Page 1 / 1
r.,
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
I~>>a=~,
~:: >:;;PONOMBER "3";
L 04960
VENDOR: 003353
DAVID EVANS AND ASSOCIATES, CORPORATE (
1128 NE SECOND STREET #201
CORVALLIS, OR 97330
SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 3/16/2004
Speciallnst:
Req. No.:
Dept.: PUBLIC WORKS
Contact: Paula Brown
Confirming? No
SUBTOTAL
TAX
FREIGHT
TOTAL
131 017.95
0.00
0.00
131,017.95
,cM ~riZedS;;~S-
VENDOR COPY
CITY OF
ASHLAND
REQUISTION FORM
Date of Request:
THIS IS A REQUEST FOR A:
[Xl Change Order (existing PO# 4960)
Required Date of Delivery/Service:
Vendor Name: David Evans & Associates Inc.
Address: 1128 Northeast Second Street Ste 201
City, State, Zip Corvallis OR 97330-6227
Phone: 541/754-0043 Fax: 541/754-7649
Project Title: Ashland Municipal Airport Improvement ProjE~ct
Project Number: 20018.100 (00-18) (AlP Project No. 3-41-0002-(6)
Services Only Solicitation Process:
[ ] Exempt [ ] 3 Written Quotes (copies
attached)
[ ] Sole Source [ ] Invitation to Bid (copies on
file)
[ ] Less than $5000 [ X ] Request for Proposal
(copies on file)
Description Total Cost
Contract Amendment No. 1
Airport Improvement Project
Account Number
280.08.00.00.00.704200
*Please attach the Original signed contract and Insurance Certificates.
Employee Signature:
NOTE: By signing thO
Account Number
f'rP- ~h \V' \
Su pervisorl Dept. Head Signature: M i '1--., ./V~ I ~ .1
certify tha the above request meets with Ctiy of Ashland Solicitiation Process require' ts '5nd can be provided when necessary.
G:Pubwrks\Eng\OO-18 DEA Contract Amend 1 Req 805.xls
Updated on: 7/15/02