Loading...
HomeMy WebLinkAbout2006-063 CONT Chg Order #1 - Tobiasson Excavation CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 1 BEAR CREEK TRUNK SANITARY SEWER PROJECT: PHASE 5 LOCATION: BEAR CREEK AREA CONTRACTOR: TOBIASSON EXCAVATION INC. You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the Engineer: DATE: MAY 8,2006 PROJECT NO.: 2003-05 Item No. Description Quantitv Unit Price Amount CO 1.0 Extra work to connect to manhole. Lump Sum $2,064.00 $2,064.00 Provide top soil, seeding and ground cover CO 1.1 over pipeline on R. Davis property. Lump Sum $1,500.00 $1,500.00 CO 1.2 Install flow dams in existing sewer line. Lump Sum $1,200.00 $1,200.00 Additional quantities: Bid items 11, 12, 15. $11,082.56 Total this Change Order Previous Change Order Original Contract Revised Contract Total $15,846.56 $0.00 $224,433.23 $240,279.79 The time provided for completion of this contract is increased by 30 calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply. Accepted By: ~ --- . En9;:.z .-- En9;n& ~ I/t)~ ~ ontr ctor T biasson Excavation Inc. 30 5 Highway 66 Ashland OR 97520 .5"- (0 -0(" Date Recommended By: Approved By: ~ 17::"2-1 O~ Date ~ \ \~\{)~ Date \ \ ENGINEERING 20 E. Main Street Ashland, OreQon 97520 WWW.aShland.or.us G:lpub-wrkslengldept-adminIENGINEERIPROJECT\2003105-03 Change Od 1 506.doc Tel: 541-488-5347 Fax: 541-488-6006 TTY: 800-735-2900 r~' ,~, CITY 0 F ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 Page 1 / 1 CITY RECORDER'S COpy "_1_'" P----06j.....22-0....'~ I 8/16/2005 _I ~ ~ VENDOR: 002814 TOBIASSON EXCAVATION INC 3055 HIGHWAY 66 ASHLAND, OR 97520 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: 8/8/2005 Speciallnst: Req. No.: Dept.: PUBLIC WORKS Contact: Jim Olson Confirming? No THIS IS A REVISED PURCHASE ORDER BLANKET PURCHASE ORDER Construction Services for the Bear Creek Trunk Sewer Line Construction Phase 5 224,433.23 Proiect 200305.120 Date of aQreement: June 21, 2005 BeQinninQ date: AUQust 8, 2005 Completion date: 10/05/2005 Insurance required/On file Processed chanQe order OS/25/2006 Manhole connection, landscapinQ, flow dam installation and additional Quantities for items 11, 12, 15. 15,846.56 BILL TO: Account Payable 20 EAST MAIN ST 541-552-2028 ASHLAND, OR 97520 SUBTOTAL TAX FREIGHT TOTAL 24027 .79 0.00 0.00 240,279.79 ~~...s/~ orized Signature 'I: VENDOR COPY A request for a Purchase Order REQUISTION FORM CI T Y OF ASHLAND Date of ReqUest:_ THIS IS A REQUEST FOR A: [Xl Change Order (existing PO# 6220) Required Date of Delivery/Service:_ Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: TOBIASSON EXCAVATION INC. 3055 HIGHWAY 66 ASHLAND OR 97520 BEAR CREEK TRUNK SEWER LINE CONSTRUCTION PHASE 5 2003-05 Services Only Description Total Cost BEAR CREEK TRUNK SEWER LINE CONSTRUCTION Manhole connection, landscaping, flow dam installation and additional quantities for items 11, 12, 15 Account Number 675.08.39.00.704200 'Please attach /he Original signed contract and Insurance Certificates. Account Number Employee Signature: Supervlsorl Depl Head Signature: NOTE: By signing this "'Cfuistiion fonn, I certify tha the above request meets with C/iy of Ashland Solicilia/ion Process requireme G:PubwrkslEngI03-05 Change Order 1 506.x1s Updaled on: 7/15102