HomeMy WebLinkAbout2006-194 CONT Chg Order #1 - Tobiasson Excavation CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 1 PROJECT: 2005 Utility Construction Project DATE: 9/21/06 LOCATION: Granite St, Walnut St, Walker Ave. PROJECT NO.: 2004-07 CONTRACTOR: Tobiasson Excavation Inc. You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the Engineer: Item No. Description Quantitv Unit Price Amount Granite St - Remove concrete CO 1.1 valve vault Lump Sum $710.36 +$710.36 Granite St - Resolve waterline CO 1.2 conflict Lump Sum $693.56 +693.56 Walnut St - Resolve pipeline CO 1.3 conflict Lump Sum $1,126.32 +1,126.32 Walker Ave - Saw cut for trenching mobilization for manhole CO 1.4 construction Lump Sum $1,640.00 +$1,640.00 Elimination of contractor performed CO 1.5 water service taps Lump Sum -$1,000.00 -$1,000.00 Elimination of Schedule C storm CO 1.6 drain construction Lump Sum -$55,067.22 -$55,067.22 City fees for services provided (manhole frame & cover, SS video CO 1.7 inspection, street sweepinQ) Lump Sum -$1,265.32 -$1,265.32 Final reimbursement for materials CO 1.8 on hand payment Lump Sum -$1,246.55 -$1,246.55 Total this Change Order Previous Change Order Revised Contract Total -$54,408.85 $0.00 $305,558.15 ENGINEERING 20 E. Main Street Ashland, OreQon 97520 www.ashland.or.us G:lpub-wrkslengldept-adminIENGINEERIPROJECT\2004104-07 Tobiasson CO 1.doc Tel: 541-488-5347 Fax 541-488-6006 TTY: 800-735-2900 r~' The time provided for completion of this contract is increased by no calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply. Recommended By: Approved By: Accepted By: a~ #O~-- E neer 'J ' ;; /~~f cf~ E;:.f1gineer / Tobiasson Excavation Inc. ~l,~ '3 /2/ /66 Date .2l ~po (. Date ~..~"6 Dat~ "- ENGINEERING 20 E. Main Street Ashland, OreQon 97520 www.aShland.or.us G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2004\04-07 Tobiasson CO 1.doc Tel: 541-488-5347 Fax: 541-488-6006 TTY: 800-735-2900 r~' ~ ~ I \... , , t.. ., ~. .~'V<~) r~ "! l (., r' ,"" D V " ~. ~..-~ ., ",; '~~ ~ ;--~'"t V \.,.\..) J'a. if Page 1 / 1 ~~, CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 .. --'III" ~-' __ I 7/1/2006 I L 06680 . I VENDOR: 002814 TOBIASSON EXCAVATION INC 3055 HIGHWAY 66 ASHLAND, OR 97520 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Tenns: Net Req. Del. Date: 3/20/2006 Speciallnst: Req. No.: Depl: PUBLIC WORKS Contact: Paula Brown Confinnlng? No THIS IS A REVISED PURCHASE ORDER BLANKET PURCHASE ORDER 2005 Utility Construction Proiect Schedule A: Walnut St Sanitary Sewer Schedule B: Granite St Sewer & Water Replacement Schedule C: Walker Ave Storm Drain Processed chanQe order 10/23/2006 Elimination of Payment Schedule C 129,116.00 145,675.00 85,176.00 54,408.85 BILL TO: Account Payable 20 EAST MAIN ST 541-552-2028 ASHLAND, OR 97520 SUBTOTAL TAX FREIGHT TOTAL E 260.08.17.00.70420 E 670.08.18.00.70420 E 675.08.17.00.70420 200407.120 200407.120 200407.120 73 333.96 39 722.56 192 501 .63 ~/' ::d~ A#-. - 2-~a~ Auth zed Signature VENDOR COPY CITY OF ASHLAND A request for a Purchase Order REQUISTION FORM Date of Request: THIS IS A REQUEST FOR A: [X] Change Order (existing POI 6680) Required Date of Delivery/service:_ Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: Services Only Description TOBIASSON EXCAVATION INC. 3055 HIGHWAY 66 ASHLAND OR 97520 2005 UTILITY PROJECT 2004-07 2005 UTILITY CONSTRUCTION PROJECT Total Cost Elimination of Payment Schedule C Employee Signature: NOTE: By signing this Account Number 675.08.17.00.704200 = 85% Account Number 675.08.39.00.704200 = 15% Account Number 260.08.17.00.702400 = 65010 ($3,536.75) Account Number Supervlsorl Depl Head Signature: , I certify tha the above request meets with Ctiy of Ashland Solicitialion Process requirem G:PubwrI<sIEngIQ4..07 Tobiasson Exc CO 1 Req.xls Updated on: 7/15102