ENGINEERING SERVICES CONTRACT
AMENDMENT NO.2
Engineering services contract made on the date specified below in Recital A between the City
and Engineer as follows:
Recitals:
A. The following information applies to this contract:
CITY: CITY OF ASHLAND ENGINEER: Thornton Engineering, Inc.
City Hall
20 E. Main St. Address: 1236 Disk Drive, Suite "I
Ashland, Oregon 97520 Medford OR 97504
(541 ) 488-5347 FAX: (541) 488-6006 Telephone: 541/857-0864 Fax: 541/857-1947
Date of this agreement: April 1 , 2003 B: RFP Date: November 17,2000
Proposal Date: December 14,2000
1[2.3 City Contracting Officer: Director of Public Works, Paula Brown
1[2.4. Project: Bear Creek Trunk Sewer Phase 5, Project No. 2003-05
1[6.1. Engineer's Representative: Michael P. Thornton P.E., President
1[8.3. Maximum Contract Amount: $20,770.00 (see attached proposal)
B. Amendment No. 1
1. Modification to Section 2.4
Increase scope of work beyond the original defined work as follows:
Provide a sub-consultant to provide a geotechnical investigation and design
recommendation regarding expected rock excavation.
2. Modification of Section 8.3
a. Add cost of extra work = $5,514.00
b. Adjusted contract total = $26,284.00
C. Amendment NO.2
. 1. Modification to Section 2.4
Redesign and re-align Section Number 1 (station 0+00 to 5+19.10) of the project
including preparation of an easement description.
2. Modification of Section 8.3
a. Add cost of Amendment NO.1 = $5,514.00
b. Add cost of Amendment NO.2 = $4,716.00
c. Adjust total contract = $31,000.00
ENGINEER
BY~P~
Signature
dck/ P 7hovrl ~YJ
Print,ed Name
Date: j c- /-05
.
CITY
BY ~~
Date: 1/ / 3.--/0 !)
.
Fed. ID # q3- /30C?S:/9
REVIEWED AS TO CONTENT
BY '~/
y Department Head
(/ ~
Date: . Ii ) 2.1 i/'J
Coding
(for City use only)
G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2003\03-05 Contract Amendment No 2 10 05.doc
,~,
CITY RECORDER'S COpy
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
Page 1 / 1
DATE
7/1/2005
IE
PO NUMBER
04079
VENDOR: 003753
THORNTON ENGINEERING, INC
1236 DISK DRIVE SUITE 1
MEDFORD, OR 97501
SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 4/1/2003
Speciallnst:
Req. No.:
Dept.: PUBLIC WORKS
Contact: Paula Brown
Confirming? No
-
',,' ,Unit ',:, " '" ,', '
THIS IS A REVISED PURCHASE ORDER
BLANKET PURCHASE ORDER
EnQineerinQ Services for the Bear Creek
Trunk Sewer Line Construction Phase 5
. '. 'Unit IPrice
eX:t Pric~
20,770.00
RFP
Start Date: April 1 , 2003
Completion Date:
Insurance required/On file
Project #03-05
Revised purchase order 11/18/2003
ChanQe Order NO.1 - Galli Group
Geotechnical Report
Revised purchase order 11/08/2005
ChanQe Order NO.2 - Re-aliQn section
of sewer line
5,514.00
4,716.00
*** This is a chanQe order. ***
BILL TO: Account Payable
20 EAST MAIN ST
541-552-2028
ASHLAND, OR 97520
SUBTOTAL
TAX
IFREIGHT
TOTAL
31 000.00
0.00
0.00
31,000.00
[ih81 ....'..,.,.;:<.. <':0/ " , ,.,;( AUlQUr\i
E 675.08.39.00.70420( 31 000.00
~~///~J-
Autho d Signature
VENDOR COPY
CITY OF
ASHLAND
A request for a Purchase Order
REQUISTION FORM
Date of Request: I :~Qi31l20051
THIS IS A REQUEST FOR A:
[X] Change Order (existing PO# 4079
Required Date of Delive1iy/Service: IASAP ~', I
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:
THORNTON ENGINEERING
1236 DISK DRIVE STE 1
MEDFORD OR 97501
541/857-0864
BEAR CREEK TRUNK SEWER PHASE 5
2003-05
Services Only Solicitation Process:
[ ) Exempt [ ) 3 Written Quotns (copies
attached)
[ ) Sole Source [ ] Invitation to Bid (copies on
file)
[ ) Less than $5000 [X) Request for Proposal I
(copies on file)
Description
Bear Creek Trunk Sewer Phase 5
Total Cost
Change Order No, 1 - Galli Group Geotechnical Report
Change Order NO.2 - Re-align section of sewer line
Employee Signature:
NOTE: By signing this r
Account Number
675.08.39.00.704200
'Please attach the Original signed contract and Insurance CertifICates.
~
Account Number
Supervisorl Cept. Head Signature:
ify tha the above request meets with Ctiy of Ashland So/icitiation Process require! ent and can be provided when necessary.
G:PubwrkslEngl03-05 Change Order No 2
Updated on: 7/15/02