Loading...
HomeMy WebLinkAbout2005-249 CONT AMND #2 - Thornton Engineering ENGINEERING SERVICES CONTRACT AMENDMENT NO.2 Engineering services contract made on the date specified below in Recital A between the City and Engineer as follows: Recitals: A. The following information applies to this contract: CITY: CITY OF ASHLAND ENGINEER: Thornton Engineering, Inc. City Hall 20 E. Main St. Address: 1236 Disk Drive, Suite "I Ashland, Oregon 97520 Medford OR 97504 (541 ) 488-5347 FAX: (541) 488-6006 Telephone: 541/857-0864 Fax: 541/857-1947 Date of this agreement: April 1 , 2003 B: RFP Date: November 17,2000 Proposal Date: December 14,2000 1[2.3 City Contracting Officer: Director of Public Works, Paula Brown 1[2.4. Project: Bear Creek Trunk Sewer Phase 5, Project No. 2003-05 1[6.1. Engineer's Representative: Michael P. Thornton P.E., President 1[8.3. Maximum Contract Amount: $20,770.00 (see attached proposal) B. Amendment No. 1 1. Modification to Section 2.4 Increase scope of work beyond the original defined work as follows: Provide a sub-consultant to provide a geotechnical investigation and design recommendation regarding expected rock excavation. 2. Modification of Section 8.3 a. Add cost of extra work = $5,514.00 b. Adjusted contract total = $26,284.00 C. Amendment NO.2 . 1. Modification to Section 2.4 Redesign and re-align Section Number 1 (station 0+00 to 5+19.10) of the project including preparation of an easement description. 2. Modification of Section 8.3 a. Add cost of Amendment NO.1 = $5,514.00 b. Add cost of Amendment NO.2 = $4,716.00 c. Adjust total contract = $31,000.00 ENGINEER BY~P~ Signature dck/ P 7hovrl ~YJ Print,ed Name Date: j c- /-05 . CITY BY ~~ Date: 1/ / 3.--/0 !) . Fed. ID # q3- /30C?S:/9 REVIEWED AS TO CONTENT BY '~/ y Department Head (/ ~ Date: . Ii ) 2.1 i/'J Coding (for City use only) G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2003\03-05 Contract Amendment No 2 10 05.doc ,~, CITY RECORDER'S COpy CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 Page 1 / 1 DATE 7/1/2005 IE PO NUMBER 04079 VENDOR: 003753 THORNTON ENGINEERING, INC 1236 DISK DRIVE SUITE 1 MEDFORD, OR 97501 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: 4/1/2003 Speciallnst: Req. No.: Dept.: PUBLIC WORKS Contact: Paula Brown Confirming? No - ',,' ,Unit ',:, " '" ,', ' THIS IS A REVISED PURCHASE ORDER BLANKET PURCHASE ORDER EnQineerinQ Services for the Bear Creek Trunk Sewer Line Construction Phase 5 . '. 'Unit IPrice eX:t Pric~ 20,770.00 RFP Start Date: April 1 , 2003 Completion Date: Insurance required/On file Project #03-05 Revised purchase order 11/18/2003 ChanQe Order NO.1 - Galli Group Geotechnical Report Revised purchase order 11/08/2005 ChanQe Order NO.2 - Re-aliQn section of sewer line 5,514.00 4,716.00 *** This is a chanQe order. *** BILL TO: Account Payable 20 EAST MAIN ST 541-552-2028 ASHLAND, OR 97520 SUBTOTAL TAX IFREIGHT TOTAL 31 000.00 0.00 0.00 31,000.00 [ih81 ....'..,.,.;:<.. <':0/ " , ,.,;( AUlQUr\i E 675.08.39.00.70420( 31 000.00 ~~///~J- Autho d Signature VENDOR COPY CITY OF ASHLAND A request for a Purchase Order REQUISTION FORM Date of Request: I :~Qi31l20051 THIS IS A REQUEST FOR A: [X] Change Order (existing PO# 4079 Required Date of Delive1iy/Service: IASAP ~', I Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: THORNTON ENGINEERING 1236 DISK DRIVE STE 1 MEDFORD OR 97501 541/857-0864 BEAR CREEK TRUNK SEWER PHASE 5 2003-05 Services Only Solicitation Process: [ ) Exempt [ ) 3 Written Quotns (copies attached) [ ) Sole Source [ ] Invitation to Bid (copies on file) [ ) Less than $5000 [X) Request for Proposal I (copies on file) Description Bear Creek Trunk Sewer Phase 5 Total Cost Change Order No, 1 - Galli Group Geotechnical Report Change Order NO.2 - Re-align section of sewer line Employee Signature: NOTE: By signing this r Account Number 675.08.39.00.704200 'Please attach the Original signed contract and Insurance CertifICates. ~ Account Number Supervisorl Cept. Head Signature: ify tha the above request meets with Ctiy of Ashland So/icitiation Process require! ent and can be provided when necessary. G:PubwrkslEngl03-05 Change Order No 2 Updated on: 7/15/02